trinityboringsolutions.com

Teague Texas Directional Boring: Crockett Soil, US 84 and BNSF Railway

Quick Answer: For a line under BNSF Railway in Teague, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work across Texas. The Yukon, Oklahoma main office is 316 road miles away, and Teague work is staffed by our crews or vetted partner contractor crews based at satellite yards. Crockett soil is common here, while sandy clay loam appears about 40 inches down. That clay can grip a product pipe, so reaming and pullback timing matter.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Teague bores at a glance

  • Incorporated city in Freestone County, Texas. Population 3,569 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 316 miles, about 6.2 hours of driving.
  • Ground: Crockett soil is mapped on 24 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 24 percent of the area.
  • Highways inside the boundary: US 84, FM 80, Texas State Highway 179, FM 1367 and FM 1365. State permit office: TxDOT Bryan District.
  • Railroad track inside the boundary: BNSF Railway, with 11 mapped street and rail crossings.
  • Named streams inside the boundary: Caney Creek.
  • Public water: City of Teague, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near BNSF Railway in Teague?

The Yukon, Oklahoma main office is 316 road miles from Teague, and our own crews and vetted partner contractor crews handle jobs here from satellite yards. The Census Bureau Vintage 2024 estimate puts the city at 3,569 people in Freestone County. Along US 84, 3rd Avenue or a service road, we can bore in water, sewer, gas, electric conduit or fiber lines.

Our main office is in Yukon, Oklahoma, and Teague work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Trinity is a family business started in 1965, and we have done directional boring since 1982. That experience covers 3/4 inch service lines to 48 inch casing, for a small service connection or a larger crossing near BNSF Railway.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Teague’s Crockett soil create for a bore?

The USDA soil survey maps Crockett across 24 percent of Teague, with Crockett fine sandy loam, 1 to 3 percent slopes, covering 20 percent. Fine sandy loam is the surface texture across 74 percent of the city. At about 40 inches below the surface, sandy clay loam is mapped across 38 percent, clay across 34 percent and clay loam across 22 percent. Average clay content at that depth is 35 percent. In Teague, mapped soil patterns are planning references, not test borings that verify conditions along a bore path. Sticky clay can ball up on a reamer or grip the pipe, so the drilling fluid and pullback timing need attention.

USDA soil survey, inside the Teague city limitsWhat is mapped
Soil series mappedCrockett 24 percent, Silstid 19 percent, Gasil 17 percent, Edge 17 percent and Tabor 16 percent
Texture at the surfacefine sandy loam 74 percent and loamy fine sand 19 percent
Texture about 40 inches downsandy clay loam 38 percent, clay 34 percent and clay loam 22 percent
Engineering class about 40 inches downlean clay (CL) 41 percent, fat clay (CH) 35 percent and clayey sand (SC) 19 percent
Average clay content about 40 inches down35 percent
Bedrock mapped within 60 inches24 percent of the area (0 percent hard rock, 24 percent weathered rock)
Seasonal water table within 60 inches13 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel37 percent of the area

Weathered bedrock is mapped within 60 inches in 24 percent of Teague; typical bedrock depth is 53 inches, while hard bedrock is not mapped within that depth. A seasonal water table is mapped within 60 inches across 13 percent, so pits may need pumping. Flood prone soils cover 2 percent. High steel corrosion risk is mapped across 37 percent, a concern for steel casing or tracer wire that the line owner should consider. The Cenozoic clayey sand and sandy clay decomposition residuum includes clay, sand and sandstone; the Paleogene Calvert Bluff Formation is mostly mudstone with sandstone and lignite. Those changes in material can slow a bore or affect steering.

How is a bore run through Teague’s sandy clay loam?

Teague’s sandy clay loam overlies clayier ground in parts of the mapped area. We adjust the drilling fluid and reaming sequence to keep the hole stable without building excess pressure under pavement on US 84.

  1. Crockett soil and the mapped sandy clay loam can turn sticky as the hole opens, so we use a thinner fluid mix and ream in stages.
  2. Where Teague’s heavier clay is encountered, we watch fluid returns closely to avoid pressure lifting pavement along US 84.
  3. We pothole marked utilities along a 3rd Avenue route before drilling close to them, since surface paint gives position but not depth.
  4. A walkover locator tracks the drill head near BNSF Railway, and we log depth and pitch as the bore advances.
Reel of 4 inch HDPE conduit on the exit side of a 385 foot directional bore under creeks and wetland in Guthrie, Oklahoma
A reel of 4 inch HDPE conduit on the exit side of a 385 foot bore under creeks and wetland in Guthrie, Oklahoma.

Where might a Teague bore pass under US 84?

US 84 has 6.6 mapped roadway miles inside Teague, and FM 80 has 2.7. Texas State Highway 179 and FM 1367 are also within city limits. A bore beneath one of these routes can keep the pavement intact, while the route still needs to account for traffic lanes and existing utilities. Teague’s longest named streets include 3rd Avenue at 1.9 miles, Main Street at 1.79 miles and 7th Avenue at 1.5 miles. Those streets may shape a service route or a bore approach, depending on the address.

CrossingTypeMapped extentWho has a say
US 84US highway6.6 roadway miles insideState highway office
FM 80State highway2.7 roadway miles insideState highway office
Texas State Highway 179State highway1.7 roadway miles insideState highway office
FM 1367State highway1.3 roadway miles insideState highway office
FM 1365State highway1 roadway miles insideState highway office
FM 1451State highway0.2 roadway miles insideState highway office
FM 849State highway0.2 roadway miles insideState highway office
BNSF RailwayRailroad8.14 track miles insideThe railroad
Caney CreekStream0.03 channel miles insideChecked for Corps of Engineers jurisdiction
Holman CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
White Rock CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Cat CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Cash BranchStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Teague City LakeLake or pond124 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway has 8.14 track miles within Teague, and public mapping shows 11 street and rail crossings in the city. A crossing of its track needs an agreement from BNSF Railway, with the agreement governing crossing conditions. Caney Creek runs for 0.03 channel miles inside the city; no street crossings of named streams are mapped. Teague City Lake is inside city limits and covers 124 acres. A planned creek or lake crossing needs a check for U.S. Army Corps of Engineers jurisdiction.

Who approves a Teague bore in Freestone County?

Teague is an incorporated city, so its city streets belong to the city itself. For work in the right of way of US 84, FM 80, Texas State Highway 179 or another listed state route, TxDOT reviews the utility permit through its Bryan District. The utility owner, not the drilling contractor, files in TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. On Teague crossings beneath existing highway pavement, we follow TxDOT rules for boring or tunneling below. Cover requirements vary by line type, and the district can set a different depth in the permit. A bore under BNSF Railway needs an agreement from the railroad that owns the track. A Caney Creek crossing is checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near Teague’s City of Teague water system?

The City of Teague public water system uses groundwater wells and reports 1,896 service connections serving 5,688 people. That system is a useful reference when planning a water line near Main Street or US 84, but the line owner and route still need to be confirmed for the specific address. Electric utilities reporting service in Freestone County include Oncor Electric Delivery Company, Houston County Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative. We confirm the electric line owner before planning a conduit bore.

Line ownerWhat it isSourceSize
City of TeaguePublic water systemGroundwater wells1,896 connections, 5,688 people served
Oncor Electric Delivery Company, Houston County Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric CooperativeElectric utilities reporting service in Freestone CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Teague’s median housing year at 1976, context for underground planning. The estimates say 25 percent of homes were built before 1960, 60 percent from 1960 to 1999 and 15 percent in 2000 or later. That age mix can mean a Main Street replacement route differs from a new service connection. Before drilling near marked utilities, we hydrovac pothole each one on the bore path. Paint shows a line’s position, not its depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

What is near Fairfield and Teague in Freestone County?

Teague is in Freestone County, covers 5.05 square miles and sits at 516 feet elevation. Its ZIP code is 75860. Fairfield, the county seat, is 8.9 miles northeast; Kirvin is 9.9 miles north, and Mexia is 12.4 miles west. Wortham is 15.4 miles northwest, while Groesbeck is 16.2 miles southwest. Corsicana, the nearest larger city listed, is 33.1 miles north. Teague is 316 road miles and a 6.2 hour drive from the Yukon, Oklahoma main office, which affects mobilization for a job near US 84 or Caney Creek.

Places near Teague

Which jobs call for a bore near Caney Creek in Teague?

  • Highway crossing: A line under US 84 can pass beneath pavement without an open cut, with the route planned around the travel lanes.
  • Water service: A connection near the City of Teague system can be routed beneath a driveway or Main Street pavement.
  • Fiber conduit: A 3rd Avenue route can carry conduit beneath sidewalks and driveways while keeping those surfaces uncut.
  • Rail crossing: A route beneath BNSF Railway needs the railroad’s agreement and its crossing conditions built into the bore plan.
  • Creek crossing: A Caney Creek route needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
  • Lake crossing: Work near Teague City Lake needs a route plan that accounts for the water crossing and nearby ground.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send to price a Teague bore near 3rd Avenue?

For a 3rd Avenue or US 84 job, start with the address or a map pin. Tell us what is going underground, such as water or fiber, then give the pipe or conduit size and estimated footage. A sketch or plans help show the route, nearby streets and any BNSF Railway or Caney Creek crossing.

The route and scope shape the price. Teague is 316 road miles from Yukon, so mobilization matters. Crockett soil and the clay mapped below the surface affect drilling and reaming. A US 84 pavement crossing or BNSF Railway track crossing adds coordination. We also account for line exposures, concrete, creek or drainage crossings, pits, excavator time and sand backfill. High profile or emergency work can change the equipment and planning needed.

Questions people ask about boring in Teague

Does Trinity take directional boring jobs in Teague and Freestone County, and how are crews assigned?

Yes. We take directional boring work in Teague, with jobs staffed by our own crews or crews from satellite yards operated by partner drilling contractors we have vetted. Our Yukon office is 316 road miles away, and you work with Trinity from the first call through the bore log, whether our crew or a partner crew is on site.

Who runs Teague’s public water system, and where does its water come from?

The City of Teague owns its public water system, which draws its source water from groundwater wells. Public records list 1,896 service connections serving 5,688 people. For a proposed water bore near Main Street, confirm the specific line and route with its owner before setting the bore path.

Which company owns electric lines in Teague and Freestone County, and who confirms conduit specs?

The county reports service from Oncor Electric Delivery Company, Houston County Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative. That list does not identify the provider at every Teague address. Confirm the line owner and conduit specifications for the job before planning a route near US 84.

Does Teague control 7th Avenue, and can a bore avoid cutting the street?

Because Teague is incorporated, we treat its city streets as city owned when planning boring work. A directional bore can pass beneath 7th Avenue without cutting the street surface. The route still needs to account for marked lines and the entry and exit pits on either side.

Could older lines near Teague’s Main Street need replacement bores?

They could. The American Community Survey 2019 to 2023 estimates put Teague’s median housing year at 1976, with 25 percent of homes built before 1960. Housing age does not date each buried pipe, but it can be useful context when planning a replacement route near Main Street. On Teague work, we expose marked lines before drilling near them to confirm the crossing path.

Do groundwater or flood prone soils affect bore pits near Caney Creek in Teague?

They can affect pit planning. The USDA soil survey maps a seasonal water table within 60 inches across 13 percent of Teague and flood prone soils across 2 percent. Caney Creek has 0.03 channel miles inside the city. If ground is wet, pits may need pumping, and a creek route needs depth planning.

How early should I call Texas811 for a Teague bore along 3rd Avenue, and what if marks move?

Request the locate at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For Teague work, Texas811 describes the notice period as at least two working days before digging. If the start slips more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before work continues.

How far is Teague from the Yukon office, and does being near Corsicana change the job?

We plan for Teague as 316 road miles and a 6.2 hour drive from our Yukon, Oklahoma main office. Corsicana is 33.1 miles north of Teague, but the Yukon distance affects mobilization for a job here. The route, access and whether a bore crosses US 84 or BNSF Railway also shape the job plan.

What affects the price of directional boring under US 84 in Teague?

The job’s length and pipe or conduit size matter, along with Crockett soil, any pavement or concrete, marked utility exposures and the number of crossings. A US 84 highway crossing or BNSF Railway track crossing can add coordination. Distance from Yukon also affects mobilization. Pit work, creek or drainage crossings, excavator time and backfill are other factors.

Where the Teague facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Teague

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Teague, Texas

Type the address of your job in Teague. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Teague

Same county: Streetman · Oakwood. All counties: Texas county list.