Coahoma Texas Directional Boring: Amarillo Soil, Interstate 20 and Union Pacific
Quick Answer: Coahoma is an incorporated town, so 1st Street and other town streets belong to the town itself. We take directional boring, also called horizontal directional drilling (HDD), work in Texas for routes beneath Interstate 20 and the Union Pacific track in Coahoma. Our Yukon main office is 377 road miles away, with Interstate 20 running through town. Amarillo soil is common here, and sandy clay loam at about 40 inches can grip the pipe during a pull.
Coahoma bores at a glance
- Incorporated city in Howard County, Texas. Population 919 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 377 miles, about 7.4 hours of driving.
- Ground: Amarillo soil is mapped on 64 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Interstate 20 and FM 820. State permit office: TxDOT Abilene District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Public water: City of Coahoma, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near Sandy Hollow in Coahoma?
Coahoma is an incorporated town in Howard County, with a population of 919 in the Census Bureau Vintage 2024 estimate. We install water, sewer, gas, electric conduit and fiber, including routes along Main Street or service connections near the City of Coahoma water system. We plan each bore around the route and the lines already in the ground.
Our main office is in Yukon, Oklahoma, and Coahoma work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We started our family business in 1965 and have provided directional boring since 1982 for Coahoma projects. For Coahoma routes near Sandy Hollow, our range covers 3/4 inch service lines up to 48 inch casing and bore lengths from 10 feet to 5,000 feet.

What is Amarillo soil like to bore in Coahoma?
The USDA soil survey maps Amarillo series across 64% of Coahoma, including Amarillo fine sandy loam and Amarillo loamy fine sand. Fine sandy loam makes up 36% of mapped surface texture, and loamy fine sand makes up 34%. About 40 inches down, the survey maps sandy clay loam across 95% of the area; average clay content at that depth is 25%. For Coahoma planning, we treat mapped soil patterns as reference information, not as test borings for a bore path. The mix matters: surface sand can loosen behind a bit, while the deeper clay can hold and grip the hole.
| USDA soil survey, inside the Coahoma city limits | What is mapped |
|---|---|
| Soil series mapped | Amarillo 64 percent, Acuff 17 percent, Brownfield 13 percent and Springer 3 percent |
| Texture at the surface | fine sandy loam 36 percent, loamy fine sand 34 percent and loam 17 percent |
| Texture about 40 inches down | sandy clay loam 95 percent and fine sandy loam 3 percent |
| Engineering class about 40 inches down | lean clay (CL) 53 percent, clayey sand (SC) 44 percent and silty clayey sand (SC SM) 3 percent |
| Average clay content about 40 inches down | 25 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
We use Coahoma mapping showing no bedrock in the top five feet, while allowing for possible deeper rock. The map also shows Eolian Sheet Sand of Quaternary age and Cenozoic sedimentary rocks of Paleocene age. Seasonal water table and flood prone soils are not mapped, and high steel corrosion risk is not mapped. The sandy surface may need staged reaming to keep the hole open; deeper clay can ball on a reamer and grip pipe. The mapped ground does not call for a shallow water table plan, but the actual route still guides the bore setup.
How do crews handle sandy clay loam in Coahoma?
Coahoma’s mapped sand over sandy clay loam calls for a plan that keeps the hole open without overworking the deeper clay. The drill head is tracked from the surface, with depth and pitch recorded as it advances.
- At the Amarillo sandy surface, we use drilling fluid to support the hole and ream in stages so loose sand does not fall in behind the bit.
- Where Coahoma’s mapped sandy clay loam lies deeper, we adjust fluid and reaming to limit clay buildup, then pull pipe while the hole is ready.
- For a route near Interstate 20 pavement or a Main Street slab, we keep fluid pressure controlled so returns do not lift the surface.
- Before the drill approaches a marked line near the City of Coahoma water system, we expose it with hydrovac and track depth and pitch from the surface.

Which roads, tracks or creeks can a bore cross in Coahoma near 1st Street?
Interstate 20 and FM 820 run inside Coahoma, with 2.3 mapped roadway miles of Interstate 20 and 1.2 miles of FM 820 in town. For a route near either road, the pavement and right of way shape the bore plan. 1st Street is the longest named street at 1.03 miles, followed by Main Street at 0.88 miles and Echols Drive at 0.78 miles. A bore under a street can leave its surface uncut, with entry and exit pits placed in the dirt.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 20 | Interstate | 2.3 roadway miles inside | State highway office |
| FM 820 | State highway | 1.2 roadway miles inside | State highway office |
| Union Pacific | Railroad | 1.47 track miles inside | The railroad |
| Sandy Hollow | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
| Guthrie Draw | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Guthrie Draw | Lake or pond | 14 acres, nearby | Checked for Corps of Engineers jurisdiction |
Union Pacific has 1.47 track miles inside Coahoma on the Toyah Subdivision, and public mapping shows 2 street and rail crossings. A route beneath the track needs railroad coordination. No named stream runs inside town, and no street crossing of a named stream is mapped there. Sandy Hollow is 0.7 miles from the limits, and Guthrie Draw is 0.9 miles away; the nearby Guthrie Draw pond is outside town. A creek route would need its own depth and access plan.
Whose permission does a Coahoma bore need near Union Pacific?
Coahoma’s incorporated town streets belong to the town, while Interstate 20 and FM 820 right of way work needs a TxDOT utility permit. For a highway crossing, electric and communication lines need at least 60 inches of cover below the lowest crossed grade; water lines also need 60 inches, and pressurized sewer lines need 60 inches. TxDOT’s Abilene District reviews the application in RULIS, which the utility owner files. We prepare the bore plan and profile for that filing and work under the owner’s permit. A Union Pacific track crossing needs an agreement with the railroad, and Sandy Hollow’s jurisdiction is checked during crossing planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Howard County near Coahoma?
The City of Coahoma public water system uses purchased surface water and lists 1,387 service connections serving 3,552 people. That gives a bore near the system a known local water utility to coordinate with. Oncor Electric Delivery Company and Lyntegar Electric Cooperative report electric service in Howard County. We confirm the line owner for the specific route before planning an electric conduit bore, since countywide reporting does not identify the provider at every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Coahoma | Public water system | Surface water bought from another system | 1,387 connections, 3,552 people served |
| Oncor Electric Delivery Company and Lyntegar Electric Cooperative | Electric utilities reporting service in Howard County | EIA Form 861 | Confirm the line owner by address |
We treat Coahoma’s American Community Survey 2019 to 2023 five year estimates placing the median housing year at 1962 as background when planning underground work. The survey estimates 46% of homes were built before 1960, 38% from 1960 to 1999 and 16% in 2000 or later. Replacement work near Main Street may meet older buried services, while newer connections can follow a different route. We hydrovac pothole each marked utility on the bore path before drilling near it; for example, a proposed line under Main Street needs its marked crossings exposed first because paint shows location, not depth.

Do you cover Coahoma and nearby Big Spring?
Coahoma is in Howard County at an elevation of 2,413 feet and covers 1.23 square miles. We use Coahoma ZIP codes 79511 and 79720 to confirm the service location before coordinating underground work. Sand Springs is 2.5 miles southwest, Big Spring is 11.1 miles west, and Forsan is 13.2 miles south. Big Spring is both the county seat and the nearest larger city. From our Yukon yard, Coahoma is 377 road miles away and a 7.4 hour drive, so distance is part of planning mobilization for a bore near Interstate 20.
Places near Coahoma
- Directional boring in Sand Springs: 2.5 miles southwest
- Directional boring in Big Spring: 11.1 miles west
- Directional boring in Forsan: 13.2 miles south
- Directional boring in Westbrook: 17.8 miles east
- Directional boring in Lake Colorado City: 22 miles east
Which jobs call for a bore near Main Street in Coahoma?
- Highway crossing: A bore beneath Interstate 20 or FM 820 keeps the roadway surface intact, with the route planned for the right of way.
- Street service: A water, sewer or conduit line along Main Street can pass beneath pavement with pits set beyond the work area.
- Rail crossing: A proposed line beneath the Union Pacific Toyah Subdivision needs a route and casing plan coordinated with the railroad.
- Water connection: A service route near the City of Coahoma water system needs the existing water and other marked lines exposed before drilling.
- Creek approach: A route toward Sandy Hollow needs depth and access planning, with crossing jurisdiction checked during planning.
- Fiber conduit: A fiber route near 1st Street can be bored beneath the street instead of opening the pavement.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Coahoma bore near Interstate 20?
For a quote near Interstate 20, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route along Main Street or FM 820 also helps us see the likely crossings and access points before we plan the work.
The route and work conditions drive the price. A short service line through Amarillo fine sandy loam with few crossings is simpler to plan than a longer run through deeper sandy clay loam. Interstate 20 pavement, Union Pacific track, concrete, exposed utilities, creek access, pits, excavator time and sand backfill can add work. Yukon’s 377 road miles from Coahoma shape how we schedule mobilization for a boring project. For Coahoma jobs, we account for high profile or emergency conditions because either can change our planned scope before scheduling.
Questions people ask about boring in Coahoma
Does Trinity take directional boring work in Coahoma and Howard County, and who staffs it?
Yes. We take directional boring work in Coahoma, and our crews or crews from partner drilling contractors Trinity has vetted can staff the work. We handle Coahoma calls through the bore log, maintaining one point of contact regardless of which crew is on site. A route near Main Street still gets planned around its marked utilities and access.
What do Coahoma’s older homes along Main Street mean for replacement bores?
The American Community Survey 2019 to 2023 estimates give Coahoma a median housing year of 1962, with 46% of homes built before 1960. A replacement route near Main Street may encounter older buried services, but age alone does not establish their location. We expose marked utilities before the drill approaches them and plan the bore around what is found.
What ground does an Amarillo soil bore pass through in Coahoma?
The USDA soil survey maps Amarillo series across 64% of Coahoma. At about 40 inches down, sandy clay loam is mapped across 95% of the area, with average clay content of 25%. Those mapped patterns suggest surface sand that can loosen and deeper clay that can grip the pipe, so reaming and fluid need to suit the route.
Will a bore in Coahoma hit rock below the surface?
Bedrock is not mapped in Coahoma’s top five feet, which does not rule out rock deeper down. The geologic map includes Eolian Sheet Sand of Quaternary age and Cenozoic sedimentary rocks of Paleocene age. A route near Interstate 20 still needs planning for the conditions encountered along its actual alignment.
Who approves a Coahoma bore under Interstate 20?
TxDOT reviews work in Interstate 20 right of way through its Abilene District. The utility owner submits the application in RULIS, and we prepare the bore plan and profile for the owner’s filing. The permit sets the approved crossing conditions, so the route and cover plan must match the issued permit.
What do we need to plan for a Coahoma bore under Union Pacific track?
A crossing beneath Coahoma’s Union Pacific Toyah Subdivision needs an agreement from the railroad that owns the track. The agreement establishes the crossing conditions, including casing, depth and flagging. Public mapping shows 1.47 track miles inside town, so the proposed route needs to be checked against the actual track location.
How early should I request Coahoma 811 marks for a bore near 1st Street?
For a 1st Street excavation, request a Texas811 locate at least 48 hours before work, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. For Coahoma starts, we make a new request if the start slips more than 14 days past the original notice. In Coahoma, we have marks refreshed through Texas811 if they wear off or move before boring work continues.
How far is Coahoma from the Yukon office, and does Big Spring affect the job?
Coahoma is 377 road miles and a 7.4 hour drive from our Yukon main office. Big Spring is 11.1 miles west of Coahoma and is the county seat. That distance from Yukon can affect mobilization planning for a bore near Interstate 20, while the route itself determines equipment and crossing needs.
What affects the cost of a directional bore in Coahoma near Interstate 20?
The job’s length, pipe or conduit size, ground, crossings, pavement, pits and equipment needs shape the price. Amarillo soil and deeper sandy clay loam affect drilling and reaming; Interstate 20 or Union Pacific crossings add coordination and route requirements. Mobilization also reflects Coahoma’s 377 road miles from Yukon. For Coahoma jobs, we account for high profile or emergency conditions because either can change our planned scope before scheduling.
Where the Coahoma facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Coahoma
- U.S. Census Bureau, TIGER/Line 2024: Coahoma boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Coahoma
- U.S. Census Bureau, American Community Survey 2019 to 2023: Coahoma housing units and year built
- Macrostrat geologic map compilation: map units under Coahoma
- U.S. EPA Safe Drinking Water Information System: public water systems serving Coahoma
- U.S. Department of Transportation, North American Rail Network: track owners in Howard County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Howard County
- U.S. Geological Survey, Elevation Point Query Service: Coahoma elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Coahoma
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Coahoma
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Coahoma, Texas
Type the address of your job in Coahoma. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Coahoma
All counties: Texas county list.
