Higgins Texas Directional Boring: Grandfield Fine Sandy Loam, US 60, BNSF Railway
Quick Answer: Higgins is mapped mainly as fine sandy loam near the surface, with sandy clay loam at about 40 inches and sedimentary rocks shown on the geology map. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Texas for routes such as a crossing beneath US 60 or BNSF Railway. Higgins is 155 road miles from our Yukon, Oklahoma main office, and Main Street and Commercial Street affect access planning. Grandfield soil has clay that can hold a hole open and grip a reamer, so staged reaming matters near 2nd Street.
Higgins bores at a glance
- Incorporated city in Lipscomb County, Texas. Population 341 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 155 miles, about 3.5 hours of driving.
- Ground: Grandfield soil is mapped on 72 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 60, Texas State Highway 213 and FM 1453. State permit office: TxDOT Amarillo District.
- Railroad track inside the boundary: BNSF Railway, with 2 mapped street and rail crossings.
- Public water: Higgins Municipal Water System, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near US 60 in Higgins?
Trinity Boring Solutions takes directional boring work in Higgins, Lipscomb County, including routes near US 60. The top five feet are mapped mainly as fine sandy loam, with sandy clay loam around 40 inches down; the geology map also lists sedimentary rocks. Higgins has a population of 341 in the Census Bureau Vintage 2024 estimate. We bore water, sewer, gas, electric conduit and fiber beneath local streets such as Main Street, avoiding an open cut where the route allows.
Our main office is in Yukon, Oklahoma, and Higgins work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught our family business to adjust reaming and fluid to mapped ground such as Grandfield soil. The business began in 1965, and Trinity stays involved from the first call through the bore log, including work staffed from a partner yard.

What ground should a Higgins bore expect in Grandfield soil?
The USDA soil survey maps Higgins mostly as Grandfield fine sandy loam, a surface texture that covers 72 percent of the mapped area inside the city limits. Around 40 inches below the surface, sandy clay loam is mapped under 72 percent of the area. The survey reports an average clay content of 21 percent at that depth, while sandy ground is mapped under 16 percent. These are mapped patterns, not test borings, so the specific route still needs to guide the bore plan.
| USDA soil survey, inside the Higgins city limits | What is mapped |
|---|---|
| Soil series mapped | Grandfield 72 percent, Springer 15 percent and Slapout 12 percent |
| Texture at the surface | fine sandy loam 72 percent, loamy fine sand 16 percent and loam 12 percent |
| Texture about 40 inches down | sandy clay loam 72 percent, fine sandy loam 15 percent and very gravelly fine sandy loam 12 percent |
| Engineering class about 40 inches down | lean clay (CL) 72 percent, silty clayey sand (SC SM) 16 percent and silty clayey gravel (GC GM) 12 percent |
| Average clay content about 40 inches down | 21 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
Bedrock is not mapped in the top five feet of Higgins, though the geology map lists Holocene sand sheet deposits and Paleocene sedimentary rocks. That map does not rule out deeper rock. Seasonal water table soils, flood prone soils and high steel corrosion risk are not mapped in the city. The Grandfield clay can help keep a hole open but may stick to a reamer, while the sand sheet calls for care against hole collapse. We plan the fluid and reaming around the actual route.
How do crews handle Higgins sandy clay loam?
In Higgins, sandy clay loam mapped around 40 inches calls for controlled fluid and staged reaming. We track the drill head as it advances, with Main Street crossings planned to keep the surface intact.
- Grandfield fine sandy loam covers 72 percent of Higgins, so we stage the reaming and keep the pipe ready to reduce the time an open hole can collapse.
- Sandy clay loam is mapped around 40 inches under 72 percent of the area; controlled fluid helps limit clay buildup on the reamer.
- The mapped sand sheet has moderate to very high permeability, so we watch fluid returns along streets such as Main Street and avoid excess pressure beneath pavement.
- We locate and hydrovac expose marked lines before drilling near them, then track depth and pitch along the bore route near the Higgins Municipal Water System.

What is in the way of a new line in Higgins near Main Street?
Higgins has US 60, Texas State Highway 213 and FM 1453 inside its limits, with no additional mapped highways within 1.5 miles outside the city. Main Street is the longest named street at 1.33 miles, followed by Commercial Street at 1.04 miles and 2nd Street at 0.98 miles. A bore route under one of these roads needs enough room for entry and exit pits. Where a state highway is involved, the TxDOT permit and the highway crossing requirements shape the plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 60 | US highway | 1 roadway miles inside | State highway office |
| Texas State Highway 213 | State highway | 1.2 roadway miles inside | State highway office |
| FM 1453 | State highway | 0.5 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 0.97 track miles inside | The railroad |
BNSF Railway has 0.97 track miles inside Higgins, and the mapped street and rail crossing count is 2. A route crossing those tracks needs a crossing agreement with BNSF Railway, which sets the applicable crossing conditions. No named streams, lakes or ponds are mapped in or within one mile of the city, and no street crossings of named streams are mapped. That leaves street, highway and rail interfaces as the mapped crossing issues for a Higgins bore.
Do I need a permit for a Higgins bore under BNSF Railway?
US 60, Texas State Highway 213 and FM 1453 are TxDOT routes, so work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Amarillo District. The utility owner submits the application through RULIS; we prepare the bore plan and profile for that filing and work under the owner’s permit. TxDOT requires boring or tunneling beneath existing highway pavement, with rural highway crossings extending beneath all travel lanes. Higgins streets such as Main Street belong to the city. A crossing of BNSF Railway also needs the railroad’s agreement. No local stream crossing is mapped.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are already in the ground in Higgins, Lipscomb County?
Higgins Municipal Water System uses groundwater wells and serves 325 people through 232 service connections. For a water service near Main Street, that system is a useful starting point for identifying existing lines before the bore is laid out. Southwestern Public Service and North Plains Electric Cooperative report electric service in Lipscomb County. Those county records do not identify the electric provider at every address, so we confirm the line owner before planning a conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Higgins Municipal Water System | Public water system | Groundwater wells | 232 connections, 325 people served |
| Southwestern Public Service and North Plains Electric Cooperative | Electric utilities reporting service in Lipscomb County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Higgins’s median housing year at 1973; 31 percent of homes were built before 1960, 58 percent from 1960 to 1999 and 11 percent in 2000 or later. On older routes near 2nd Street, a replacement bore may need to avoid buried service lines, while newer construction can call for a new connection. We hydrovac pothole marked utilities on the route before drilling near them; Texas811 paint shows position, not depth. Potholing near the water system and electric lines helps establish actual clearance.

What is near Higgins, Texas, including Glazier?
Higgins is in Lipscomb County, covers 1.11 square miles and sits at an elevation of 2,548 feet. ZIP code 79046 covers the city. Glazier is 15.5 miles southwest, and Lipscomb, the county seat, is 14.8 miles northwest; Follett is 22.5 miles north. The Higgins-Lipscomb County Airport is a local landmark. From our Yukon, Oklahoma main office, the drive to Higgins is 155 road miles and 3.5 hours, which is part of planning mobilization for work on Main Street or US 60.
Places near Higgins
- Directional boring in Lipscomb: 14.8 miles northwest
- Directional boring in Glazier: 15.5 miles southwest
- Directional boring in Follett: 22.5 miles north
- Directional boring in Canadian: 24.7 miles southwest
- Directional boring in Darrouzett: 27.8 miles northwest
What boring work comes up in Higgins near Commercial Street?
- Highway crossing: A bore beneath US 60 needs a route that extends beneath the travel lanes and keeps existing pavement uncut.
- Water service: A connection near the Higgins Municipal Water System needs potholes to establish clearance from existing groundwater well lines.
- Fiber route: A line beneath Main Street can avoid an open cut, with entry and exit pits placed off the traveled surface.
- Rail crossing: A route beneath the BNSF Railway track needs the railroad agreement to set crossing conditions for the bore.
- Street replacement: A sewer or water line beneath Commercial Street can replace an older buried line without cutting the roadway.
- Electric conduit: Before a conduit bore near 5th Street, we confirm the line owner and expose marked utilities along the path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Higgins bore near 5th Street?
For a Higgins quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. The route near 5th Street matters because access for pits and the nearby marked utilities can change the layout. A map pin also lets us check whether the work approaches US 60 or BNSF Railway.
The price follows the specific Higgins job. The 155 road miles from Yukon affect mobilization, while Grandfield soil and its clay content affect drilling and reaming. A route near US 60 or BNSF Railway may add crossing requirements and planning. Pipe size, bore length, utilities to expose, pavement, pit and excavator needs, backfill and emergency timing can also change the scope. Details around 5th Street help us understand access and what the bore will cross.
Questions people ask about boring in Higgins
Does Trinity Boring Solutions take jobs in Higgins, Lipscomb County, and how are crews assigned?
Yes, Trinity Boring Solutions takes directional boring work in Higgins, Lipscomb County. Work is handled by our own crews or from satellite yards operated by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, even when a partner yard crew is on site near US 60.
Who owns electric lines in Higgins, Lipscomb County, and who confirms conduit specs?
Southwestern Public Service and North Plains Electric Cooperative report electric service in Lipscomb County, but those records do not name the provider for every Higgins address. We confirm the specific line owner before a conduit bore, then coordinate the conduit requirements with that owner. This check matters for a route near Main Street or the Higgins Municipal Water System.
Who is responsible for Higgins streets such as 2nd Street, and can a bore avoid cutting them?
Higgins is an incorporated city, so its city streets, including 2nd Street, belong to the city. Directional boring can pass beneath a street without cutting the pavement when the route and access allow. The mapped street length is 0.98 miles, and the bore plan must account for pits and existing utilities.
Could older buried lines near Commercial Street need replacement bores in Higgins?
Yes, older lines near Commercial Street may be candidates for replacement bores, but the route needs to be checked. The American Community Survey 2019 to 2023 estimates say 31 percent of Higgins homes were built before 1960 and the median housing year is 1973. We pothole marked utilities before drilling near existing services.
What does Grandfield soil mean for a directional bore in Higgins?
Grandfield fine sandy loam is mapped across 72 percent of Higgins, and sandy clay loam is mapped under 72 percent around 40 inches deep. The clay can keep the bore open but may cling to the reamer. We use staged reaming and control fluid for a route such as one beneath Main Street.
Will a directional bore in Higgins hit rock?
Bedrock is not mapped in the top five feet of Higgins, but that does not establish conditions deeper down. The geology map lists Holocene sand sheet deposits and Paleocene sedimentary rocks. A route near US 60 still needs planning based on its location and bore information rather than assuming the whole alignment has the same ground.
How far is Higgins from Trinity’s Yukon main office, and does that affect a job?
Higgins is 155 road miles and a 3.5 hour drive from our Yukon, Oklahoma main office. That distance affects mobilization planning for a bore near Commercial Street or BNSF Railway. The job’s route, equipment needs and access also affect how the work is staffed and scheduled.
How much Texas811 notice do I need for a Higgins bore near Main Street?
For a Higgins bore near Main Street, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. Texas811 describes that as at least two working days. If the start moves more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before work continues.
What affects the cost of directional boring in Higgins under US 60?
The Higgins job scope sets the price, including a possible US 60 crossing. The 155 road miles from Yukon affect mobilization; Grandfield soil, bore length and pipe size affect drilling; and marked utilities, pavement, pits, backfill or excavator time can add work. A BNSF Railway crossing or emergency timing can also change the plan.
Where the Higgins facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Higgins
- U.S. Census Bureau, TIGER/Line 2024: Higgins boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Higgins
- U.S. Census Bureau, American Community Survey 2019 to 2023: Higgins housing units and year built
- Macrostrat geologic map compilation: map units under Higgins
- U.S. EPA Safe Drinking Water Information System: public water systems serving Higgins
- U.S. Department of Transportation, North American Rail Network: track owners in Lipscomb County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Lipscomb County
- U.S. Geological Survey, Elevation Point Query Service: Higgins elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Higgins
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Higgins
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Higgins, Texas
Type the address of your job in Higgins. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Higgins
Same county: Booker. All counties: Texas county list.
