Moulton Texas Directional Boring: Carbengle Soil, Lavaca River and Union Pacific
Quick Answer: Texas State Highway 95 is a main route to plan around, and Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Moulton, Texas. Union Pacific track adds another crossing to check before choosing the bore path. From our Yukon, Oklahoma main office, Moulton is 452 road miles away, so a route near Lavaca Drive matters to mobilization. Carbengle loam covers 49 percent of the mapped area, and clay below can cling to the reamer and grip pipe.
Moulton bores at a glance
- Incorporated city in Lavaca County, Texas. Population 858 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 452 miles, about 9.1 hours of driving.
- Ground: Carbengle soil is mapped on 49 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 57 percent of the area.
- Highways inside the boundary: Texas State Highway 95, FM 532 and FM 1680. State permit office: TxDOT Yoakum District.
- Railroad track inside the boundary: Union Pacific, with 7 mapped street and rail crossings.
- Named streams inside the boundary: Lavaca River and West Prong Lavaca River.
- Public water: City of Moulton, groundwater wells.
- Electric: City of Moulton municipal electric system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles boring near the Lavaca River in Moulton?
We take directional boring work in Moulton, an incorporated town in Lavaca County. We use the Census Bureau Vintage 2024 estimate of 858 residents when planning underground work in Moulton. Our crews install water, sewer, gas, electric conduit and fiber for routes along streets such as Lavaca Drive, or for crossings near the Lavaca River. The proposed path and utility owner guide the plan.
Our main office is in Yukon, Oklahoma, and Moulton work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We started as a family business in 1965 and have drilled directionally since 1982. That record matters around the City of Moulton water system and its 673 service connections: we have had no utility strike in over 25 years.

What does the soil survey show about Carbengle soil in Moulton?
The USDA soil survey maps Carbengle loam across 49 percent of Moulton, with Frelsburg clay at 28 percent and Cuero sandy clay loam at 9 percent. At about 40 inches below the surface, the survey maps bedrock in 49 percent of the area and clay in 39 percent. Average clay content at that depth is 46 percent. We treat mapped patterns for Moulton as planning context, not as test borings. Clay can stay packed around the reamer and swell against pipe, so the route needs to be judged against site conditions.
| USDA soil survey, inside the Moulton city limits | What is mapped |
|---|---|
| Soil series mapped | Carbengle 49 percent, Frelsburg 28 percent, Cuero 9 percent, Greenvine 8 percent and Navaca 3 percent |
| Texture at the surface | loam 49 percent, clay 33 percent and sandy clay loam 9 percent |
| Texture about 40 inches down | bedrock 49 percent, clay 39 percent and sandy clay loam 9 percent |
| Engineering class about 40 inches down | fat clay (CH) 39 percent and clayey sand (SC) 12 percent |
| Average clay content about 40 inches down | 46 percent |
| Bedrock mapped within 60 inches | 57 percent of the area (0 percent hard rock, 57 percent weathered rock) |
| Seasonal water table within 60 inches | 3 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 42 percent of the area |
The USDA soil survey maps weathered bedrock within 60 inches across 57 percent of Moulton, with typical depth listed as 34 inches; hard bedrock is not mapped at that depth. Oakville Sandstone, a Miocene unit of sandstone and clay, is the mapped geology. Seasonal water table and flood prone soils each appear across 3 percent of the area. High steel corrosion risk is mapped across 42 percent, so the line owner should consider casing and tracer wire materials; HDPE is unaffected by that soil concern.
How do we drill through the bedrock mapped in Moulton?
Carbengle soil and weathered bedrock call for a plan that can change with the ground. We track the drill head from the surface, log depth and pitch, and keep the bore path clear of marked lines near Lavaca Drive.
- At Carbengle clay, we use thinner drilling fluid and staged reaming to keep sticky soil from loading the reamer, then pull pipe before the open hole tightens.
- Where the USDA survey maps weathered bedrock near the 34 inch typical depth, we slow the advance and watch for the soil to rock contact shifting the head.
- Before drilling near a marked utility, we hydrovac pothole it; this is essential on a proposed route beneath Pecan Drive because paint gives position, not depth.
- Near the Lavaca River, we plan the bore below the channel and check jurisdiction during planning; pits stay on the banks rather than cutting the crossing.

Which roads, tracks or creeks could a Moulton bore cross near Lavaca Drive?
Texas State Highway 95, FM 532 and FM 1680 run inside Moulton, so a route crossing any of them needs its own clearance and bore plan. The longest named streets are Lavaca Drive at 1.39 miles, Depot Street at 1.31 miles and Pecan Drive at 1.31 miles within town. A map pin shows whether the path meets state highway right of way or stays on a city street. Under existing highway pavement, the line is bored or tunneled rather than open trenched.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 95 | State highway | 1.4 roadway miles inside | State highway office |
| FM 532 | State highway | 0.6 roadway miles inside | State highway office |
| FM 1680 | State highway | 0.6 roadway miles inside | State highway office |
| Union Pacific | Railroad | 1.86 track miles inside | The railroad |
| Lavaca River | Stream | 0.27 channel miles inside | Checked for Corps of Engineers jurisdiction |
| West Prong Lavaca River | Stream | 0.25 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Kuehns Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 1.86 track miles within Moulton, and public mapping shows 7 street and rail crossings. A route under the Cuero Subdivision needs railroad coordination before the crossing is set. The Lavaca River and West Prong Lavaca River have 0.27 and 0.25 channel miles in town, and 2 street crossings of named streams are mapped. A creek route is checked for federal waterway jurisdiction during planning.
Who approves a Moulton bore near Texas State Highway 95?
For work in Texas State Highway 95 right of way, the utility owner files the utility permit in TxDOT’s online RULIS system; the driller does not file it. TxDOT’s Yoakum District reviews the application, and we prepare the bore plan and profile for the owner to submit. Electric and communication lines crossing the highway need 60 inches of cover below the lowest crossed grade, and lines running along the right of way need 48 inches. Water lines need 60 inches at crossings or 36 inches along the right of way; pressurized sewer needs 60 inches at crossings. A railroad bore under Union Pacific needs an agreement with the railroad, and Lavaca River crossings are checked for federal jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Moulton and Lavaca County?
The City of Moulton public water system uses groundwater wells and reports 673 service connections serving 857 people. The city also owns its municipal electric system, which reports 667 customers. For an electric conduit route near Pecan Drive, we confirm the line owner’s requirements before setting the bore plan. That step identifies whose facilities the proposed path must avoid or connect to.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Moulton | Public water system | Groundwater wells | 673 connections, 857 people served |
| City of Moulton municipal electric system | City owned electric system | Reports to the U.S. Energy Information Administration | 667 customers reported |
| Fayette Electric Cooperative, Guadalupe Valley Electric Cooperative, Jackson Electric Cooperative and San Bernard Electric Cooperative | Electric utilities reporting service in Lavaca County | EIA Form 861 | Confirm the line owner by address |
We use Moulton’s 1966 median housing year from the American Community Survey 2019 to 2023 five year estimates to inform underground planning. We account for Moulton’s housing profile: 36 percent before 1960, 54 percent from 1960 to 1999, and 10 percent in 2000 or later when planning underground work. That mix can mean replacement work alongside new services near Depot Street. We hydrovac pothole every marked utility on the bore path before drilling near it; for a proposed route beneath Lavaca Drive, paint shows position, not depth.

How far is Moulton from Gonzales and nearby towns?
Moulton is in Lavaca County, at an elevation of 399 feet, and covers 0.84 square miles. ZIP code 77975 serves the town. Flatonia is 8.5 miles north, Shiner is 9.7 miles south, and Waelder is 12.4 miles northwest. Hallettsville, the county seat, is 15.1 miles southeast; Gonzales, the nearest larger city, is 18.5 miles west. From our Yukon, Oklahoma main office, the road trip is 452 miles and 9.1 hours, which affects mobilization for a bore on Texas State Highway 95 or a rural route.
Places near Moulton
- Directional boring in Flatonia: 8.5 miles north
- Directional boring in Shiner: 9.7 miles south
- Directional boring in Waelder: 12.4 miles northwest
- Directional boring in Hallettsville: 15.1 miles southeast
- Directional boring in Schulenburg: 16.2 miles northeast
- Directional boring in Gonzales: 18.5 miles west
What would we bore near Depot Street in Moulton?
- Highway crossing: A bore beneath Texas State Highway 95 keeps the pavement intact and is planned to meet the applicable TxDOT cover and right of way conditions.
- Water service: A connection near the City of Moulton water system can follow a proposed route from a street main without cutting across Lavaca Drive.
- Fiber route: A conduit bore along Depot Street can avoid open trenching through pavement, with marked utilities exposed before drilling approaches them.
- Creek crossing: A proposed Lavaca River bore is planned beneath the channel, with its route checked for jurisdiction during planning.
- Rail crossing: A route beneath Union Pacific track needs a railroad agreement that sets the crossing conditions before the bore plan is finalized.
- Street utility: Work near Pecan Drive can place water, sewer or electric conduit below the street surface, subject to the line owner’s plans.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for Moulton work near Union Pacific?
Start with a map pin or address; the exact point shows whether a proposed route meets Lavaca Drive, Union Pacific track or the Lavaca River. For Moulton underground work, we need the planned material, pipe or conduit size, and footage before preparing a boring plan. A sketch or plans help us see the entry and exit pits and any nearby crossings before we set the scope.
The scope, not footage alone, sets the price. Carbengle clay and weathered bedrock affect drilling time; a Union Pacific crossing or Texas State Highway 95 right of way adds coordination and design needs. We also account for pipe size, exposed utilities, pavement, creek crossings, pits, excavator time and sand backfill. Moulton’s 452 road miles from Yukon affect mobilization, and emergency or high profile work can change the planning required.
Questions people ask about boring in Moulton
Does Trinity take directional boring jobs in Lavaca County near Moulton?
Yes. We take directional boring work across Texas, including Moulton in Lavaca County. Our own crews handle the work, with support from satellite yards run by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, whether the route is near Lavaca Drive or outside town.
What does a Moulton bore beneath Union Pacific track require?
A crossing beneath Union Pacific track needs an agreement from the railroad that owns it. We plan crossing details under the agreement, including casing, depth, and flagging, before boring in Moulton. Moulton has 1.86 track miles within town, so share the route and crossing point early enough to plan the bore profile around the Cuero Subdivision.
Can a utility line be bored beneath the Lavaca River in Moulton?
A line can be planned beneath the Lavaca River, subject to site conditions and the required planning review. The river has 0.27 channel miles in Moulton. We plan the bore to pass below the channel and check whether the crossing falls under U.S. Army Corps of Engineers jurisdiction.
Who runs Moulton’s public water system, and where does its water come from for underground work planning?
The City of Moulton owns and runs the public water system, which draws from groundwater wells. Public records report 673 service connections and 857 people served. If a proposed service route near Pecan Drive connects to that system, the water line owner and route still need to be confirmed for the job.
Who owns electric lines in Moulton and Lavaca County, and who confirms conduit specs?
The City of Moulton owns its municipal electric system, which reports 667 customers. Confirm conduit requirements with the owner of the line at the specific address before planning a bore near Depot Street. The county also has other utilities reporting electric service, so do not assume the city system serves every location.
Does Moulton control Pecan Drive, and does a bore have to cut it?
Moulton is incorporated, so its city streets are under city control. A bore beneath Pecan Drive can avoid cutting the street surface, subject to the approved route and site conditions. We expose marked utilities on the bore path before drilling near them, since surface marks show location but not depth.
Does Trinity cover Flatonia and rural sites outside Moulton?
Yes. We take work in nearby Flatonia, 8.5 miles north of Moulton, as well as rural sites outside town. The Yukon office is 452 road miles from Moulton, so distance and access factor into mobilization. Send the location and proposed route, whether it is near Texas State Highway 95 or elsewhere.
How early should I request a Moulton locate before boring near Lavaca Drive?
Count back at least 48 hours from the planned excavation start, excluding Saturdays, Sundays and legal holidays, and do not request a locate more than 14 days ahead. Texas811 handles the request for a proposed bore near Lavaca Drive. If the start slips more than 14 days past the original notice, submit a new request; refresh worn or moved marks before work continues.
What affects the cost of a Moulton bore near Texas State Highway 95?
The price depends on the route and scope, including length, pipe or conduit size, Carbengle clay or weathered bedrock, and utilities that must be exposed. Texas State Highway 95, pavement, creek crossings, pits and equipment time can add work. Mobilization from Yukon is also part of the job because Moulton is 452 road miles away.
Where the Moulton facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Moulton
- U.S. Census Bureau, TIGER/Line 2024: Moulton boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Moulton
- U.S. Census Bureau, American Community Survey 2019 to 2023: Moulton housing units and year built
- Macrostrat geologic map compilation: map units under Moulton
- U.S. EPA Safe Drinking Water Information System: public water systems serving Moulton
- U.S. Department of Transportation, North American Rail Network: track owners in Lavaca County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Lavaca County
- U.S. Geological Survey, Elevation Point Query Service: Moulton elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Moulton
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Moulton
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Moulton, Texas
Type the address of your job in Moulton. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Moulton
Same county: Yoakum. All counties: Texas county list.
