trinityboringsolutions.com

Yancey Texas Directional Boring: Duval Soil, FM 2200 and West Tehuacana Creek

Quick Answer: Along West Tehuacana Creek and FM 2200, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Yancey, Texas. Yancey is 531 road miles from our Yukon yard; Church Street is a local access reference. The USDA soil survey maps sandy clay loam under about 65 percent of the area at 40 inches, so clay can cling to tooling and pipe. Creek or drainage crossings at West Tehuacana Creek need a planned bore path and a jurisdiction check.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Yancey bores at a glance

  • Unincorporated community in Medina County, Texas. Population 300 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 531 miles, about 10.4 hours of driving.
  • Ground: Duval soil is mapped on 32 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 32 percent of the area.
  • Highways inside the boundary: FM 2200. State permit office: TxDOT San Antonio District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: West Tehuacana Creek and Tehuacana Creek.
  • Public water: Yancey Water Supply Corporation, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Does anyone handle directional boring in Yancey near West Tehuacana Creek?

We take directional boring work in Yancey, 531 road miles from our Yukon yard, with our own crews and vetted partner contractor satellite yards; the 2020 Census counted 300 people in Medina County. The mapped community has no city government. We can route water, sewer, gas, electric conduit or fiber beneath Church Street or FM 2200, with the line type and access shaping the bore plan.

Our main office is in Yukon, Oklahoma, and Yancey work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have done directional boring since 1982; the FM 2200 routes and West Tehuacana Creek crossings call for that drilling experience to be matched to the ground and crossing plan.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Yancey and Duval soil?

Duval is the most common mapped soil series in Yancey, covering 32 percent of the area, while Miguel covers 24 percent. At about 40 inches, the USDA soil survey maps sandy clay loam under 65 percent of the area and clay loam under 15 percent. Average clay content at that depth is 32 percent, and sandy ground is mapped across 31 percent. We treat Duval, Miguel, Amphion, and Poteet soil mapping as planning context, not as test borings for Yancey crossings. On a Church Street route, the clay rich layers may cling to the reamer or grip the pipe, while sandy sections can fall in behind the bit.

USDA soil survey, inside the Yancey mapped community boundaryWhat is mapped
Soil series mappedDuval 32 percent, Miguel 24 percent, Amphion 8 percent, Poteet 7 percent and Wilco 6 percent
Texture at the surfacefine sandy loam 39 percent, loamy fine sand 25 percent and very fine sandy loam 15 percent
Texture about 40 inches downsandy clay loam 65 percent, clay loam 15 percent and sandy clay 13 percent
Engineering class about 40 inches downlean clay (CL) 77 percent, clayey sand (SC) 15 percent and clayey gravel (GC) 3 percent
Average clay content about 40 inches down32 percent
Bedrock mapped within 60 inches32 percent of the area (0 percent hard rock, 32 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils10 percent of the area
High corrosion risk for uncoated steel14 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches across 32 percent of Yancey, with typical depth at 52 inches; hard bedrock is not mapped in that depth. No seasonal water table is mapped within 60 inches, while flood prone soils cover 10 percent of the area. For Yancey work in Medina County, we consider casing and tracer wire materials where mapped high steel corrosion risk covers 14 percent. The mapped Wilcox Group, undivided, is Ypresian age and includes mudstone, sandstone, shale, siltstone and lignite. Weathered rock may slow a bore, and creek routes need care around flood prone soils.

How do we bore Yancey ground mapped as sandy clay loam?

For a Yancey route through sandy clay loam or Duval soil, we adjust the fluid and reaming plan to the ground. A West Tehuacana Creek crossing also needs a route planned beneath the channel.

  1. In sandy clay loam mapped at 40 inches, we use a staged reaming plan and adjust fluid so sticky material does not build up on the reamer.
  2. Where the mapped sandy area appears along a Duval route, we support the opening with drilling fluid and have the pipe ready before the final ream.
  3. At a West Tehuacana Creek approach, we plan depth beneath the channel and check the crossing for U.S. Army Corps of Engineers jurisdiction.
  4. Before drilling near a marked line along Church Street or FM 2200, we pothole it with hydrovac; a walkover locator tracks the head and logs depth and pitch.
6 inch Schedule 40 PVC sleeve in a bore pit in sandy soil on a water main crossing at NE 24th Street, Oklahoma City
A 6 inch Schedule 40 PVC sleeve in a bore pit in sandy soil on a water main crossing in Oklahoma City.

What is in the way of a new line in Yancey near West Tehuacana Creek?

FM 2200 has 3.3 mapped roadway miles inside the Yancey community boundary, and it is the state highway route to plan around. Church Street is the longest named street at 1.62 miles. Faseler Lane has 0.34 miles and Franklin Lane has 0.13 miles mapped in the community. A bore can pass beneath pavement rather than cut across it. The route still needs to account for access, marked utilities and the surface conditions at each pit.

CrossingTypeMapped extentWho has a say
FM 2200State highway3.3 roadway miles insideState highway office
West Tehuacana CreekStream5.16 channel miles insideChecked for Corps of Engineers jurisdiction
Tehuacana CreekStream2.78 channel miles insideChecked for Corps of Engineers jurisdiction
East Tehuacana CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Yancey or within one mile outside the community boundary, and no street and rail crossing is mapped. West Tehuacana Creek runs 5.16 channel miles in the community, while Tehuacana Creek runs 2.78 miles. Eight mapped street crossings of named streams make creek approaches a real route consideration. No lakes or ponds are mapped within one mile of Yancey, so we review West Tehuacana Creek crossings for waterway constraints. A creek crossing needs a channel plan and a check for U.S. Army Corps of Engineers jurisdiction.

Who permits a Yancey bore near FM 2200 in Medina County?

Yancey is an unincorporated community in Medina County, so there is no city government to issue street permits; county or state control depends on the road. FM 2200 is a state highway, and TxDOT’s San Antonio District reviews utility work in its right of way. The utility that owns the line files through TxDOT’s RULIS system, while we prepare the bore plan and profile and work under the owner’s permit. TxDOT rules call for boring or tunneling beneath existing highway pavement, with required cover depending on the line type and location. West Tehuacana Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. No railroad is mapped near the community.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near Yancey Water Supply Corporation?

Yancey Water Supply Corporation is a local government water system using groundwater wells, with 4,055 service connections and a population served of 12,186. For a water bore near FM 2200, the system is a local point of contact for confirming the line owner and route. Medina County electric service reporting includes AEP Texas Central, City of San Antonio, Bandera Electric Cooperative, Karnes Electric Cooperative and Medina Electric Cooperative. We confirm the electric line owner for the specific address before planning a conduit bore.

Line ownerWhat it isSourceSize
Yancey Water Supply CorporationPublic water systemGroundwater wells4,055 connections, 12,186 people served
AEP Texas Central, City of San Antonio, Bandera Electric Cooperative, Karnes Electric Cooperative and Medina Electric CooperativeElectric utilities reporting service in Medina CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Yancey’s median housing year at 1992; 81 percent of units date from 1960 to 1999 and 19 percent from 2000 or later. That mix can mean planning for replacement lines as well as new services near Church Street. Before drilling near a marked water or electric line, we use hydrovac potholing to expose it; surface marks show position, not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Do you cover Yancey and nearby Hondo?

Yancey is in Medina County, at an elevation of 690 feet, and its mapped community area is 5.01 square miles. ZIP code 78886 serves the area. Moore is 10.3 miles southeast, Devine is 14.3 miles east, Hondo is 14.4 miles north, and D’Hanis is 14.7 miles northwest. Hondo is the county seat and nearest larger city. Our Yukon, Oklahoma yard is 531 road miles away, a 10.4 hour drive. That distance matters for mobilization, so route length and site access near FM 2200 help shape the job plan.

Places near Yancey

Which Yancey jobs call for a bore near Church Street?

  • Highway crossing: A bore beneath FM 2200 keeps the line below the road surface, with the utility owner arranging the TxDOT permit.
  • Water service: A connection near Yancey Water Supply Corporation needs the existing water route and marked utilities checked before drilling.
  • Fiber drop: A fiber route along Church Street can pass below pavement and driveways without opening a trench across them.
  • Creek crossing: A route beneath West Tehuacana Creek needs channel depth planning and a jurisdiction check during design.
  • Electric conduit: Near FM 2200, we confirm which Medina County electric provider owns the line before planning a conduit path.
  • Street service: A bore near Faseler Lane or Franklin Lane can connect a service while leaving the road surface uncut.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Yancey bore near FM 2200?

For a Yancey bore near FM 2200, send the address or map pin, what is going in the ground, pipe or conduit size and footage; a sketch or plans help. A route crossing West Tehuacana Creek or a Church Street driveway can change access and the layout of the entry and exit pits, so mark those features on the plan if they are on the path.

The simplest FM 2200 scope to plan has a clear route, known line locations and workable pit access. More length, larger pipe, Duval soil conditions, weathered rock, marked utilities to expose, pavement, a West Tehuacana Creek crossing, pits, excavator time or sand backfill can add work. Mobilization from Yukon also matters at 531 road miles. High profile or emergency work can change the planning needs.

Questions people ask about boring in Yancey

Does Trinity Boring Solutions take directional boring work in Yancey, Medina County?

Yes, we take directional boring work in Yancey, Medina County. Our own crews and satellite yards run by drilling partners Trinity has vetted can staff the work. You deal with Trinity from the first call through the bore log, whether the route is near Church Street, FM 2200 or West Tehuacana Creek.

What ground should I expect on a Yancey bore through Duval soil?

Duval is the most common mapped soil series in Yancey, and sandy clay loam is mapped under about 65 percent of the area at 40 inches. The USDA soil survey also maps sandy ground across 31 percent at that depth. Clay can cling to the tooling, while sandy layers can cave behind the bit.

Could a Yancey bore encounter rock near West Tehuacana Creek?

Weathered bedrock is mapped within 60 inches across 32 percent of Yancey, with typical depth at 52 inches. Hard bedrock is not mapped within that depth, but a bore can still meet weathered material that slows drilling. The soil survey maps those conditions; a Church Street route still needs site specific planning.

Who approves a bore under FM 2200 in Yancey?

TxDOT’s San Antonio District reviews utility work in the FM 2200 right of way. The utility that owns the line submits the application through TxDOT’s RULIS system, and we prepare the bore plan and profile for that permit. Yancey has no city government, so FM 2200 work is handled through the state process.

Can a line be bored under West Tehuacana Creek in Yancey?

A line can be planned beneath West Tehuacana Creek, which runs 5.16 channel miles in Yancey. The route needs depth planning to stay below the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction. Nearby flood prone soils are mapped across 10 percent of the community.

Who runs Yancey’s public water system in Medina County, and where does water come from?

Yancey Water Supply Corporation runs the public water system, and its source is groundwater wells. Public records list 4,055 service connections and a population served of 12,186. For a bore near Church Street, the water system name helps start the line owner check, but the address and route still matter.

How far is Yancey from the Yukon office, and does Hondo affect the job?

Yancey is 531 road miles and a 10.4 hour drive from our Yukon, Oklahoma yard. Hondo is 14.4 miles north and is the county seat, but it does not change who staffs a Yancey job. The distance from Yukon can affect mobilization for a route near FM 2200.

How early should I request utility marks for a Yancey bore near Church Street?

For a bore near Church Street, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. When a start in Medina County slips more than 14 days past the original notice, we make a new request. Before work continues near Church Street, we have worn or moved marks refreshed through Texas811.

What affects directional boring costs near FM 2200 in Yancey?

The route length, pipe size, Duval soil or weathered rock, utilities to expose, pavement, creek crossings, pits and backfill all affect the scope near FM 2200. Mobilization from Yukon matters too, since Yancey is 531 road miles from the yard. A map pin and plans help us assess those job details.

Where the Yancey facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Yancey

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Yancey, Texas

Type the address of your job in Yancey. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Yancey

Same county: Castroville · Natalia · Lake Medina Shores · LaCoste · Lytle. All counties: Texas county list.