Hondo Texas Directional Boring: Knippa Clay, US 90 and Elm Slough
Quick Answer: The City of Hondo owns its electric system and public water system, so we confirm the line owner before planning a bore beneath US 90. Trinity Boring Solutions takes directional boring work in Hondo, also called horizontal directional drilling (HDD), including routes beneath US 90. Hondo is 520 road miles from our Yukon, Oklahoma main office, which affects mobilization for work near Elm Slough. Knippa clay is common here and can stick to a reamer, so we plan the fluid and reaming sequence around that ground.
Hondo bores at a glance
- County seat of Medina County, Texas. Population 8,969 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 520 miles, about 10.1 hours of driving.
- Ground: Knippa soil is mapped on 62 percent of the area, with silty clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 8 percent of the area.
- Highways inside the boundary: US 90, FM 1250, FM 462, FM 2676 and Texas State Highway 173. State permit office: TxDOT San Antonio District.
- Railroad track inside the boundary: Union Pacific, with 13 mapped street and rail crossings.
- Named streams inside the boundary: Elm Slough, East Branch Live Oak Creek and Little Live Oak Creek.
- Public water: City of Hondo, groundwater wells.
- Electric: City of Hondo municipal electric system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in Hondo, Medina County?
Trinity Boring Solutions takes directional boring work in Hondo, Medina County, where the City of Hondo water system and city owned electric system make line ownership an early check. The Census Bureau Vintage 2024 estimate puts Hondo at 8,969 people. We install water, sewer, gas, electric conduit and fiber, including routes beneath local streets where existing services must be located before drilling.
Our main office is in Yukon, Oklahoma, and Hondo work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For directional boring near US 90 in Hondo, our family business began in 1965, and we have done directional boring since 1982. With the City of Hondo water and electric systems already in the ground, our record of no utility strike in over 25 years reflects the care we take around buried lines.

What is Hondo ground like around Knippa soil?
Hondo ground is largely Knippa soil, which the USDA soil survey maps across 62 percent of the city. Clay makes up 64 percent of mapped surface texture, while clay loam accounts for 25 percent. At about 40 inches below the surface, silty clay loam is mapped across 62 percent of the area, and average clay content at that depth is 36 percent. When planning work near US 90 in Hondo, we treat these as mapped soil patterns, not test borings. Sticky clay can gather on a reamer and grip pipe, so the bore plan needs to account for the ground along the route.
| USDA soil survey, inside the Hondo city limits | What is mapped |
|---|---|
| Soil series mapped | Knippa 62 percent, Divot 12 percent, Atco 6 percent, Sabenyo 5 percent and Castroville 4 percent |
| Texture at the surface | clay 64 percent, clay loam 25 percent and loam 6 percent |
| Texture about 40 inches down | silty clay loam 62 percent, clay 17 percent and clay loam 7 percent |
| Engineering class about 40 inches down | lean clay (CL) 83 percent, silty clay (CL ML) 6 percent and clayey sand (SC) 4 percent |
| Average clay content about 40 inches down | 36 percent |
| Bedrock mapped within 60 inches | 8 percent of the area (0 percent hard rock, 8 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 12 percent of the area |
| High corrosion risk for uncoated steel | 82 percent of the area |
The USDA soil survey maps weathered bedrock within 60 inches across 8 percent of Hondo; hard bedrock is not mapped at that depth. A seasonal water table is not mapped, while flood prone soils cover 12 percent, a concern to check near Elm Slough. High steel corrosion risk is mapped across 82 percent, so the line owner should consider casing and tracer wire materials; When planning underground work in Hondo, we know HDPE is unaffected by soil corrosion, while site conditions still guide our boring plans. The geologic map includes Alluvium, undivided, of Cenozoic age and Late Cretaceous sedimentary material, so conditions can vary along a bore.
What does it take to bore Hondo silty clay loam?
Hondo’s mapped silty clay loam and heavy clay call for controlled fluid and staged reaming. Along a route near Elm Slough, we also plan the bore depth and pits around the drainage.
- For Knippa clay, we use a thinner drilling fluid with polymer and ream in stages, then plan to pull pipe the day the hole is opened so clay has less time to grip it.
- Because Hondo maps heavy clay with 36 percent average clay at about 40 inches, we watch fluid returns and keep pressure controlled near pavement to avoid lifting it.
- We track the drill head from the surface and log depth and pitch as the bore advances, especially where the route approaches a creek channel such as Elm Slough.
- Before the drill nears a marked line along Avenue M, we hydrovac pothole it; the locate paint shows where the line runs but does not show its depth.

Where might a Hondo line go under US 90?
A Hondo bore may need to pass beneath US 90, which has 4.7 mapped roadway miles inside city limits, or a state route such as FM 1250. The longer street routes include 19th Street at 4.56 miles, 30th Street at 2.45 miles and Avenue M at 2.26 miles. Those street lengths do not identify the exact crossing, so we use the project route and locate information to plan pits and keep pavement intact.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 90 | US highway | 4.7 roadway miles inside | State highway office |
| FM 1250 | State highway | 2.4 roadway miles inside | State highway office |
| FM 462 | State highway | 1.8 roadway miles inside | State highway office |
| FM 2676 | State highway | 0.4 roadway miles inside | State highway office |
| Texas State Highway 173 | State highway | 0.3 roadway miles inside | State highway office |
| Union Pacific | Railroad | 7.25 track miles inside | The railroad |
| Elm Slough | Stream | 4.05 channel miles inside | Checked for Corps of Engineers jurisdiction |
| East Branch Live Oak Creek | Stream | 2.4 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Little Live Oak Creek | Stream | 1.29 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Hondo Creek | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 7.25 track miles inside Hondo, and 13 mapped street and rail crossings make track coordination a real route consideration. Elm Slough has 4.05 channel miles in the city, while East Branch Live Oak Creek and Little Live Oak Creek are also mapped within city limits. Public records map 15 street crossings of named streams. No lakes or ponds are mapped within one mile, but a creek route still needs depth and access planning.
Who signs off on a Hondo bore near Union Pacific?
For work in the US 90 right of way, TxDOT reviews the highway utility permit through its San Antonio District, and the utility owner submits the application in RULIS. We prepare the bore plan and profile for that owner’s filing. Hondo’s city streets belong to the city itself. A route under Union Pacific track needs an agreement with the railroad that owns it, and that agreement sets crossing conditions. If a route crosses Elm Slough or another creek, we check during planning whether the crossing is within U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which Hondo lines belong to the City of Hondo?
The City of Hondo owns the public water system, which uses groundwater wells and reports 4,833 service connections serving 11,044 people. For underground planning in Hondo, we account for the fact that the city also owns its municipal electric system. Those systems can share street corridors with proposed water, sewer or conduit work, so we confirm the line owner and expose marked utilities before drilling near them. That check matters along streets such as 19th Street, where existing lines may affect a planned route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Hondo | Public water system | Groundwater wells | 4,833 connections, 11,044 people served |
| City of Hondo municipal electric system | City owned electric system | Reports to the U.S. Energy Information Administration | 3,060 customers reported |
| AEP Texas Central, City of San Antonio, Bandera Electric Cooperative, Karnes Electric Cooperative and Medina Electric Cooperative | Electric utilities reporting service in Medina County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Hondo’s median housing year at 1973, which does not determine underground conditions for our boring plans. The survey estimates 33 percent of housing was built before 1960, 54 percent from 1960 to 1999 and 13 percent in 2000 or later. That mix can mean both replacement work and new service routes. Before a bore near Avenue M, we hydrovac pothole every marked utility on the path; paint shows position, not depth.

How far is Hondo from San Antonio and our Yukon office?
Hondo is the county seat of Medina County, at an elevation of 905 feet, and covers 10.05 square miles in ZIP code 78861. D’Hanis is 6.7 miles west, Yancey is 14.4 miles south, and Castroville is 18.5 miles east. San Antonio, the nearest larger city, is 39.1 miles east. From our Yukon, Oklahoma main office, Hondo is 520 road miles and a 10.1 hour drive, which is part of planning crew mobilization for work near US 90.
Places near Hondo
- Directional boring in D’Hanis: 6.7 miles west
- Directional boring in Yancey: 14.4 miles south
- Directional boring in Castroville: 18.5 miles east
- Directional boring in Sabinal: 18.7 miles west
- Directional boring in Devine: 21.1 miles southeast
- Directional boring in San Antonio: 39.1 miles east
What would we bore near Hondo 19th Street?
- Highway crossing: A route beneath US 90 needs a bore plan that accounts for the highway pavement and the utility owner’s permit.
- Street service: A water or sewer service along 19th Street can run beneath pavement, keeping the street surface uncut.
- Fiber conduit: A conduit route near Avenue M needs marked utilities exposed before the drill approaches them.
- Creek crossing: A bore beneath Elm Slough needs planned depth and access on each side of the channel.
- Rail crossing: A route beneath Union Pacific track requires coordination with the railroad that owns the track.
- Electric conduit: Near the City of Hondo system, we confirm the line owner before planning a conduit route.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Hondo Elm Slough?
For a route near Elm Slough, start with the address or map pin, then tell us what will go underground, the pipe or conduit size and the footage. A sketch or plans help show where the bore begins and ends, including any creek, road or utility crossing. Those details let us review the route before we scope the work.
Price follows the job conditions, not just the footage. Knippa clay affects drilling and reaming; a route beneath US 90 or Union Pacific track adds crossing coordination; and the 520 road miles from Yukon affect mobilization. We also account for pipe or conduit size, marked utilities to expose, pavement or concrete, creek crossings such as Elm Slough, pits, excavator time, sand backfill and emergency or high profile work.
Questions people ask about boring in Hondo
Does Trinity Boring Solutions take directional boring jobs in Hondo, Medina County, and how are crews assigned?
Yes. Trinity takes directional boring work in Hondo, Medina County, with our own crews and partner drilling contractors from satellite yards we have vetted. For Hondo work, we stay with you from the first call through the bore log, whichever crew is on site. We coordinate around existing City of Hondo water and electric lines before drilling.
Can groundwater or flood prone ground near Hondo Elm Slough cause trouble for bore pits?
A seasonal water table is not mapped in Hondo, but flood prone soils cover 12 percent of the city, so a route near Elm Slough still needs site specific pit planning. We assess channel conditions and access, and plan depth to stay beneath the creek. Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.
Does Hondo Knippa soil create a steel corrosion concern, and what pipe can be used?
The USDA soil survey maps high steel corrosion risk across 82 percent of Hondo, so the line owner should consider casing and tracer wire materials. When planning underground work in Hondo, we know HDPE is unaffected by soil corrosion, while site conditions still guide our boring plans. The suitable pipe and any coating depend on the line design; we coordinate that choice with the owner for the proposed route near a street such as Avenue M.
What ground does a Hondo bore pass through in Knippa soil?
Knippa is the dominant mapped soil series in Hondo, covering 62 percent of the city. At about 40 inches below the surface, the USDA soil survey maps silty clay loam across 62 percent of the area. On Hondo boring plans, we treat these as mapped patterns, not test borings, rather than site specific test results. Sticky clay can collect on the reamer, so we plan staged reaming and fluid for the route.
Is there rock near the surface on a Hondo bore route?
The USDA soil survey maps bedrock within five feet across 8 percent of Hondo, and that mapped bedrock is weathered; hard bedrock is not mapped within that depth. This does not establish conditions at a particular site. Near Elm Slough or elsewhere in the city, the bore plan still needs to allow for changes in ground along the route.
Who approves a Hondo bore under US 90, and which state office reviews it?
TxDOT’s San Antonio District reviews a utility permit for work in the US 90 right of way. The utility owner, not the drilling contractor, files the application through RULIS, and we provide the bore plan and profile for that filing. If the route also crosses Union Pacific track, a railroad agreement is needed from the track owner.
Can I reach Trinity after hours about an urgent bore near Hondo Avenue M?
Yes. We answer Trinity’s phone 24 hours a day at (405) 409-7423 for questions about underground work in Hondo. For an urgent job near Avenue M, share the location and what line needs to go in so we can understand the request. Trinity also provides 24 hour emergency response for work in Hondo and elsewhere in Texas.
How much notice does Texas811 need for a Hondo bore along 19th Street, and what if marks move?
For a bore along 19th Street, submit the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. Texas811 describes this as at least two working days. If the start slips more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before work continues.
What affects the cost of directional boring in Hondo near US 90?
The route and scope set the price, with no single factor deciding it. Knippa clay affects the drilling plan; a US 90 or Union Pacific crossing adds coordination; and distance from the Yukon office affects mobilization. Other factors include bore length and size, utilities to expose, pavement, Elm Slough crossings, pits, excavator time, backfill and emergency work.
Where the Hondo facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Hondo
- U.S. Census Bureau, TIGER/Line 2024: Hondo boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Hondo
- U.S. Census Bureau, American Community Survey 2019 to 2023: Hondo housing units and year built
- Macrostrat geologic map compilation: map units under Hondo
- U.S. EPA Safe Drinking Water Information System: public water systems serving Hondo
- U.S. Department of Transportation, North American Rail Network: track owners in Medina County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Medina County
- U.S. Geological Survey, Elevation Point Query Service: Hondo elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Hondo
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Hondo
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Hondo, Texas
Type the address of your job in Hondo. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Hondo
Same county: Natalia · Lake Medina Shores · LaCoste · Lytle. All counties: Texas county list.
