Appleby Texas Directional Boring: Nacogdoches Soil, US 59 and Byu La Nana
Quick Answer: Along Appleby’s US 59 corridor, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for lines that need to pass beneath pavement. The 391 road miles from our Yukon, Oklahoma main office shape mobilization for a bore near Burt Drive; staffing comes from our crews or vetted partner contractor yards. The USDA soil survey maps Nacogdoches soil across much of Appleby, with clay common at depth. That sticky ground can grip pipe, so staged reaming and careful fluid control matter on a Happy Land Road route. A crossing near Byu la Nana also calls for planning around the channel.
Appleby bores at a glance
- Incorporated city in Nacogdoches County, Texas. Population 554 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 391 miles, about 7.7 hours of driving.
- Ground: Nacogdoches soil is mapped on 56 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 2 percent of the area.
- Highways inside the boundary: US 59, FM 941 and FM 2609. State permit office: TxDOT Lufkin District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Named streams inside the boundary: Byu la Nana.
- Public water: Appleby Water Supply Corporation, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Appleby, Nacogdoches County?
Trinity Boring Solutions takes directional boring jobs in Appleby, Nacogdoches County, where the Census Bureau Vintage 2024 estimate puts the population at 554. Appleby is 391 road miles from our Yukon, Oklahoma main office. Along Stoddard Road or beneath US 59, we can bore water, sewer, gas, electric conduit and fiber routes without cutting the surface across the planned path.
Our main office is in Yukon, Oklahoma, and Appleby work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982; that experience fits work ranging from 3/4 inch service lines to 48 inch casing beneath US 59. Bore lengths can run from 10 feet to 5,000 feet, with Burt Drive access helping define the setup.

What ground does a bore meet in Appleby near Nacogdoches soil?
Appleby’s Nacogdoches soil and clay at depth call for a bore plan that keeps the hole stable without overworking the ground. The USDA soil survey maps Nacogdoches soil across 56 percent of the city and Alto soil across 27 percent. At about 40 inches below the surface, clay is mapped across 61 percent of the area and clay loam across 31 percent; sandy clay accounts for 8 percent. The survey maps an average clay content of 43 percent at that depth. These are mapped soil patterns, not test borings, so the exact route still matters.
| USDA soil survey, inside the Appleby city limits | What is mapped |
|---|---|
| Soil series mapped | Nacogdoches 56 percent, Alto 27 percent, Sacul 8 percent and Tuscosso 3 percent |
| Texture at the surface | clay loam 37 percent, gravelly fine sandy loam 28 percent and fine sandy loam 26 percent |
| Texture about 40 inches down | clay 61 percent, clay loam 31 percent and sandy clay 8 percent |
| Engineering class about 40 inches down | fat clay (CH) 69 percent and lean clay (CL) 31 percent |
| Average clay content about 40 inches down | 43 percent |
| Bedrock mapped within 60 inches | 2 percent of the area (0 percent hard rock, 2 percent weathered rock) |
| Seasonal water table within 60 inches | 41 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 99 percent of the area |
The USDA soil survey maps weathered bedrock within 60 inches across 2 percent of Appleby, and none within 40 inches; that does not rule out rock deeper down. A seasonal water table is mapped within 60 inches across 41 percent, so Stoddard Road pits may need pumping and room for water. Flood prone soils cover 3 percent. High steel corrosion risk is mapped across 99 percent, a concern for uncoated casing and tracer wire; the line owner selects coatings, while HDPE avoids that steel concern. The Eocene Reklaw Formation is mapped as sandstone and claystone, so a route can meet firmer material below the soil.
How do we bore Appleby clay without disturbing the route?
We bore Appleby clay with staged reaming and controlled drilling fluid, because the USDA soil survey maps heavy clay at depth and seasonal water conditions in the city.
- On a Nacogdoches soil route, we use a thinner drilling fluid and polymer to limit sticky clay buildup on the reamer, then enlarge the hole in stages.
- Where Appleby’s heavy clay lies beneath pavement, we watch fluid returns and pressure so drilling fluid does not lift the surface.
- With seasonal water table mapped near Stoddard Road, we plan compact pits and pumping so standing water does not stall the bore.
- Before drilling near a marked line on Burt Drive, we hydrovac pothole to expose it; a locator tracks the head and records depth and pitch.

What can a bore cross in Appleby near Byu la Nana?
A bore in Appleby can pass beneath US 59, FM 941 or FM 2609, depending on the route and right of way. Mapped roadway lengths inside the city are 3.9 miles for US 59, 2.0 miles for FM 941 and 1.3 miles for FM 2609. Burt Drive is the longest named street at 1.7 miles, followed by Happy Land Road at 1.11 miles and Stoddard Road at 1.06 miles. These roads give a route plan specific places to check for pavement, driveways and buried lines.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 59 | US highway | 3.9 roadway miles inside | State highway office |
| FM 941 | State highway | 2 roadway miles inside | State highway office |
| FM 2609 | State highway | 1.3 roadway miles inside | State highway office |
| Union Pacific | Railroad | 2.4 track miles inside | The railroad |
| Byu la Nana | Stream | 0.51 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Crawford Green | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Byu Carrizo | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
| Crawford Creek | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
| Lake Naconiche | Lake or pond | 757 acres, nearby | Checked for Corps of Engineers jurisdiction |
Union Pacific track runs 2.4 miles through Appleby on the Lufkin Subdivision, and public mapping shows 2 street and rail crossings in the city. Byu la Nana has 0.51 channel miles inside Appleby, with 2 mapped street crossings of named streams. Lake Naconiche, a 757 acre lake, is within one mile but outside city limits. A creek route needs channel planning, and water crossings are checked for possible U.S. Army Corps of Engineers jurisdiction.
Who approves a bore in Appleby under US 59?
For a bore in Appleby’s US 59 or FM road right of way, TxDOT reviews the utility permit through its Lufkin District. At a highway crossing, electric and communication lines need 60 inches of cover below the lowest crossed grade, water needs 60 inches, and pressurized sewer needs 60 inches; the permit may set another depth. The utility owner files in TxDOT’s online RULIS system, and we prepare the bore plan and profile for that application. Appleby controls its city streets. A Union Pacific track crossing needs the railroad’s agreement, and a Byu la Nana crossing is checked for federal water jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines near Appleby Water Supply Corporation?
Appleby Water Supply Corporation operates a groundwater well system reporting 1,915 service connections and a population served of 5,745. For an electric conduit route near Burt Drive, the line owner has to be confirmed before planning. Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association, Deep East Texas Electric Cooperative and Rusk County Electric Cooperative report electric service in Nacogdoches County; that countywide list does not identify the provider at every Appleby address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Appleby Water Supply Corporation | Public water system | Groundwater wells | 1,915 connections, 5,745 people served |
| Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association, Deep East Texas Electric Cooperative and Rusk County Electric Cooperative | Electric utilities reporting service in Nacogdoches County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Appleby’s median housing year at 1992; 10 percent of homes were built before 1960, 58 percent from 1960 to 1999 and 32 percent in 2000 or later. A bore along Happy Land Road could serve a new connection or replace an older line, but the street’s age pattern does not show what is buried at one address. We expose marked utilities with hydrovac potholing before drilling near them; paint shows position, not depth.

How far is Appleby from Redfield and our Yukon yard?
Appleby is in Nacogdoches County, at an elevation of 418 feet, and covers 2.15 square miles. For Appleby addresses in ZIP codes 75965 and 75946, we confirm the service location before planning a boring route. Redfield is 4.2 miles southwest, while Nacogdoches is 7.7 miles south and serves as the county seat and nearest larger city. Garrison is 10.1 miles northeast. The Yukon, Oklahoma main office is 391 road miles away, a 7.7 hour drive. Those distances matter when planning equipment and crew mobilization for a bore near US 59.
Places near Appleby
- Directional boring in Redfield: 4.2 miles southwest
- Directional boring in Nacogdoches: 7.7 miles south
- Directional boring in Garrison: 10.1 miles northeast
- Directional boring in Mount Enterprise: 14.1 miles north
- Directional boring in Cushing: 15.2 miles northwest
What boring work comes up on Appleby’s Burt Drive?
- Highway crossing: A line beneath US 59 can be installed by boring or tunneling, with the bore planned to clear the travel lanes.
- Water service: A connection near Appleby Water Supply Corporation can follow a route along Stoddard Road after the line owner and existing utilities are checked.
- Fiber route: A fiber conduit along Happy Land Road can pass beneath pavement and driveways without opening a continuous trench.
- Creek crossing: A planned route at Byu la Nana can pass under the channel, with water jurisdiction checked during planning.
- Rail crossing: A bore beneath Union Pacific track needs the railroad’s crossing agreement before the route is set.
- Electric conduit: Near Burt Drive, the serving line owner is confirmed before planning a conduit bore.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a quote near Appleby’s Union Pacific track?
For an Appleby quote, send a map pin because a point on Happy Land Road versus a Byu la Nana crossing changes the route we need to assess. Include what is going in the ground, the pipe or conduit size and the footage. A sketch or plans help us see whether the line approaches US 59, Union Pacific track or a marked utility.
Price follows the work at the specific Appleby site. Ground conditions matter: the mapped clay at depth can take staged reaming, while the Reklaw Formation may mean firmer material. Crossing count and exposure work affect the plan near US 59, Union Pacific track or Byu la Nana. Pavement, pits, excavator time and sand backfill also shape the scope. Mobilization matters because Appleby is 391 road miles from Yukon; high profile or emergency work can add planning needs.
Questions people ask about boring in Appleby
Does Trinity take directional boring jobs in Appleby, Nacogdoches County?
Yes, Trinity Boring Solutions takes jobs in Appleby and across Texas. Appleby is 391 road miles from our Yukon main office, and work is staffed by our crews or through satellite yards operated by drilling contractors we have vetted. You deal with Trinity from the first call through the bore log, including work near US 59.
Does Appleby or the county control Stoddard Road, and can a bore avoid cutting it?
Appleby is an incorporated city, so its city streets, including Stoddard Road, belong to the city itself. Directional boring can carry a line beneath the street rather than opening a trench across its surface. The route still needs planning around the road pavement and marked utilities.
What does Appleby housing age near Happy Land Road mean for replacement bores?
Appleby’s median housing year is 1992, according to the American Community Survey 2019 to 2023 five year estimates. The range of housing ages means a Happy Land Road project could involve a replacement line or a new service, but the home age alone does not identify buried pipe. On Appleby boring routes, we expose marked utilities before drilling near them.
Could groundwater or flooding affect bore pits near Appleby’s Byu la Nana?
It could affect planning: the USDA soil survey maps a seasonal water table within 60 inches across 41 percent of Appleby and flood prone soils across 3 percent. At Byu la Nana, the channel also matters to the crossing plan. We can size pits for the site and use pumping if water collects.
Does Appleby Nacogdoches soil corrode steel, and what pipe can a bore use?
The USDA soil survey maps high steel corrosion risk across 99 percent of Appleby, so uncoated steel casing and tracer wire deserve attention. For Appleby boring work, we account for the fact that HDPE is not affected by that soil corrosion concern. The line owner chooses any coating for steel components, and the planned line material depends on the job near Nacogdoches soil.
What ground does a bore pass through in Appleby’s Nacogdoches soil?
The USDA soil survey maps Nacogdoches soil across 56 percent of Appleby. At about 40 inches, clay is mapped across 61 percent of the area, with clay loam across 31 percent and sandy clay across 8 percent. Sticky clay can grip a pipe, so staged reaming and controlled fluid help keep a bore on plan.
Can I reach Trinity after hours about an urgent bore on Appleby’s Stoddard Road?
Yes. Trinity answers calls 24 hours a day at (405) 409-7423, including urgent work questions about a route near Stoddard Road. Tell us the location and what line is involved so we can understand the situation and the work needed in Appleby.
How much Texas811 notice is needed for a bore near Appleby’s Burt Drive?
For a bore near Burt Drive, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For Appleby requests in ZIP codes 75965 and 75946, we submit a new request if the start slips more than 14 days past the original notice. On Appleby routes, we have worn or moved marks refreshed through Texas811 before work continues.
What affects the cost of a directional bore near Appleby’s US 59?
The job’s length and pipe or conduit size matter, along with Appleby’s clay, utilities to expose, pavement, pits and equipment time. Crossings of US 59, Union Pacific track or Byu la Nana can change the plan. The 391 road miles from Yukon also affect mobilization, and urgent or high profile work may add planning demands.
Where the Appleby facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Appleby
- U.S. Census Bureau, TIGER/Line 2024: Appleby boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Appleby
- U.S. Census Bureau, American Community Survey 2019 to 2023: Appleby housing units and year built
- Macrostrat geologic map compilation: map units under Appleby
- U.S. EPA Safe Drinking Water Information System: public water systems serving Appleby
- U.S. Department of Transportation, North American Rail Network: track owners in Nacogdoches County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Nacogdoches County
- U.S. Geological Survey, Elevation Point Query Service: Appleby elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Appleby
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Appleby
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Appleby, Texas
Type the address of your job in Appleby. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Appleby
Same county: Chireno. All counties: Texas county list.
