trinityboringsolutions.com

Lamar Texas Directional Boring: Galveston Soil, Fine Sand And Texas State Highway 35

Quick Answer: Lamar is an unincorporated community, so local streets fall to the county while Texas State Highway 35 is state controlled; we take directional boring, also called horizontal directional drilling (HDD), for crossings there. Our Yukon main office is 559 road miles away, and access along State Park Road 13 is one local routing detail. USDA soil maps show fine sand over much of Lamar, so the bore needs a plan to keep the hole open as the pipe follows the drill.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Lamar bores at a glance

  • Unincorporated community in Aransas County, Texas. Population 724 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 559 miles, about 11.4 hours of driving.
  • Ground: Galveston soil is mapped on 45 percent of the area, with fine sand about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 35. State permit office: TxDOT Corpus Christi District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can handle directional boring for Lamar along State Park Road 13?

Lamar is an unincorporated community, so local streets are under county authority rather than a city government. The Census Bureau counted 724 residents in the 2020 Census; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber lines, including service runs beneath Palmetto Street or Main Street where a trench would interrupt access.

Our main office is in Yukon, Oklahoma, and Lamar work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have done directional boring since 1982, after the family business began in 1965. Four decades of boring means our planning accounts for Lamar’s mapped fine sand, which can cave behind the drill head if the hole is left open.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What does the USDA survey show under Lamar in Galveston soil?

The USDA soil survey maps the Galveston soil series across 45 percent of Lamar, with the Galveston and Mustang complex mapped on 45 percent of the area. Surface texture is fine sand across 54 percent. At about 40 inches below the surface, fine sand is also mapped under 54 percent, while average clay content is 3 percent. These are mapped soil patterns, not test borings. For a bore along State Park Road 13, the sandy profile matters because an unsupported hole can slough in behind the bit.

USDA soil survey, inside the Lamar mapped community boundaryWhat is mapped
Soil series mappedGalveston 45 percent, Mustang 6 percent, Lydiann 3 percent, Leming 3 percent and Tatton 3 percent
Texture at the surfacefine sand 54 percent, loamy fine sand 3 percent and loamy sand 3 percent
Texture about 40 inches downfine sand 54 percent, sandy clay 3 percent and loamy sand 3 percent
Engineering class about 40 inches downsilty sand (SM) 54 percent, lean clay (CL) 3 percent and sand with silt (SP SM) 3 percent
Average clay content about 40 inches down3 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches54 percent of the area
Flood prone soils51 percent of the area
High corrosion risk for uncoated steel3 percent of the area

Bedrock is not mapped in the top five feet of Lamar, though that does not establish conditions at greater depth. The USDA survey maps a seasonal water table within 60 inches across 54 percent of the area and flood prone soils across 51 percent, so pits and wet sand need attention. High steel corrosion risk is mapped under 3 percent. The geologic map shows Cenozoic barrier island deposits, described as mostly fine grained sand; staged reaming and drilling fluid help support a bore in that material.

How do we bore Lamar’s fine sand?

Lamar’s fine sand and mapped seasonal water table call for a supported bore path and compact pits. We check the route before drilling, then keep the hole and the pipe pull aligned with the site conditions.

  1. Fine sand is mapped across 54 percent of Lamar, so we use drilling fluid and staged reaming to support the hole before pulling pipe.
  2. With seasonal water mapped within 60 inches across 54 percent of Lamar, we keep pits compact and pump out water if they fill.
  3. Before drilling near a marked line on Palmetto Street, we hydrovac pothole to expose it; paint alone does not show its depth.
  4. On State Park Road 13, we track the drill head from the surface and log depth and pitch as the bore advances.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

Which roads and drainage routes shape bores in Lamar near Texas State Highway 35?

Texas State Highway 35 runs for 2.4 mapped roadway miles inside the Lamar community boundary, and no other highway is listed within 1.5 miles outside it. State Park Road 13 is the longest named street at 3.31 miles, followed by Palmetto Street at 2.77 miles and Main Street at 2.18 miles. Those routes can put a bore under pavement or driveway access rather than through it. The road owner and the right of way determine which approval applies.

No railroad is mapped inside Lamar or within 1 mile outside the community boundary, so no mapped track crossing is indicated. No named streams or lakes are mapped nearby, and no street crossings of named streams are recorded. The map does show 0.44 miles of unnamed drainage within the community. A route near that drainage needs site review; if a planned crossing involves a creek, bayou, river or lake, federal jurisdiction is checked during planning.

Who approves a bore in Lamar and Aransas County?

For work in the Texas State Highway 35 right of way, the utility owner applies for the TxDOT utility permit through RULIS; TxDOT’s Corpus Christi District reviews it. We provide the bore plan and profile and work under the permit issued to the utility owner. Cover at a highway crossing is generally 60 inches for electric, communication, water and pressurized sewer lines, with district approval setting the final requirement. Lamar streets outside the highway right of way fall under county authority because the community has no city government. Texas811 requires notice at least 48 hours before excavation, excluding weekends and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days past the notice, a new request is needed; moved or worn marks must be refreshed before work continues.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already in the ground in Lamar and Aransas County?

The water provider for a specific Lamar address has to be confirmed with the county or local water district before a bore is planned. Public records do not match a provider to this community, so the address matters. AEP Texas Central and San Patricio Electric Cooperative report electric service in Aransas County, but the line owner for a particular route must be confirmed before an electric conduit bore. That check helps establish which marked lines the drill path has to avoid.

Line ownerWhat it isSourceSize
AEP Texas Central and San Patricio Electric CooperativeElectric utilities reporting service in Aransas CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Lamar’s median housing year at 1992; 4 percent of homes were built before 1960, and 35 percent in 2000 or later. A replacement bore along Palmetto Street may follow older buried service, while a newer Main Street connection may be an added service. We expose each marked utility by hydrovac potholing before drilling near it, since paint shows position rather than depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Do you cover Lamar from Rockport and nearby places?

Lamar is an unincorporated community in Aransas County, with Rockport 7.4 miles southwest as both the county seat and nearest larger city. The community covers 3.06 square miles, sits at an elevation of 14 feet and uses ZIP code 78382. Holiday Beach is 2.2 miles northwest, Fulton is 5.6 miles southwest, and Bayside is 13.9 miles west. From our Yukon, Oklahoma main office, the route is 559 road miles and the drive is 11.4 hours. That distance is part of planning crew mobilization for work near Goose Island State Park or Texas State Highway 35.

Places near Lamar

What boring work comes up in Lamar near Main Street?

  • Highway crossing: A bore beneath Texas State Highway 35 follows the TxDOT permit and cover plan instead of cutting through the pavement.
  • Water service: A line under State Park Road 13 can reach a property without opening a long trench across the road or driveway.
  • Fiber conduit: A route along Main Street can carry conduit beneath paved access while keeping the street surface intact.
  • Drainage crossing: A bore near Lamar’s mapped unnamed drainage needs a route and pit plan suited to wet ground and the channel.
  • Electric conduit: Before a conduit route near Palmetto Street is drilled, we confirm its line owner and expose marked utilities.
  • Park access: A service bore near Goose Island State Park can be planned around the road access and the sandy ground.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Lamar bore near State Park Road 13?

For a bore near State Park Road 13, send the address or map pin, what is going in the ground, pipe or conduit size and footage; a sketch or plans help. The route is the key local detail: tell us if the work crosses Texas State Highway 35, pavement, a driveway or the mapped unnamed drainage. That information helps define the bore plan before we price the work.

A short service run in open ground with clear access is simpler to plan than a long crossing beneath Texas State Highway 35. Price changes with bore length, pipe or conduit size, soil, utility exposures, pavement, pits and excavator time. Lamar’s fine sand may call for staged reaming, while its 559 road miles from Yukon affect mobilization. A route near the mapped drainage or a high profile or emergency job can add planning and equipment demands.

Questions people ask about boring in Lamar

Does Trinity take directional boring jobs in Lamar and Aransas County, and how are crews assigned?

We take directional boring work in Lamar, and Trinity remains your contact from the first call through the bore log. The work uses our own crews or crews working from partner contractor satellite yards that we have vetted. That arrangement serves jobs along Lamar streets such as Palmetto Street without implying a local company office.

How old are homes and buried lines near Lamar’s Palmetto Street, and what does that mean for replacement bores?

The American Community Survey 2019 to 2023 five year estimates give Lamar a median housing year of 1992. Housing age does not identify the age or location of a buried line, so we check the specific Palmetto Street route. For a replacement bore, marked utilities are exposed by hydrovac before drilling near them.

Can groundwater or flood prone ground affect bore pits in Lamar’s Galveston soil?

It can. The USDA survey maps a seasonal water table within 60 inches across 54 percent of Lamar and flood prone soils across 51 percent. Pits near Galveston soil may need pumping or a smaller footprint, and wet sand needs support so the bore stays open.

What soil will a bore pass through in Lamar’s Galveston soil at about 40 inches?

The USDA survey maps fine sand at about 40 inches below the surface across 54 percent of Lamar, and maps the Galveston soil series across 45 percent. These figures describe mapped patterns rather than a test at a property. The sandy ground can cave behind the drill, so the bore plan accounts for hole support.

Will a bore in Lamar hit rock beneath the mapped sand?

Bedrock is not mapped in the top five feet of Lamar, which does not rule out rock deeper down. The geologic map identifies Cenozoic barrier island deposits, mostly fine grained sand. A site specific route still needs assessment, particularly if the drilling conditions change as the bore advances.

Who approves a bore under Texas State Highway 35 in Lamar?

TxDOT’s Corpus Christi District reviews a utility permit for work in the Texas State Highway 35 right of way. The utility owner files through RULIS, while we prepare the bore plan and profile and work under the issued permit. Lamar’s local streets are under county authority because it is an unincorporated community.

What bore sizes and lengths can Trinity handle for a job near Lamar’s Park Road 13?

We handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The suitable setup for a Park Road 13 job depends on the route, ground and required line. A map pin and a sketch help show the crossing and access.

How much notice does Texas811 need for a bore near Lamar’s State Park Road 13, and what if marks move?

For work near State Park Road 13, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days after notice, submit a new request. Refresh worn or moved marks before work continues.

What affects the cost of directional boring near Texas State Highway 35 in Lamar?

The job scope sets the price: length, line size, soil, utility exposures, pavement, pits and excavator time all matter. A Texas State Highway 35 crossing has permit and cover requirements to plan around. Lamar’s fine sand may affect drilling steps, and mobilization from Yukon matters because the main office is 559 road miles away.

Where the Lamar facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Lamar

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Lamar, Texas

Type the address of your job in Lamar. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Lamar

All counties: Texas county list.