Hermleigh Texas Directional Boring: Pyron Clay Loam, US 84 And BNSF Railway
Quick Answer: The USDA soil survey maps Pyron clay loam across Hermleigh, with clay loam still common at about 40 inches; the geologic map names the Ogallala Formation. We do directional boring, also called horizontal directional drilling (HDD), in Hermleigh, including crossings of US 84 without opening the pavement. The Yukon main office is 332 road miles away, and a route near BNSF Railway needs crossing planning. Hermleigh’s heavy clay can cling to the reamer, so crews manage fluid and ream in stages.
Hermleigh bores at a glance
- Unincorporated community in Scurry County, Texas. Population 383 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 332 miles, about 6.7 hours of driving.
- Ground: Pyron soil is mapped on 86 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 84, US 84 Business and FM 644. State permit office: TxDOT Abilene District.
- Railroad track inside the boundary: BNSF Railway, with 5 mapped street and rail crossings.
- Named streams inside the boundary: Big Sulpher Creek.
- Public water: Hermleigh Water System, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring near Willis Avenue in Hermleigh?
We take directional boring calls for Hermleigh, where the USDA soil survey maps Pyron clay loam through the top five feet and the geologic map names the Ogallala Formation. The 2020 Census count is 383 people; the Census Bureau does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber, including routes beneath Willis Avenue and US 84.
Our main office is in Yukon, Oklahoma, and Hermleigh work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We can handle a 3/4 inch service beneath German Street or a 48 inch casing on a bore from 10 feet to 5,000 feet. Our family business began in 1965, and we have done directional boring since 1982; that experience applies whether a Hermleigh route follows US 84 or a local street.

What kind of ground does Hermleigh have around Pyron soil?
Hermleigh is mapped mostly as Pyron soil, with Pyron series covering 86 percent of the mapped community area in the USDA soil survey. Pyron clay loam on 0 to 1 percent slopes accounts for 79 percent, and the 1 to 3 percent slopes unit accounts for 7 percent. At about 40 inches, the survey maps clay loam across 94 percent of the area and clay across 4 percent; the average clay content is 39 percent. These are mapped soil patterns, not test borings. The clay can stick to the reamer and grip pipe, so the bore plan should account for staged reaming and timely pullback.
| USDA soil survey, inside the Hermleigh mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Pyron 86 percent, Snyder 5 percent, Roscoe 4 percent and Sagerton 3 percent |
| Texture at the surface | clay loam 89 percent, loam 5 percent and clay 4 percent |
| Texture about 40 inches down | clay loam 94 percent and clay 4 percent |
| Engineering class about 40 inches down | lean clay (CL) 94 percent and fat clay (CH) 4 percent |
| Average clay content about 40 inches down | 39 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 90 percent of the area |
For Hermleigh, the USDA map places no bedrock within the top five feet, which says nothing about deeper material. Seasonal water table and flood prone soils are not mapped, but the Big Sulpher Creek route still calls for careful crossing planning. High steel corrosion risk is mapped across 90 percent of the area, so the line owner should consider casing and tracer wire materials; HDPE is not affected by soil corrosion. The geologic map names the Ogallala Formation, of Pliocene age, with sand, silt, clay, gravel and caliche. Heavy clay can hold an open hole, while changing ground within that formation may affect the drilling response.
How do crews handle Hermleigh clay loam?
We plan Hermleigh bores around the sticky Pyron clay loam, which can build on a reamer and grip pipe. Staged passes and controlled drilling fluid help manage the hole along streets such as German Street.
- In Pyron clay loam, we use a thinner drilling fluid and polymer as needed, then ream in stages so sticky soil does not load the reamer.
- Because Hermleigh’s mapped soil is heavy clay, crews watch fluid returns near pavement and manage pressure to reduce the chance of lifting a street surface.
- Before drilling near a marked utility, we hydrovac pothole it because locate paint along Willis Avenue shows position, not depth.
- On a route near Big Sulpher Creek, crews track the drill head from the surface and log depth and pitch as the bore advances.

What is in the way of a new line in Hermleigh near Big Sulpher Creek?
US 84, US 84 Business and FM 644 all run inside the mapped Hermleigh community, so a route may need to cross a state or US highway. Willis Avenue is the longest named street at 1.04 miles, followed by German Street at 0.92 miles and Harlan Avenue at 0.9 miles. Pyron Avenue adds another possible street corridor. A bore beneath existing highway pavement avoids cutting through the surface, but the highway right of way and required cover shape the alignment.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 84 | US highway | 6.2 roadway miles inside | State highway office |
| US 84 Business | US highway | 3.2 roadway miles inside | State highway office |
| FM 644 | State highway | 3.5 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 4.75 track miles inside | The railroad |
| Big Sulpher Creek | Stream | 0.38 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Clear Fork | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Sulphur Creek | Stream nearby | 1 miles outside | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 4.75 track miles inside Hermleigh, and public mapping shows 5 street and rail crossings in the community. A route under the track needs a crossing agreement with BNSF Railway. Big Sulpher Creek has 0.38 channel miles inside the boundary, with one mapped street crossing of a named stream. Clear Fork is 0.3 miles outside the boundary. No lakes or ponds are mapped within one mile, so creek and drainage details matter more than a lake crossing for a local route.
Who has to sign off on Hermleigh work in Scurry County?
Hermleigh is an unincorporated community with no city government, so street and permit authority rests with Scurry County or the state, depending on the route. For a crossing of US 84, US 84 Business or FM 644, TxDOT utility rules set 60 inches of cover below the lowest crossed grade for electric, communication and water lines, and for pressurized sewer. The utility owner files the right of way application through TxDOT’s RULIS system, and the TxDOT Abilene District reviews it; we prepare the bore plan and profile for that filing. A crossing of BNSF Railway needs its agreement. A Big Sulpher Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near Hermleigh Water System?
Hermleigh Water System is owned by local government and draws from groundwater wells; it reports 157 service connections and 471 people served. That system is a useful reference when locating a proposed water route, but the specific line path still needs review. For Scurry County, Oncor Electric Delivery Company and Big Country Electric Cooperative report electric service. We confirm which line owner serves the address before planning an electric conduit bore, rather than assuming one provider covers every Hermleigh property.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Hermleigh Water System | Public water system | Groundwater wells | 157 connections, 471 people served |
| Oncor Electric Delivery Company and Big Country Electric Cooperative | Electric utilities reporting service in Scurry County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates put Hermleigh’s median housing year at 1966; 40 percent of homes were built before 1960, 49 percent from 1960 to 1999 and 11 percent in 2000 or later. That mix can mean a project replaces older service lines or adds a new connection. Before drilling near a marked utility, we expose it by hydrovac because paint shows position, not depth. For a proposed crossing beneath Willis Avenue, that means potholing marked lines along the bore path before the drill approaches.

How far is Hermleigh from the Yukon office, and what does Snyder soil tell us?
Hermleigh is in Scurry County, Texas, at an elevation of 2,422 feet across 9.05 square miles of mapped community area. ZIP code 79526 covers the community. Snyder, the county seat and nearest larger place, is 10.6 miles northwest; Loraine is 16.2 miles south, and Colorado City is 17.8 miles south. The USDA soil survey also maps Snyder soil in Hermleigh. The Yukon, Oklahoma main office is 332 road miles away, a 6.7 hour drive, which affects mobilization planning for work near US 84 or German Street.
Places near Hermleigh
- Directional boring in Snyder: 10.6 miles northwest
- Directional boring in Loraine: 16.2 miles south
- Directional boring in Colorado City: 17.8 miles south
- Directional boring in Roscoe: 18.7 miles southeast
- Directional boring in Rotan: 22.2 miles northeast
What would we bore near German Street in Hermleigh?
- Highway crossing: A route beneath US 84 can carry a water line or conduit without cutting the existing highway pavement.
- Rail crossing: A line routed beneath BNSF Railway needs the railroad’s agreement and crossing conditions for the track corridor.
- Water service: A service route near Hermleigh Water System can connect a property while avoiding an open cut across German Street.
- Street conduit: Fiber or electric conduit beneath Willis Avenue can keep the street surface intact while marked utilities are exposed first.
- Creek crossing: A proposed line beneath Big Sulpher Creek needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for work near US 84 in Hermleigh?
To quote a Hermleigh bore, send the address or map pin, what will go in the ground, the pipe or conduit size and footage; a sketch or plans help. For a route near US 84 or Willis Avenue, show the planned crossing and work area so we can assess the line path and access.
The Hermleigh price depends on the route and scope. Ground factors include length, pipe size and Pyron clay loam, which may call for staged reaming. Crossing factors include marked utilities, pavement, BNSF Railway and Big Sulpher Creek. Logistics include pits, excavator time, sand backfill and mobilization from the Yukon office, 332 road miles away. High profile or emergency work also changes the planning and equipment needs.
Questions people ask about boring in Hermleigh
Does Trinity Boring Solutions take directional boring work in Hermleigh and Scurry County?
Yes, we take directional boring work in Hermleigh and across Texas. The Yukon main office coordinates the job, with our own crews and vetted partner contractor crews available for field work. We stay your contact from the first call through the bore log, whether the route is near Willis Avenue or US 84.
Who approves a bore under US 84 in Hermleigh, and which state office reviews it?
TxDOT reviews a US 84 right of way utility permit through its Abilene District. The utility owner submits the application in RULIS, while we prepare the bore plan and profile. TxDOT cover requirements guide the depth for the crossing, so the planned line type and route matter.
What does a Hermleigh bore under BNSF Railway need?
A bore beneath BNSF Railway in Hermleigh needs a crossing agreement from the railroad. Its terms set details such as casing, depth and flagging. With 4.75 track miles mapped inside the community, the proposed route must be checked against the track before the bore plan is finalized.
Can a line be bored under Big Sulpher Creek in Hermleigh?
A line can be planned beneath Big Sulpher Creek, subject to route and depth planning. The creek has 0.38 channel miles inside Hermleigh, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. The mapped street crossing of a named stream is another point to review.
Who runs Hermleigh Water System, and where does its water come from?
Local government owns Hermleigh Water System, which uses groundwater wells. Public records list 157 service connections and 471 people served. Those figures help identify the local system context, but the exact water line location still needs to be established for a proposed bore near the system.
Which electric providers report service in Scurry County, and who confirms a Hermleigh conduit route?
Oncor Electric Delivery Company and Big Country Electric Cooperative report electric service in Scurry County. The provider at a particular Hermleigh address is not established by that countywide listing, so we confirm the line owner before planning an electric conduit bore near German Street or another route.
How far is Hermleigh from Yukon, and does Snyder soil affect the job?
Hermleigh is 332 road miles from the Yukon main office, with a 6.7 hour drive. That distance is part of mobilization planning. Snyder soil is mapped across 5 percent of Hermleigh, while Pyron soil is the main mapped series, so the site specific soil pattern matters more than the smaller area share alone.
How much notice does Texas811 need for a Hermleigh bore near Willis Avenue?
For a bore near Willis Avenue, submit the Texas811 locate request at least 48 hours, or two working days, before excavation, excluding weekends and legal holidays. Do not submit earlier than 14 days before the start. If the start slips more than 14 days beyond the original notice, request again; have worn or moved marks refreshed before work continues.
What affects the cost of directional boring under US 84 in Hermleigh?
The route and scope set the price, including bore length, pipe size, Pyron clay loam, utility crossings, pavement and pits. A US 84 crossing or a route near BNSF Railway can add planning needs, while Big Sulpher Creek may change the crossing plan. Mobilization from the Yukon office also matters because Hermleigh is 332 road miles away.
Where the Hermleigh facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Hermleigh
- U.S. Census Bureau, TIGER/Line 2024: Hermleigh boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Hermleigh population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Hermleigh housing units and year built
- Macrostrat geologic map compilation: map units under Hermleigh
- U.S. EPA Safe Drinking Water Information System: public water systems serving Hermleigh
- U.S. Department of Transportation, North American Rail Network: track owners in Scurry County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Scurry County
- U.S. Geological Survey, Elevation Point Query Service: Hermleigh elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Hermleigh
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Hermleigh
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Hermleigh, Texas
Type the address of your job in Hermleigh. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Hermleigh
Same county: Fluvanna. All counties: Texas county list.
