Allison Texas Directional Boring: Grandfield Loamy Sand, FM 1046 and Hackberry Creek

Quick Answer: On FM 1046, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Allison, Texas, for utility routes beneath the roadway. Allison is 165 road miles from the Yukon, Oklahoma main office, and FM 277 also runs inside the mapped community boundary. The USDA soil survey maps mostly loamy sand at the surface, with sandy clay loam leading at about 40 inches, where the ground can hold a bore more firmly. The geologic map shows Holocene sand sheet deposits and Paleocene Cenozoic sedimentary rocks.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Allison bores at a glance

  • Unincorporated community in Wheeler County, Texas. Population 125 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 165 miles, about 3.3 hours of driving.
  • Ground: Grandfield soil is mapped on 91 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 1046 and FM 277. State permit office: TxDOT Childress District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Hackberry Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near FM 1046 in Allison?

Trinity Boring Solutions takes directional boring work in Allison, Wheeler County, including routes beneath FM 1046 and County Line Road. The Census Bureau counted 125 people in Allison in the 2020 Census. We install water, sewer, gas, electric conduit and fiber where routes need to pass beneath local streets or the two state highways. That gives a project a trenchless option across the community’s 17.03 public road centerline miles.

Our main office is in Yukon, Oklahoma, and Allison work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, with directional boring work dating to 1982. That experience covers service lines from 3/4 inch through 48 inch casing, including routes beneath Wheeler Avenue.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is Grandfield soil like to bore in Allison?

The USDA soil survey maps Grandfield soils across 91 percent of Allison, with loamy sand as the surface texture across 70 percent of the mapped area. At about 40 inches below the surface, sandy clay loam is the leading texture, mapped across 77 percent, and average clay content is 20 percent. These are mapped soil patterns, not test borings, so a specific route near County Line Road can differ. The loose surface sand can cave behind the drill head, while the deeper, finer soil may hold the hole more firmly.

USDA soil survey, inside the Allison mapped community boundaryWhat is mapped
Soil series mappedGrandfield 91 percent and Devol 7 percent
Texture at the surfaceloamy sand 70 percent, loamy fine sand 19 percent and fine sandy loam 12 percent
Texture about 40 inches downsandy clay loam 77 percent, fine sandy loam 17 percent and loamy fine sand 7 percent
Engineering class about 40 inches downclayey sand (SC) 68 percent, silty clayey sand (SC SM) 18 percent and lean clay (CL) 10 percent
Average clay content about 40 inches down20 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

Bedrock is not mapped in the top five feet of Allison, which does not rule out rock deeper down. The USDA soil survey does not map seasonal water table conditions, flood prone soils or high steel corrosion risk here. The geologic map shows Holocene sand sheet deposits and Paleocene Cenozoic sedimentary rocks; it gives no thickness for the sand deposits. The loose mapped sand can need fluid support to keep a bore open, while the deeper sedimentary unit is not proof of rock at a planned bore depth.

What does it take to bore Allison’s sandy clay loam?

We bore Allison’s sandy clay loam and loamy sand with staged reaming and fluid choices matched to the mapped Grandfield ground, then track the head beneath local routes such as FM 1046.

  1. Where Grandfield loamy sand is mapped at the surface, we use staged reaming and fluid support to help keep the Allison bore open behind the bit.
  2. At about 40 inches, sandy clay loam is the leading mapped texture in Allison, so we adjust the drilling fluid and reaming plan to the route conditions.
  3. Before a bore near Santa Fe Road reaches a marked utility, we hydrovac expose it because the paint shows position, not depth.
  4. As a bore advances beneath FM 277, a walkover locator tracks the drill head from the surface and the crew logs depth and pitch.
Walkover locator at the edge of the wetland on a directional bore at the Cimarron site in Logan County, Oklahoma
Walkover locator at the edge of a wetland on a directional bore in Logan County, Oklahoma.

Which roads, tracks or creeks could a bore cross in Allison near County Line Road?

FM 1046 has 1.6 mapped roadway miles inside Allison, and FM 277 has 1.1, so a route beneath either highway needs to be planned for its state right of way. County Line Road is the longest named street at 3.96 miles in the community. Wheeler Avenue measures 0.98 miles, and Santa Fe Road measures 0.39 miles. A bore can pass beneath these roads without cutting the pavement, with entry and exit pits placed off the travel surface where the site allows.

CrossingTypeMapped extentWho has a say
FM 1046State highway1.6 roadway miles insideState highway office
FM 277State highway1.1 roadway miles insideState highway office
Hackberry CreekStream0.68 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Allison or within 1 mile outside the mapped community boundary, and no street and rail crossings are mapped. Hackberry Creek runs 0.68 channel miles through Allison, with two mapped street crossings of named streams. A bore planned near the creek needs a route and depth suited to that channel crossing. No lakes or ponds are mapped within 1 mile of the community.

Do I need a permit to bore in Allison, Wheeler County?

Allison has no city government, so a street bore is handled by Wheeler County or the state, depending on the road. For work in the FM 1046 or FM 277 right of way, TxDOT requires a utility permit, reviewed by its Childress District. The utility owner files through TxDOT’s RULIS system, while we prepare the bore plan and profile for that application. For electric or communication lines crossing a state highway, the cover requirement is 60 inches below the lowest crossed grade; water crossings also need 60 inches, and pressurized sewer crossings need 60 inches. A Hackberry Creek crossing is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the utility lines serving Allison in Wheeler County?

Before planning a water bore off Santa Fe Road, confirm the provider for that Allison address with Wheeler County or the local water district; EPA drinking water records do not match a system to this community. Southwestern Electric Power, Southwestern Public Service, Greenbelt Electric Cooperative and North Plains Electric Cooperative report electric service in Wheeler County, but the owner at the bore location must be identified before setting conduit specifications. We can hydrovac expose marked lines along a proposed route before drilling near them.

Line ownerWhat it isSourceSize
Southwestern Electric Power, Southwestern Public Service, Greenbelt Electric Cooperative and North Plains Electric CooperativeElectric utilities reporting service in Wheeler CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Allison’s median housing year at 1953, with 92 percent built before 1960 and 8 percent from 1960 to 1999; no share is shown for 2000 or later. That age can make a replacement bore along Wheeler Avenue worth considering, but it does not identify pipe material or location. We expose marked utilities on the planned path before drilling near them because surface marks show position, not depth.

Mini excavator digging beside a pad mounted electrical transformer with red dirt spoil and a vacuum excavation trailer on site
Digging beside a pad mounted electric transformer with a vacuum excavation trailer on site.

How far is Allison from Mobeetie and the Yukon yard?

Allison is an unincorporated Wheeler County community at 2,589 feet, covering 2.04 square miles in ZIP code 79003. Mobeetie is 19.3 miles west, and Wheeler, the county seat, is 15.0 miles southwest. Canadian lies 25.6 miles northwest, while Shamrock is 28.4 miles south. The Yukon, Oklahoma main office is 165 road miles away, a 3.3 hour drive. That distance is part of mobilization planning for work on FM 1046 or near Hackberry Creek.

Places near Allison

What would we bore near Wheeler Avenue in Allison?

  • Highway crossing: A bore beneath FM 1046 keeps the route below the travel lanes and requires planning for the state right of way.
  • Water service: A service bore near Wheeler Avenue needs the address specific water provider confirmed before its route is set.
  • Fiber route: A fiber conduit bore along County Line Road can pass beneath the roadway without an open cut through its surface.
  • Creek crossing: A route beneath Hackberry Creek needs channel depth planning and a check for Corps jurisdiction during planning.
  • Street replacement: A replacement bore near Santa Fe Road can carry a new line beneath the street while avoiding a pavement cut.
  • Drainage crossing: A bore near mapped unnamed drainage can be planned around the 2.67 drainage miles inside Allison.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for an Allison bore near Hackberry Creek?

For a bore near Hackberry Creek, send the exact map pin or street address so we can see the proposed route in relation to the channel and nearby access. Tell us what will go underground, the pipe or conduit size and the footage. A sketch or plans help us check the path against roads such as FM 1046 and the creek crossing.

A route through Grandfield loamy sand may need different reaming and fluid control than one reaching the sandy clay loam mapped at about 40 inches. Crossings also shape the work: FM 1046 needs a state right of way plan, and Hackberry Creek adds a channel crossing to assess. The estimate accounts for bore length, pipe size, soil, utilities to expose, pavement, pits, backfill and equipment time. Mobilization from Yukon matters for Allison’s 165 road miles from the main office.

Questions people ask about boring in Allison

Does Trinity take boring jobs in Allison, Wheeler County, and who staffs them?

Yes. Trinity Boring Solutions takes directional boring work in Allison, Wheeler County, and coordinates the job from the first call through the bore log. Our work there uses our own crews or crews from partner drilling contractors we have vetted. The crew arrangement does not change who you work with for a bore beneath FM 1046.

Who owns Allison, Wheeler County electric lines, and who confirms conduit specs?

Several utilities report electric service in Wheeler County: Southwestern Electric Power, Southwestern Public Service, Greenbelt Electric Cooperative and North Plains Electric Cooperative. That does not identify the owner at every Allison address. Confirm the line owner and conduit specifications for the actual bore route before planning work near County Line Road.

Does Wheeler County or a city control Allison streets like Santa Fe Road, and must we cut one?

Allison is unincorporated and has no city government, so Wheeler County or the state handles street and road matters. A bore beneath Santa Fe Road can avoid cutting its pavement, with entry and exit pits set in the dirt where the site allows. FM 1046 and FM 277 are state highways.

Do older homes near Wheeler Avenue mean replacement bores in Allison?

They can be a reason to consider replacement work, but housing age does not show the buried line’s material or exact route. The American Community Survey 2019 to 2023 estimates put the median housing year at 1953, with 92 percent built before 1960. A bore near Wheeler Avenue still needs route planning and utility exposure.

What ground does a Grandfield soil bore in Allison pass through?

The USDA soil survey maps Grandfield soils across 91 percent of Allison. Loamy sand is the main surface texture, while sandy clay loam leads at about 40 inches, mapped across 77 percent. Those are soil survey patterns rather than test borings; loose surface sand can cave, so the route may need staged reaming and fluid support.

Will a bore in Allison hit rock?

The soil survey does not map bedrock in Allison’s top five feet, but that does not rule out deeper rock. The geologic map identifies Holocene sand sheet deposits and Paleocene Cenozoic sedimentary rocks. A bore near FM 277 still needs site specific planning because the map does not establish the material at every planned depth.

How much 811 notice does an Allison bore near County Line Road need, and what if marks change?

For work near County Line Road, submit a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the original notice, request a new ticket. Have worn or moved marks refreshed through Texas811 before work continues.

How far is Allison from the Yukon office, and does that affect a bore?

Allison is 165 road miles and a 3.3 hour drive from the Yukon, Oklahoma main office. That distance can affect mobilization for work near Hackberry Creek or along FM 1046. The route, equipment needs and job scope also matter when planning the crew and schedule.

What affects the price of an Allison bore near FM 1046?

The price reflects the work required, not just the footage. Grandfield loamy sand and the deeper sandy clay loam affect drilling and reaming; FM 1046 can involve state right of way work. Utilities to expose, pavement, pits, creek or drainage crossings, equipment time, emergency scope and mobilization from Yukon also shape the estimate.

Where the Allison facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Allison

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Allison, Texas

Type the address of your job in Allison. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Allison

All counties: Texas county list.