Darrouzett Texas Directional Boring: Clay Loam, Plummer Creek, Texas Highway 15
Quick Answer: At Plummer Creek, the USDA soil survey maps clay loam across 41 percent of Darrouzett and bedrock is not mapped in the top five feet; Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for routes beneath the creek. Darrouzett is 182 road miles from our Yukon, Oklahoma main office, and Texas State Highway 15 is one local route a bore may need to pass. Clay loam can stick to a reamer, so staged reaming and fluid control matter.
Darrouzett bores at a glance
- Incorporated city in Lipscomb County, Texas. Population 295 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 182 miles, about 4.2 hours of driving.
- Ground: Darrouzett soil is mapped on 35 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Texas State Highway 15 and FM 2172. State permit office: TxDOT Amarillo District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Plummer Creek and Kiowa Creek.
- Public water: Darrouzett Municipal Water System, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Broadway Avenue in Darrouzett?
Trinity Boring Solutions takes directional boring work in Darrouzett, Lipscomb County, including routes along Broadway Avenue. The USDA soil survey maps clay loam in the top five feet, while the geologic map shows the Ogallala Formation. The Census Bureau Vintage 2024 estimate puts the town at 295 people. We install water, sewer, gas, electric conduit and fiber lines beneath Darrouzett streets such as Broadway Avenue, with the route planned for the line and site.
Our main office is in Yukon, Oklahoma, and Darrouzett work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran about 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. Alongside that reach, a Darrouzett job may be a shorter service run beneath Texas Avenue. Our family business started in 1965 and has done directional boring since 1982; we plan Darrouzett work around Texas State Highway 15 crossings.

What ground does Darrouzett soil put in the path of a bore?
The USDA soil survey maps Darrouzett silty clay loam across 35 percent of the town, with Bippus clay loam across 12 percent and Catesby Slapout loams across 17 percent. Across the mapped area, surface textures are clay loam at 41 percent, silty clay loam at 35 percent and loam at 24 percent. At about 40 inches below the surface, clay loam covers 48 percent and silty clay loam 35 percent. The survey maps CL soil across that depth. These are mapped patterns, not test borings, so the exact Texas Avenue route still needs site planning.
| USDA soil survey, inside the Darrouzett city limits | What is mapped |
|---|---|
| Soil series mapped | Darrouzett 35 percent, Bippus 20 percent, Catesby 17 percent, Spur 13 percent and Olton 8 percent |
| Texture at the surface | clay loam 41 percent, silty clay loam 35 percent and loam 24 percent |
| Texture about 40 inches down | clay loam 48 percent, silty clay loam 35 percent and loam 17 percent |
| Engineering class about 40 inches down | lean clay (CL) 100 percent |
| Average clay content about 40 inches down | 32 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 21 percent of the area |
| High corrosion risk for uncoated steel | 35 percent of the area |
Bedrock is not mapped in the top five feet of Darrouzett, though deeper material may differ. The geologic map identifies the Ogallala Formation, of Pliocene age, with sand, silt, clay, gravel and caliche; that map unit does not establish the exact material along a bore. Seasonal water table is not mapped in the top five feet, while flood prone soils cover 21 percent of the town, including ground to consider near Plummer Creek. We consider casing and tracer wire for the high steel corrosion risk mapped across 35 percent while planning Darrouzett work in Lipscomb County. Clay can cling to tooling, and the mapped corrosion risk matters when selecting steel components.
How do we run a bore through Darrouzett clay loam?
In Darrouzett, we plan for clay loam that may cling to tooling and for flood prone soil near Plummer Creek. The bore path, fluid use and pit locations depend on the exact street and ground.
- In Darrouzett silty clay loam, we manage fluid and ream in stages so sticky cuttings do not load the tool or grip the pipe.
- For a bore near Texas Avenue pavement, we control fluid pressure and watch returns so pressure does not lift the surface.
- Before a Plummer Creek route, we plan depth below the channel and locate pits where flood prone soil does not undermine the work.
- Along Kansas Avenue, we hydrovac each marked utility before drilling near it, then track the head and record depth and pitch.

Which roads or creeks might a Darrouzett bore cross near Plummer Creek?
Texas State Highway 15 runs through Darrouzett, with 1.3 mapped roadway miles inside town limits; FM 2172 adds 0.7 miles. For a bore near either road, the crossing route and pavement conditions shape the plan. Broadway Avenue is the longest named street at 0.77 miles in town, followed by Texas Avenue at 0.72 miles and Kansas Avenue at 0.61 miles. Santa Fe Avenue is another named route. Boring can leave streets and driveways uncut, with entry and exit pits placed off the paved surface where site conditions allow.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 15 | State highway | 1.3 roadway miles inside | State highway office |
| FM 2172 | State highway | 0.7 roadway miles inside | State highway office |
| Plummer Creek | Stream | 1.04 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Kiowa Creek | Stream | 0.19 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Coyote Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| White Woman Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| East White Woman Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Darrouzett or within one mile outside town limits, so the public map shows no local track route to plan around. Plummer Creek runs 1.04 channel miles within town, and Kiowa Creek runs 0.19 miles. Public mapping shows three street crossings of named streams. A crossing near Plummer Creek needs a route planned below the channel, and creek work is checked during planning for U.S. Army Corps of Engineers jurisdiction. We see no lakes or ponds mapped within one mile of Darrouzett, so we check Plummer Creek and Kiowa Creek for crossing needs.
Who approves a Darrouzett bore in Lipscomb County?
For work along Texas State Highway 15 or FM 2172 in Darrouzett, the line owner applies for a TxDOT utility permit through RULIS, and the TxDOT Amarillo District reviews it. We prepare the bore plan and profile for that owner and work under the permit issued to it. Beneath existing highway pavement, TxDOT rules call for boring or tunneling; the permit sets the required cover. Electric and communication lines need 60 inches at a crossing and 48 inches when running along the right of way. Water needs 60 inches at crossings and 36 inches along it; pressurized sewer needs 60 inches at crossings.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Darrouzett near Darrouzett Municipal Water System lines?
Darrouzett Municipal Water System uses groundwater wells and serves 301 people through 187 service connections. A water bore near that system needs the specific line owner and route confirmed before planning. Southwestern Public Service and North Plains Electric Cooperative report service in Lipscomb County, but that does not identify the provider at every Darrouzett address. Before an electric conduit bore near the water system, we confirm the line owner and hydrovac expose marked utilities on the path, since surface marks show position rather than depth.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Darrouzett Municipal Water System | Public water system | Groundwater wells | 187 connections, 301 people served |
| Southwestern Public Service and North Plains Electric Cooperative | Electric utilities reporting service in Lipscomb County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Darrouzett’s median housing year at 1968; 33 percent of homes were built before 1960, 57 percent from 1960 to 1999 and 10 percent in 2000 or later. Along Texas Avenue, a replacement bore may need to connect with older buried service, while a new service has a different route. We expose marked utilities before the drill approaches them, whether a bore is replacing pipe or extending a line.

Where is Darrouzett in relation to Follett and the Yukon yard?
Darrouzett is an incorporated town in Lipscomb County, at an elevation of 2,539 feet, with 0.51 square miles of land and ZIP code 79024. Follett lies 10.2 miles east, Booker is 12.1 miles west, and Lipscomb is 15.8 miles south. Perryton, the nearest larger city, is 26.6 miles west; Lipscomb is the county seat. Our Yukon yard is 182 road miles away, a 4.2 hour drive. That distance factors into mobilization for work on Texas State Highway 15 or town streets.
Places near Darrouzett
- Directional boring in Follett: 10.2 miles east
- Directional boring in Booker: 12.1 miles west
- Directional boring in Lipscomb: 15.8 miles south
- Directional boring in Perryton: 26.6 miles west
- Directional boring in Higgins: 27.8 miles southeast
What would we bore near Texas Avenue in Darrouzett?
- Highway crossing: A route beneath Texas State Highway 15 needs a bore plan for the pavement and the highway right of way.
- Water service: A service near Darrouzett Municipal Water System lines needs the route and line owner confirmed before we set the bore path.
- Fiber route: A conduit run along Broadway Avenue can pass beneath the street without opening a continuous trench through pavement.
- Creek crossing: A bore near Plummer Creek needs depth planned below the channel and pits placed with flood prone ground in mind.
- Electric conduit: A route near Kansas Avenue starts with confirming the electric line owner and exposing marked utilities on the bore path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Darrouzett quote near Texas State Highway 15?
Start with a map pin or address, because a bore beside Texas State Highway 15 is planned differently from one near Plummer Creek. What pipe or conduit are we placing in Darrouzett, and what size and footage? A sketch or plans help show the route, pits and nearby streets. That lets us assess the actual crossing and ground instead of estimating from a town name alone.
The Darrouzett route and ground set the price. Clay loam comes first in planning because it can cling to the reamer and affect fluid handling. A Plummer Creek crossing or Texas State Highway 15 pavement adds crossing and access details. Pipe or conduit size, bore length, marked utilities to expose, pits, excavator time, pavement and backfill also affect the scope. Mobilization matters because the Yukon yard is 182 road miles away. For high profile or emergency work near Texas State Highway 15, we allow added planning for Darrouzett project schedules.
Questions people ask about boring in Darrouzett
Does Trinity take directional boring work in Lipscomb County near Darrouzett?
Yes, we take directional boring work in Darrouzett and across Texas. Our Yukon office coordinates the job, and we use our own crews or partner contractor crews vetted by Trinity. You work with Trinity from the first call through the bore log, including work along Broadway Avenue.
Could older buried lines along Texas Avenue need replacement bores in Darrouzett?
They could. The American Community Survey 2019 to 2023 estimates put the median housing year at 1968, with 33 percent of homes built before 1960. A replacement route near Texas Avenue needs marked utilities exposed before drilling, since the age of a house does not show the exact location or depth of its buried lines.
Can Plummer Creek flood prone ground cause problems for bore pits in Darrouzett?
It can affect pit placement and the planned depth. The USDA soil survey maps flood prone soils across 21 percent of Darrouzett, and Plummer Creek runs 1.04 channel miles in town. We plan the crossing below the channel and check conditions at the actual pit locations rather than assuming every creekside lot has the same ground.
Does Darrouzett soil corrode steel, and what pipe can a bore use?
High steel corrosion risk is mapped across 35 percent of Darrouzett, so the line owner considers casing and tracer wire materials. For underground planning in Darrouzett’s clay loam, we account for HDPE being unaffected by that soil corrosion concern. The right pipe depends on what the line carries and the project design, including any crossing near Texas State Highway 15.
What soil does a bore pass through in Darrouzett soil near Texas Avenue?
The USDA soil survey maps Darrouzett silty clay loam across 35 percent of town. At about 40 inches below the surface, clay loam is mapped across 48 percent and silty clay loam across 35 percent. These are survey patterns rather than test borings, so a Texas Avenue route still needs planning for its exact ground.
Will a Darrouzett bore hit rock below the mapped soil?
Bedrock is not mapped in Darrouzett’s top five feet, which does not rule out deeper rock. The geologic map shows the Pliocene age Ogallala Formation, made up of sand, silt, clay, gravel and caliche. A bore near FM 2172 still needs to be planned for the material found along its actual path.
Can I reach Trinity after hours about an urgent bore near Kansas Avenue in Darrouzett?
Yes. A person answers Trinity’s phone at (405) 409-7423 24 hours a day, including for an urgent job near Kansas Avenue. We can discuss the route, what line is involved and whether the work needs emergency response before setting a plan.
How early should I request 811 marks for a Darrouzett bore near Broadway Avenue?
Count back at least two working days from the planned start; Texas law requires the locate request at least 48 hours ahead, excluding weekends and legal holidays. A Broadway Avenue ticket cannot be requested more than 14 days before work. If the start slips more than 14 days past the original notice, request a new ticket; have worn or moved marks refreshed through Texas811 before work continues.
What affects the cost of directional boring near Texas State Highway 15 in Darrouzett?
The route and scope decide the price, with no single factor setting it. Darrouzett clay loam, pipe size and bore length matter, as do utilities to expose, highway pavement, pits, backfill and any Plummer Creek crossing. Mobilization also reflects the 182 road miles from the Yukon yard. High profile or emergency work can change the planning needs.
Where the Darrouzett facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Darrouzett
- U.S. Census Bureau, TIGER/Line 2024: Darrouzett boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Darrouzett
- U.S. Census Bureau, American Community Survey 2019 to 2023: Darrouzett housing units and year built
- Macrostrat geologic map compilation: map units under Darrouzett
- U.S. EPA Safe Drinking Water Information System: public water systems serving Darrouzett
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Lipscomb County
- U.S. Geological Survey, Elevation Point Query Service: Darrouzett elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Darrouzett
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Darrouzett
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Darrouzett, Texas
Type the address of your job in Darrouzett. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Darrouzett
All counties: Texas county list.