trinityboringsolutions.com

Roscoe Texas Directional Boring: Pyron Clay Loam, Union Pacific Track and Idlewild Creek

Quick Answer: The City of Roscoe water system and electric providers reported for Nolan County are lines to identify before a route near Union Pacific track, and Trinity takes directional boring, also called horizontal directional drilling (HDD), work in Roscoe, Texas. Roscoe is 329 road miles from our Yukon yard, so a route along Interstate 20 needs mobilization planned into the job. Pyron soil and clay loam dominate the mapped ground, where sticky clay can build on a reamer and grip pipe. We expose marked lines before drilling near them, including a marked line on a Broadway Street route.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Roscoe bores at a glance

  • Incorporated city in Nolan County, Texas. Population 1,209 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 329 miles, about 6.6 hours of driving.
  • Ground: Pyron soil is mapped on 65 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 20, Interstate 20 Business, US 84, US 84 Business and FM 608. State permit office: TxDOT Abilene District.
  • Railroad track inside the boundary: Union Pacific and private or unidentified track, with 2 mapped street and rail crossings.
  • Public water: City of Roscoe, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Roscoe near Idlewild Creek?

Trinity Boring Solutions takes directional boring work in Roscoe, Nolan County, where the Census Bureau Vintage 2024 estimate puts the population at 1,209. The City of Roscoe water system and electric providers reported in Nolan County are existing lines to identify before we plan water, sewer, gas, electric conduit or fiber routes along Broadway Street, US 84 or other local rights of way.

Our main office is in Yukon, Oklahoma, and Roscoe work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business dates to 1965, and we have drilled directionally since 1982. That history matters around the City of Roscoe water lines and Nolan County electric infrastructure: we have had no utility strike in over 25 years, and we plan each bore around the lines already in the route.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath Roscoe and Pyron soil?

The USDA soil survey maps Pyron soil across 65 percent of Roscoe and Roscoe soil across 29 percent, with Pyron clay loam the leading mapped unit. About 40 inches below the surface, clay loam accounts for 68 percent of mapped ground and clay for 32 percent; the average clay content there is 42 percent. We use Roscoe’s mapped patterns for planning, not as substitutes for test borings. For a bore near Interstate 20, the high clay share means the hole can stay open but the cuttings may stick to the reamer and the ground can grip pipe.

USDA soil survey, inside the Roscoe city limitsWhat is mapped
Soil series mappedPyron 65 percent and Roscoe 29 percent
Texture at the surfaceclay loam 66 percent and clay 32 percent
Texture about 40 inches downclay loam 68 percent and clay 32 percent
Engineering class about 40 inches downlean clay (CL) 68 percent and fat clay (CH) 32 percent
Average clay content about 40 inches down42 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches2 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel97 percent of the area

Bedrock is not mapped within the top five feet of Roscoe, though deeper rock is still possible. A seasonal water table within 40 inches is mapped in 2 percent of the area, so a pit at a low spot may need pumping. We do not treat Roscoe’s unmapped flood prone soils as proof of clear boring conditions. High steel corrosion risk is mapped across 97 percent, a reason for the line owner to consider casing and tracer wire materials; HDPE is not subject to that steel concern. The Ogallala Formation, of Pliocene age, is mapped below the surface and includes sand, silt, clay, gravel and caliche.

What does it take to bore Roscoe clay loam?

Roscoe’s Pyron clay loam calls for controlled fluid and staged reaming, not a fast pull through sticky ground. Along Broadway Street or an Interstate 20 route, we expose marked utilities and keep returns in view.

  1. In Pyron clay loam, we use a thinner drilling fluid with polymer so sticky cuttings do not build up on the reamer along a Broadway Street route.
  2. We ream in stages through Roscoe’s heavy clay and watch fluid returns, keeping pressure controlled where Interstate 20 pavement could be lifted.
  3. With 2 percent of Roscoe mapped for a seasonal water table within 40 inches, we keep pits small and pump water if an Elm Street pit fills.
  4. We expose marked utilities along each Roscoe bore path with hydrovac, then track the drill head from the surface and log depth and pitch.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Which roads, tracks or creeks could a Roscoe bore cross near Union Pacific?

Interstate 20, Interstate 20 Business, US 84, US 84 Business and FM 608 run within Roscoe, while Loop 170 is 0.8 miles outside the limits. A route under an existing highway pavement is bored or tunneled rather than opened by trench. Broadway Street is the longest named street at 2.25 miles; Bois d’Arc Street runs 1.45 miles and Elm Street 1.28 miles. Those routes can put driveways and pavement over the bore path, so entry and exit pits need placement off the traveled surface.

CrossingTypeMapped extentWho has a say
Interstate 20Interstate8.7 roadway miles insideState highway office
Interstate 20 BusinessInterstate1.6 roadway miles insideState highway office
US 84US highway3.4 roadway miles insideState highway office
US 84 BusinessUS highway1.8 roadway miles insideState highway office
FM 608State highway1.8 roadway miles insideState highway office
Loop 170Highway nearby0.8 miles outsideState highway office
Union PacificRailroad3.55 track miles insideThe railroad
private or unidentified trackRailroad1.44 track miles insideThe railroad
Idlewild CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Rough CreekStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific track runs 3.55 miles through Roscoe, and another 1.44 miles of track is private or unidentified; the mapped rail subdivisions include the Union Pacific Toyah Subdivision. Two street and rail crossings are mapped in the city. Idlewild Creek lies 0.3 miles outside the limits and Rough Creek 0.8 miles outside, with no named stream crossings mapped on city streets. With no lakes or ponds mapped within one mile of Roscoe, we plan bore routing without a mapped waterbody constraint.

Who approves a Roscoe bore on Nolan County roads?

For an Interstate 20, US 84 or FM 608 bore within highway right of way in Roscoe, TxDOT reviews the application through its Abilene District. Electric and communication lines need 60 inches of cover at a highway crossing and 48 inches when running along the right of way; water lines need 60 inches at a crossing and 36 inches along it. Pressurized sewer needs 60 inches at a crossing. The utility owner files in TxDOT’s RULIS system, using our bore plan and profile, and the permit may set another depth. Existing highway pavement is bored or tunneled; open trenching across a road or driveway needs written district approval. Roscoe is incorporated, so city streets such as Broadway Street belong to the city. A Union Pacific crossing needs an agreement with the railroad, and a creek crossing is checked for Army Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near the City of Roscoe water system?

The City of Roscoe public water system uses groundwater wells and reports 523 service connections serving 1,238 people. Before a bore along Elm Street or another route, we confirm which water line is present. AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative, Concho Valley Electric Cooperative and Taylor Electric Cooperative report electric service in Nolan County. That county list does not identify the provider at every address, so we confirm the line owner before planning electric conduit.

Line ownerWhat it isSourceSize
City of RoscoePublic water systemGroundwater wells523 connections, 1,238 people served
AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative, Concho Valley Electric Cooperative and Taylor Electric CooperativeElectric utilities reporting service in Nolan CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Roscoe’s median housing year at 1969: 22 percent of homes were built before 1960, 75 percent from 1960 to 1999 and 3 percent in 2000 or later. That mix can mean a route is for replacing an older line or serving newer construction. On Roscoe bore paths, we hydrovac pothole each marked utility before drilling near it to confirm its location. On a Broadway Street route, a marked line is exposed to learn its depth, because paint shows position, not depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

Do you cover Roscoe and nearby Sweetwater?

Roscoe is in Nolan County, at an elevation of 2,381 feet, and covers 3.22 square miles. ZIP code 79545 serves Roscoe, helping us identify the city for underground project coordination. Sweetwater, the county seat and nearest larger city, is 7.5 miles east; Loraine is 10.8 miles west, and Hermleigh is 18.7 miles northwest. Colorado City is 19.2 miles west and Roby is 22.8 miles northeast. From our Yukon, Oklahoma yard, Roscoe is 329 road miles away and a 6.6 hour drive. That distance is part of planning crew and equipment mobilization for a bore on US 84 or Interstate 20.

Places near Roscoe

What boring work comes up around Roscoe and Elm Street?

  • Highway crossing: A bore beneath Interstate 20 keeps the line below the roadway while entry and exit pits sit beyond the pavement.
  • Water service: A connection near Elm Street can tie into the City of Roscoe system after the existing water line is located and exposed.
  • Fiber route: A conduit run along Broadway Street can pass beneath driveways and pavement without cutting the traveled surface.
  • Rail crossing: A proposed route beneath Union Pacific track needs the railroad’s agreement and a plan for the specified crossing conditions.
  • Creek crossing: A route toward Idlewild Creek needs planning for the channel and a check for U.S. Army Corps of Engineers jurisdiction.
  • Street bore: A line beneath Bois d’Arc Street can avoid an open cut across the street when the route and pit locations allow.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for directional boring in Roscoe near Interstate 20?

Start with the Roscoe address or map pin, such as a point on Elm Street or an Interstate 20 route. For Roscoe underground work, tell us what will go underground, the pipe or conduit size, and the footage. A sketch or plans help show the route, utility crossings and pit locations, especially where a proposed bore meets Union Pacific track or a paved street.

A short, clear route with known access and few exposed utilities is simpler to plan than a bore with several crossings. Price depends on length, pipe or conduit size, Pyron clay loam, utilities to expose, pavement, creek or drainage crossings, pits and excavator time. Work beneath Interstate 20 or Union Pacific track can add crossing coordination. Roscoe’s 329 road miles from Yukon also affect mobilization; emergency timing or a high profile route changes the work plan.

Questions people ask about boring in Roscoe

Does Trinity take directional boring work in Nolan County near Roscoe?

Yes, we take directional boring work in Roscoe and across Texas. The work is staffed by our own crews or crews from satellite yards operated by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, whether the crew is working near Elm Street or Interstate 20.

What ground should I expect on a Roscoe bore through Pyron soil?

The USDA soil survey maps Pyron soil and clay loam as common ground in Roscoe. At about 40 inches, clay loam covers 68 percent of mapped ground and clay 32 percent. Sticky clay can ball on the reamer and grip pipe, so staged reaming and controlled drilling fluid help manage a route near Broadway Street.

Will a Roscoe directional bore hit rock?

Bedrock is not mapped within the top five feet of Roscoe, but that does not rule out rock deeper down. The geologic map shows the Pliocene Ogallala Formation, which includes sand, silt, clay, gravel and caliche. A proposed bore near US 84 still needs its route and depth assessed before choosing tooling.

Who approves a Roscoe bore under Interstate 20?

TxDOT’s Abilene District reviews a utility permit for work in Interstate 20 right of way. The utility owner submits the application in TxDOT’s RULIS system, and we provide the bore plan and profile. The permit sets the approved conditions and may specify a depth different from the standard cover.

What does a Roscoe bore under Union Pacific track require?

A bore beneath Union Pacific track needs an agreement with the railroad that owns it. The agreement sets crossing conditions such as casing, depth and flagging. If the line also uses highway right of way near Interstate 20, TxDOT asks for a copy of that railroad agreement.

Can a line be bored beneath Idlewild Creek near Roscoe?

A bore beneath Idlewild Creek can be considered after the route and channel conditions are reviewed. The creek is 0.3 miles outside Roscoe’s limits, and creek crossings are checked during planning for U.S. Army Corps of Engineers jurisdiction. Rough Creek is also nearby, 0.8 miles outside the city.

How far is Roscoe from the Yukon office, and does Sweetwater help?

Roscoe is 329 road miles from our Yukon, Oklahoma main office, a 6.6 hour drive. Sweetwater is 7.5 miles east and is the county seat, but distance from Yukon still matters when planning equipment and crew mobilization for a route such as one under US 84.

How much 811 notice does a Roscoe bore on Broadway Street need?

Texas811 needs a locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no more than 14 days before the start. If a Broadway Street start slips more than 14 days past the original notice, make a new request. Refresh marks that wear off or move before work continues.

What affects the cost of a Roscoe bore near Interstate 20?

The job details determine the price: footage, pipe or conduit size, soil, utility exposure, pavement and pit work all matter. Pyron clay loam can affect drilling and reaming, while Interstate 20 or Union Pacific crossings call for added coordination. Roscoe’s 329 road miles from Yukon also factor into mobilization.

Where the Roscoe facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Roscoe

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Roscoe, Texas

Type the address of your job in Roscoe. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Roscoe

Same county: Blackwell. All counties: Texas county list.