trinityboringsolutions.com

Ricardo Texas Directional Boring: Palobia Soil, US 77 And Jaboncillos Creek

Quick Answer: Ricardo Water Supply Corporation runs the water system, while AEP Texas Central and Nueces Electric Cooperative report service in Kleberg County, so we confirm line owners before a bore along US 77. We do directional boring, also called horizontal directional drilling (HDD), for routes near Jaboncillos Creek. Ricardo is 618 road miles from our Yukon, Oklahoma main office, a distance that affects crew mobilization near Yokum. Palobia soil and sandy clay loam can hold the hole open but may stick to the reamer, so we plan the drilling fluid and reaming stages for the ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Ricardo bores at a glance

  • Unincorporated community in Kleberg County, Texas. Population 1,075 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 618 miles, about 12 hours of driving.
  • Ground: Palobia soil is mapped on 37 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 77, FM 1118 and FM 2619. State permit office: TxDOT Corpus Christi District.
  • Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
  • Named streams inside the boundary: Jaboncillos Creek.
  • Public water: Ricardo Water Supply Corporation, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring along US 77 in Ricardo?

We take directional boring work in Ricardo, the unincorporated community in Kleberg County. The Census Bureau counted 1,075 people here in the 2020 Census. Along US 77, FM 1118 or Yokum, we can install water, sewer, gas, electric conduit and fiber lines by bore, with the route and existing utilities checked before drilling.

Our main office is in Yukon, Oklahoma, and Ricardo work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. For routes near US 77, our size range runs from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Ricardo and Palobia soil?

The USDA soil survey maps Palobia across 37 percent of Ricardo and Gertrudis across 32 percent. The Palobia and Colmena complex covers 28 percent of the mapped area. At 40 inches, 86 percent is mapped as sandy clay loam, with an average clay content of 29 percent at that depth. Fine sandy loam is the surface texture across 86 percent. For Ricardo soil mapping, we treat mapped patterns as planning context, not test borings. The mix matters because clay can cling to the reamer even where the surface feels sandy.

USDA soil survey, inside the Ricardo mapped community boundaryWhat is mapped
Soil series mappedPalobia 37 percent, Gertrudis 32 percent, Clareville 11 percent, Premont 11 percent and Colmena 5 percent
Texture at the surfacefine sandy loam 86 percent and clay loam 11 percent
Texture about 40 inches downsandy clay loam 86 percent and clay loam 11 percent
Engineering class about 40 inches downlean clay (CL) 86 percent and fat clay (CH) 13 percent
Average clay content about 40 inches down29 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches2 percent of the area
Flood prone soils1 percent of the area
High corrosion risk for uncoated steel39 percent of the area

In Ricardo, bedrock is not mapped in the top five feet, so we do not assume deeper rock is absent. The USDA geologic map shows Holocene clay dune, a mix of silt, sand and clay. Seasonal water table is mapped within 60 inches in 2 percent of the area, and flood prone soils in 1 percent. High steel corrosion risk is mapped in 39 percent, so the line owner should consider casing and tracer wire materials. The 13 percent mapped as heavy clay may need extra attention to fluid returns.

How do we drill Ricardo’s sandy clay loam?

The USDA soil survey maps sandy clay loam at 40 inches across much of Ricardo. Near US 77, we match the fluid and reaming sequence to the ground, then track the drill head as the bore advances.

  1. Palobia ground can make clay build on the reamer, so we use a thinner fluid mix with polymer and open the hole in stages.
  2. Where sandy clay loam lies below Ricardo’s fine sandy loam surface, we prepare the pipe before the final ream and pull it through promptly.
  3. Near pavement on US 77, we manage fluid pressure and watch returns so drilling does not lift the road surface.
  4. At a Jaboncillos Creek crossing, we plan depth below the channel, track the drill head from the surface and log depth and pitch.
Reel of 4 inch HDPE conduit on the exit side of a 385 foot directional bore under creeks and wetland in Guthrie, Oklahoma
A reel of 4 inch HDPE conduit on the exit side of a 385 foot bore under creeks and wetland in Guthrie, Oklahoma.

What does a bore have to cross near Jaboncillos Creek in Ricardo?

US 77 runs through Ricardo, along with FM 1118 and FM 2619. US 77 Business is 1.2 miles outside the mapped community boundary. A bore beneath an existing highway avoids cutting the pavement, and a rural highway crossing must extend beneath all travel lanes. Yokum is the longest named street at 0.53 miles inside the community; Lonnie Lane runs 0.37 miles and Wagner Street runs 0.32 miles. Their routes need utility exposure and bore planning before the drill gets close.

CrossingTypeMapped extentWho has a say
US 77US highway4.5 roadway miles insideState highway office
FM 1118State highway1.7 roadway miles insideState highway office
FM 2619State highway0.5 roadway miles insideState highway office
US 77 BusinessHighway nearby1.2 miles outsideState highway office
Union PacificRailroad1.73 track miles insideThe railroad
Jaboncillos CreekStream3.75 channel miles insideChecked for Corps of Engineers jurisdiction
Ebanito CreekStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific owns 1.73 track miles inside Ricardo on its Brownsville Subdivision. Public records map four street and rail crossings, so a route near the tracks needs coordination with the railroad. Jaboncillos Creek runs 3.75 channel miles through the community, and four mapped street crossings cross named streams. Ebanito Creek is 0.9 miles outside the boundary. Those water routes affect bore depth and access, and creek crossings are checked for federal jurisdiction during planning.

Do I need a permit to bore in Ricardo and Kleberg County?

Ricardo is an unincorporated community, so it has no city government; local streets and permits fall to the county, while state roads are handled by the state. For work in the US 77, FM 1118 or FM 2619 right of way, the line owning utility submits the TxDOT utility permit application through RULIS. The TxDOT Corpus Christi District reviews it. We prepare the bore plan and profile for the utility owner’s filing and work under its permit. A Union Pacific track crossing needs the railroad’s agreement, and a Jaboncillos Creek route is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities are in the ground near Ricardo Water Supply Corporation lines?

Ricardo Water Supply Corporation is the local government owned public water system. It uses purchased surface water and reports 1,132 service connections serving 3,396 people. AEP Texas Central and Nueces Electric Cooperative report electric service in Kleberg County, but that does not identify the provider at every Ricardo address. Before planning an electric conduit bore along Yokum or US 77, we confirm the line owner and expose marked utilities near the route.

Line ownerWhat it isSourceSize
Ricardo Water Supply CorporationPublic water systemSurface water bought from another system1,132 connections, 3,396 people served
AEP Texas Central and Nueces Electric CooperativeElectric utilities reporting service in Kleberg CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates place Ricardo’s median housing year at 1991, useful context but not a subsurface measure. The estimates place 6 percent of housing before 1960, 69 percent from 1960 to 1999 and 25 percent in 2000 or later. That mix can mean a project is replacing an older line or adding a newer service near FM 1118. We hydrovac pothole marked water and electric lines on the bore path because surface marks show position, not depth.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

Do you cover Ricardo and nearby Kingsville?

Ricardo is in Kleberg County, at an elevation of 58 feet, and covers 4.46 square miles within its mapped community boundary. Its ZIP code is 78363. Kingsville, the county seat and nearest larger city, is 6.3 miles north. Riviera is 8.8 miles south, Bishop is 11.9 miles north, Sarita is 13.9 miles south and Premont is 17.5 miles west. Ricardo is 618 road miles and a 12.0 hour drive from our Yukon, Oklahoma main office, which is part of planning work in this area.

Places near Ricardo

What kinds of bores come up on Yokum in Ricardo?

  • Highway crossing: A route under US 77 or FM 1118 is bored beneath the pavement, with the highway right of way handled through TxDOT.
  • Water service: A connection near Ricardo Water Supply Corporation lines starts with confirming the line owner and exposing marked utilities along the route.
  • Fiber drop: A conduit bore along Yokum can avoid cutting the street while pits stay in the dirt at each end.
  • Creek crossing: A bore under Jaboncillos Creek is planned beneath the channel, with the crossing checked for federal jurisdiction.
  • Rail crossing: A route beneath Union Pacific track needs an agreement with the railroad that owns the Brownsville Subdivision.
  • Service extension: A line near Lonnie Lane can be planned around the local route, marked utilities and the sandy clay loam mapped below.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Union Pacific in Ricardo?

A map pin near US 77 or Jaboncillos Creek gives us the exact route to review, including the highway, waterway and nearby utilities. For a Ricardo bore, send us the address or pin, what goes underground, pipe or conduit size, and footage. A sketch or plans help us understand the bore path and access in Ricardo.

A route through Palobia soil may call for a different reaming plan than one near the mapped heavy clay. We also look at bore length, pipe size, utility crossings, pavement and pits. A US 77 crossing or a Union Pacific track route adds permit or railroad coordination to the scope. Jaboncillos Creek affects the crossing plan, and the 618 road miles from Yukon affect mobilization. Those site details shape the work and its price.

Questions people ask about boring in Ricardo

Does Trinity Boring Solutions take directional boring work in Ricardo, Kleberg County?

Yes. We take directional boring requests for Ricardo projects and across Texas, with the route details guiding our scope. The work is staffed with our own crews and crews from vetted partner drilling contractors, while you deal with Trinity from the first call through the bore log. For a route near US 77, we plan around the actual access and marked utilities.

Will a bore in Ricardo encounter rock below the mapped top five feet?

The soil survey does not map bedrock in Ricardo’s top five feet, but that does not rule out rock deeper down. The geologic map shows Holocene clay dune made up of silt, sand and clay. We use the site conditions to guide the bore plan, rather than treating the mapped geology as a test boring.

Who approves a bore under US 77 in Ricardo?

TxDOT reviews a US 77 right of way utility permit through the Corpus Christi District. The utility that owns the line submits the application in RULIS, and we prepare the bore plan and profile for that filing. The permit governs the route and the work beneath the highway.

What is needed to bore under Union Pacific track in Ricardo?

The track belongs to Union Pacific, which has 1.73 track miles mapped inside Ricardo. For a Ricardo railroad crossing, we need an agreement from the railroad that owns the track before planning the bore. The agreement sets requirements such as casing, depth and flagging, so the crossing plan must be coordinated with Union Pacific.

Can a line be bored under Jaboncillos Creek in Ricardo?

A bore can be planned beneath Jaboncillos Creek, which runs 3.75 channel miles through Ricardo. We plan depth to pass below the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. The ground and access at the specific crossing guide the bore plan.

Who runs Ricardo’s public water system, and where does its water come from?

Ricardo Water Supply Corporation runs the public water system, which uses purchased surface water. Its records list 1,132 service connections and 3,396 people served. We confirm the water line owner for the route before a bore near Yokum or another Ricardo street.

Does Trinity cover Kingsville and rural sites outside Ricardo?

Yes. We take work across Texas, including routes near Kingsville, 6.3 miles north of Ricardo, and rural sites beyond the mapped community boundary. Ricardo is in Kleberg County, and a project’s access, line route and distance from Yukon all factor into planning and mobilization.

How much notice does Texas811 need for a bore near Yokum in Ricardo?

For a bore near Yokum, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. We schedule Texas811 notice at least two working days ahead when planning a Ricardo bore. If the start slips more than 14 days after the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work resumes.

What affects the price of directional boring near US 77 in Ricardo?

The price depends on the route and scope, including bore length, pipe size, soil, utility crossings, pavement, pits and creek work. A US 77 crossing can require highway permitting, while Jaboncillos Creek changes the crossing plan. The distance from Yukon also affects mobilization. A map pin and project details let us assess those factors.

Where the Ricardo facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Ricardo

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Ricardo, Texas

Type the address of your job in Ricardo. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Ricardo

All counties: Texas county list.