trinityboringsolutions.com

Fulton Texas Directional Boring: Galveston Soil, Fine Sand and Interstate 35

Quick Answer: We take directional boring and horizontal directional drilling (HDD) work in Fulton, where Interstate 35 and Texas State Highway 35 shape crossing plans. Fulton Beach Road, Mesquite Street and Myrtle Street are among the longest named streets in the town’s 32.2 public road miles. Interstate 35 runs through the limits, and our Yukon yard is 592 road miles away. Fine sand is common in the USDA soil survey, so the open hole needs support against caving.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Fulton bores at a glance

  • Incorporated city in Aransas County, Texas. Population 1,612 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 592 miles, about 11.4 hours of driving.
  • Ground: Galveston soil is mapped on 33 percent of the area, with fine sand about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 35, Texas State Highway 35, FM 3036 and Texas State Highway 35 Business. State permit office: TxDOT Corpus Christi District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Interstate 35 in Fulton?

Mesquite Street, Myrtle Street and Fulton Beach Road are among Fulton’s longest named streets. The town has 32.2 public road miles, with Interstate 35 and Texas State Highway 35 among the routes through its limits. The Census Bureau Vintage 2024 estimate puts Fulton’s population at 1,612 in Aransas County. We install water, sewer, gas, electric conduit and fiber for routes along these streets or beneath a road where the approved plan calls for a bore.

Our main office is in Yukon, Oklahoma, and Fulton work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Trinity is a family business that started in 1965 and has done directional boring since 1982. Our longest bore ran roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa; a Fulton job beside Mesquite Street would be planned around its own shorter route and ground.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath Fulton and Galveston soil?

The USDA soil survey maps Galveston Mustang complex across 33 percent of Fulton and Mustang fine sand across 14 percent. Lydiann fine sand accounts for another 10 percent, while 43 percent is mapped as water. Fine sand covers 57 percent of the mapped area at the surface and also at about 40 inches below it. Average clay at that depth is 1 percent. These are mapped soil patterns, not test borings; along Fulton Beach Road, the actual bore path still needs site specific planning.

USDA soil survey, inside the Fulton city limitsWhat is mapped
Soil series mappedGalveston 33 percent, Mustang 14 percent and Lydiann 10 percent
Texture at the surfacefine sand 57 percent
Texture about 40 inches downfine sand 57 percent
Engineering class about 40 inches downsilty sand (SM) 47 percent and sand with silt (SP SM) 10 percent
Average clay content about 40 inches down1 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches47 percent of the area
Flood prone soils47 percent of the area
High corrosion risk for uncoated steel0 percent of the area

At about 40 inches, the survey maps sandy soil and SM or SP SM material, which can loosen around a bore. We use Fulton’s Galveston, Mustang, and Lydiann soil series as context; bedrock is not mapped in the top five feet, so deeper conditions remain unknown. Seasonal water tables fall within 60 inches across 47 percent of the area, and flood prone soils cover 47 percent. The survey maps no high steel corrosion risk. Its Beach and near shore marine sand unit is Late Pleistocene; wet sand near the mapped Galveston soils can flow into pits, so pit size and pumping matter.

How do we bore Fulton’s fine sand?

Fulton’s fine sand is easy to cut but can fall back behind the drill head. Along streets such as Mesquite Street, we plan the fluid, reaming and pipe handling around that risk and the mapped seasonal water table.

  1. We select fluid and reaming steps for Fulton’s mapped fine sand, which can cave behind the bit, and have the pipe ready before the final ream.
  2. Where the seasonal water table mapped in Fulton may fill pits, we plan smaller excavations and pumping; wet sand needs attention at entry and exit points.
  3. Before a drill nears marked lines beside Mesquite Street, we hydrovac pothole to expose them because surface paint does not show depth.
  4. A walkover locator tracks the drill head along the Fulton route, while depth and pitch readings are logged as the bore advances.
6 inch PVC sleeve coming out of the bore pit wall in red sandy soil with the Trinity water trailer behind, northeast Oklahoma City
A 6 inch PVC sleeve coming out of the bore pit wall in red sandy soil in northeast Oklahoma City.

What does a bore have to cross near Interstate 35 in Fulton?

Interstate 35 has a mapped 0.2 roadway miles inside Fulton, while Texas State Highway 35 has 2.7 and FM 3036 has 1.3. Texas State Highway 35 Business also passes through the limits. The longest named streets include Fulton Beach Road at 2.02 miles, Mesquite Street at 1.12 and Myrtle Street at 1.05. A bore near any of these routes needs its path checked against the actual right of way, pavement and marked utilities before the entry and exit pits are set.

CrossingTypeMapped extentWho has a say
Interstate 35Interstate0.2 roadway miles insideState highway office
Texas State Highway 35State highway2.7 roadway miles insideState highway office
FM 3036State highway1.3 roadway miles insideState highway office
Texas State Highway 35 BusinessState highway0.1 roadway miles insideState highway office
Canoe LakeLake or pond11 acres, nearbyChecked for Corps of Engineers jurisdiction
Turkey NeckLake or pond5 acres, nearbyChecked for Corps of Engineers jurisdiction
Claude South CoveLake or pond2 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Fulton or within one mile outside its limits, and the street and rail crossing inventory records none. No streams are mapped in the town or within one mile, so the inventory shows no named stream crossing for a bore. Canoe Lake, Turkey Neck and Claude South Cove are mapped within one mile, outside the town limits. If a proposed route crosses a lake, its planning includes a check for U.S. Army Corps of Engineers jurisdiction.

Do I need a permit to bore under roads in Aransas County in Fulton?

Fulton is incorporated, so its city streets, including Mesquite Street and Fulton Beach Road, belong to the town itself. For work within the right of way of Interstate 35, Texas State Highway 35, FM 3036 or Texas State Highway 35 Business, the line owner files the utility permit through TxDOT’s RULIS system; the TxDOT Corpus Christi District reviews it. For an owner’s Fulton application, we prepare the bore plan and profile around Texas State Highway 35 Business crossings. At highway crossings, electric and communication lines need 60 inches of cover, water lines 60 inches and pressurized sewer lines 60 inches. Along the right of way, the stated cover is 48 inches for electric and communication lines and 36 inches for water; the district can require another depth.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities may have lines in Aransas County near Fulton?

The water provider for a specific Fulton address has to be confirmed with the town, Aransas County or the local water district before a bore is planned; EPA records do not match a system to the town. AEP Texas Central and San Patricio Electric Cooperative report electric service in the county, but that does not identify the line owner at every Fulton address. We confirm the owner before planning an electric conduit bore near Fulton Beach Road or another route.

Line ownerWhat it isSourceSize
AEP Texas Central and San Patricio Electric CooperativeElectric utilities reporting service in Aransas CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Fulton’s median housing year at 2000, which does not determine our bore depth. We keep Fulton’s home age mix separate from bore depth: 7 percent were built before 1960, 43 percent from 1960 to 1999, and 50 percent in 2000 or later. Those figures describe housing, not buried line age, but they help frame a replacement bore versus a new service near Mesquite Street. Before drilling, we hydrovac pothole every marked utility on the path; paint does not show its depth, and the mix of housing ages can mean different lines are present.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

What is near Fulton and Lamar in Aransas County?

Fulton is an incorporated town in Aransas County, with 1.41 square miles of land and an elevation of 16 feet. ZIP codes are 78358 and 78382. Rockport, the county seat and nearest larger city, is 1.8 miles south; Lamar is 5.6 miles northeast, and Holiday Beach is 6.8 miles north. Bayside is 10.6 miles west and Aransas Pass is 11.6 miles south. Our Yukon, Oklahoma yard is 592 road miles away, a drive listed as 11.4 hours, so the distance is part of planning mobilization for a Fulton Beach Road job.

Places near Fulton

What would we bore near Mesquite Street in Fulton?

  • Highway crossing: A proposed crossing under Interstate 35 needs a route and bore plan that fit the TxDOT right of way and cover requirements.
  • Street service: A water or sewer route near Mesquite Street can be bored beneath pavement, with pits placed beyond the planned crossing.
  • Fiber conduit: A conduit route along Fulton Beach Road needs marked utilities exposed where they meet the proposed bore path.
  • Electric conduit: Near Texas State Highway 35, the line owner and applicable right of way permit need to be settled before drilling.
  • Lake crossing: A proposed route near Canoe Lake needs a site specific path and a check for federal water jurisdiction during planning.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for Fulton Beach Road work in Fulton?

A map pin on Fulton Beach Road matters because a small shift can put a proposed bore near a different pavement edge, right of way or marked utility. Include the address, what will go underground, the pipe or conduit size and the footage. A sketch or plans showing the route help us assess the crossing and pit locations in Fulton.

The 592 road miles from Yukon are part of the mobilization picture for a Fulton job. Fine sand and the seasonal water table mapped around Galveston and Mustang soils affect drilling and pit work; a crossing under Interstate 35 or work beside pavement adds its own requirements. Price also reflects bore length, pipe size, utilities to expose, concrete, creek or drainage crossings, pits, excavator time, sand backfill and emergency or high profile work. A map pin near Fulton Beach Road helps define the actual scope.

Questions people ask about boring in Fulton

Does Trinity Boring Solutions take directional boring jobs in Fulton, Aransas County, and who staffs them?

Yes. We take directional boring work in Fulton, Aransas County, using our own crews and partner drilling contractors from satellite yards. You work with Trinity from the first call through the bore log, including a job near Fulton Beach Road, regardless of which crew is on site.

Who owns electric lines in Fulton, Aransas County, and who confirms conduit specs?

AEP Texas Central and San Patricio Electric Cooperative report service in Aransas County, but that does not establish which utility owns a line at a Fulton address. The line owner needs to be confirmed before a conduit bore, including one near Texas State Highway 35, so conduit requirements can be checked with the responsible utility.

Does the town or county control Myrtle Street in Fulton, and can a bore avoid cutting it?

Fulton is incorporated, so Myrtle Street is a town street rather than a county road. Directional boring can place a line beneath the pavement without an open cut through the street when the site and approved plan allow it. The route still needs utility locates and suitable pit locations on Myrtle Street.

How old are homes and buried lines near Mesquite Street in Fulton?

The American Community Survey 2019 to 2023 estimates put the median housing year at 2000, with 7 percent of homes built before 1960. Those figures do not establish buried line age near Mesquite Street. For a replacement bore, we expose marked utilities with hydrovac before drilling near them and confirm the route against what is found.

Can groundwater or flood prone Galveston soil affect bore pits in Fulton?

Yes. The USDA soil survey maps seasonal water tables within 60 inches across 47 percent of Fulton and flood prone soils across 47 percent. Galveston and Mustang map units include occasionally flooded or frequently ponded ground. Near Fulton Beach Road, that can mean planning small pits and pumping where water or flowing sand affects excavation.

What ground does a bore pass through in Fulton’s Galveston soil?

The USDA soil survey maps Galveston soil complex across 33 percent of Fulton and fine sand across 57 percent at about 40 inches. At that depth it also maps SM and SP SM material. Fine sand cuts readily but may cave behind the drill, so staged reaming and keeping the pipe ready help manage the open hole.

How much notice does Texas811 need for a Fulton bore near Fulton Beach Road?

For a bore near Fulton Beach Road, make the Texas811 locate request at least two working days before excavation, not counting weekends or legal holidays. Do not submit more than 14 days before the planned start. If work slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed before work continues.

How far is Fulton from the Yukon office, and does Rockport change the job plan?

Fulton is 592 road miles from Trinity’s Yukon, Oklahoma main office, with a listed drive time of 11.4 hours. Rockport is only 1.8 miles south of Fulton, but that proximity does not change the distance from Yukon. Mobilization is considered alongside the actual bore route, including access and soil near Fulton Beach Road.

What affects the cost of a directional bore in Fulton under Interstate 35?

The job scope sets the cost, not the town name alone. A proposed Interstate 35 crossing can involve right of way requirements, while Fulton’s fine sand and seasonal water table affect drilling and pit work. Length, pipe size, marked utilities to expose, pavement, drainage crossings, excavator time, backfill and the 592 road miles from Yukon also factor into the estimate.

Where the Fulton facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Fulton

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Fulton, Texas

Type the address of your job in Fulton. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Fulton

All counties: Texas county list.