Bloomington Texas Directional Boring: Dacosta Soil, Texas State Highway 185 and Union Pacific
Quick Answer: We take directional boring, also called horizontal directional drilling (HDD), for routes crossing Union Pacific tracks in Bloomington, Texas. Our Yukon, Oklahoma main office is 512 road miles away, and our own crews and vetted partner contractor yards support work near Shepley Street. Dacosta soil covers 50% of the mapped area, and clay at depth can grip the pipe. We manage that ground with staged reaming and a same day pull along Texas State Highway 185.
Bloomington bores at a glance
- Unincorporated community in Victoria County, Texas. Population 2,082 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 512 miles, about 10.3 hours of driving.
- Ground: Dacosta soil is mapped on 50 percent of the area, with clay about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Texas State Highway 185 and FM 616. State permit office: TxDOT Yoakum District.
- Railroad track inside the boundary: Union Pacific, with 8 mapped street and rail crossings.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Bloomington near Union Pacific?
For Bloomington in Victoria County, our 512 road mile mobilization from Yukon is staffed by our own crews and vetted partner drilling contractors. The Census Bureau counted 2,082 people here in the 2020 Census. Along streets such as Shepley Street, we install water, sewer, gas, electric conduit and fiber lines, with the route and nearby Union Pacific tracks considered in the bore plan.
Our main office is in Yukon, Oklahoma, and Bloomington work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have handled bores roughly 4,100 feet long with 48 inch pipe under the Arkansas River in Tulsa. A typical Bloomington job is smaller, but a route near Texas State Highway 185 still needs a plan for the ground and crossings.

What kind of ground does Dacosta soil mean for a Bloomington bore?
The USDA soil survey maps Dacosta soil across 50% of Bloomington, with Laewest across 37%. Dacosta sandy clay loam is the largest named map unit at 30%, while Laewest clay covers 16%. At about 40 inches below the surface, the survey maps clay across 97% of the area and sandy clay across 3%; the mapped soil classification there is CH. In Bloomington, we use mapped patterns for context and do not present them as test borings. For a route near Black Bayou Road 1, the address and bore path still matter because soil can vary from one block to the next.
| USDA soil survey, inside the Bloomington mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Dacosta 50 percent, Laewest 37 percent, Edna 7 percent and Telferner 6 percent |
| Texture at the surface | sandy clay loam 50 percent, clay 37 percent and loam 7 percent |
| Texture about 40 inches down | clay 97 percent and sandy clay 3 percent |
| Engineering class about 40 inches down | fat clay (CH) 100 percent |
| Average clay content about 40 inches down | 46 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 9 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 97 percent of the area |
The survey maps high steel corrosion risk across 97% of Bloomington, so the line owner should consider casing and tracer wire materials; HDPE does not have the same soil corrosion concern. Seasonal water table conditions are mapped within 60 inches in 9% of the area, which can mean water in pits. In Bloomington, flood prone soils are not mapped, so we keep that limitation in view when planning a bore. Bedrock is not mapped in the top five feet, though deeper rock is not ruled out. The geologic map shows Beaumont Formation, areas predominantly sand, of Pleistocene age, and Delta sand and silt of Late Pleistocene age.
How do crews handle clay on a directional bore in Bloomington?
On Bloomington routes through clay, we manage the fluid and reamer stages to keep the hole workable and limit pressure. Dacosta soil and the mapped clay at depth shape that approach.
- For Dacosta soil and Bloomington’s mapped clay, we use a thinner drilling fluid with polymer and open the hole in stages to manage sticky cuttings.
- Clay mapped at about 40 inches can grip pipe, so we plan to pull the line the same day the final hole is opened near Shepley Street.
- Where pavement is near Texas State Highway 185, we watch fluid returns and keep pressure controlled so the ground is not lifted.
- Before drilling near marked lines on Black Bayou Road 1, we hydrovac pothole each utility; the locator tracks the head and we log depth and pitch.

Which roads, tracks or creeks could a Bloomington bore cross near Black Bayou?
Texas State Highway 185 runs 2.6 mapped roadway miles inside the Bloomington community boundary, and FM 616 runs 0.6 miles. A bore under either state road needs its own route and permit planning. Shepley Street is the longest named street at 2.57 miles in the community, followed by Black Bayou Road 1 at 1.59 miles and Kings Road at 0.85 miles. Herbert Avenue is another named route. These streets can shape pit access and where a bore can avoid pavement.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 185 | State highway | 2.6 roadway miles inside | State highway office |
| FM 616 | State highway | 0.6 roadway miles inside | State highway office |
| Union Pacific | Railroad | 4.98 track miles inside | The railroad |
| Black Bayou | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Old River | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 4.98 track miles inside Bloomington, with eight mapped street and rail crossings in the community. A route under those tracks needs the railroad’s crossing agreement. Black Bayou and Old River are outside the mapped community boundary, 0.6 and 0.8 miles away. Unnamed drainage runs 2.6 miles inside the community, but no named stream street crossings are mapped there. Within one mile of Bloomington, no lakes or ponds are mapped, a detail we consider when planning a bore.
Who approves a Bloomington bore in Victoria County?
Bloomington is an unincorporated community with no city government, so its local streets are not approved by a city office. For work in Texas State Highway 185 or FM 616 right of way, the utility owner applies for a TxDOT utility permit through RULIS, and the TxDOT Yoakum District reviews it. We prepare the bore plan and profile for the owner’s filing and work under the permit issued to that utility. A crossing of Union Pacific track needs an agreement from the railroad that owns it. Planning a crossing near Black Bayou includes checking for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Victoria County near Bloomington?
The water provider for a specific Bloomington address has to be confirmed with Victoria County or the local water district before a bore is planned. Electric service reporting for Victoria County names AEP Texas Central, Guadalupe Valley Electric Cooperative and Victoria Electric Cooperative. That countywide reporting does not identify which provider serves each address, so we confirm the electric line owner before planning a conduit bore near Shepley Street.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central, Guadalupe Valley Electric Cooperative and Victoria Electric Cooperative | Electric utilities reporting service in Victoria County | EIA Form 861 | Confirm the line owner by address |
Bloomington’s median housing year is 1969 in the 2019 to 2023 five year estimates; we keep that age context separate from bore conditions. It estimates 40% of homes were built before 1960, 27% from 1960 to 1999 and 33% in 2000 or later. That mix can mean a project replaces older service lines or adds a new one. Near Texas State Highway 185, we use hydrovac potholing to expose marked utilities before drilling close to them; locate paint shows position, not depth.

Do you cover Bloomington and nearby Tivoli?
We serve Bloomington in Victoria County and take directional boring work around nearby Tivoli, 13.1 miles south. Bloomington is an unincorporated community covering 2.65 square miles, at an elevation of 59 feet, with ZIP codes 77951 and 77905. Placedo is 5.4 miles northeast, and Victoria, the county seat and nearest larger city, is 13.3 miles north. Port Lavaca is 16.8 miles east. From our Yukon, Oklahoma yard, the road trip to Bloomington is 512 miles and 10.3 hours, which is part of planning a job along Texas State Highway 185.
Places near Bloomington
- Directional boring in Placedo: 5.4 miles northeast
- Directional boring in Tivoli: 13.1 miles south
- Directional boring in Victoria: 13.3 miles north
- Directional boring in Quail Creek: 14.1 miles northwest
- Directional boring in Port Lavaca: 16.8 miles east
What would we bore near Black Bayou Road 1 in Bloomington?
- Highway crossing: A bore under Texas State Highway 185 needs a plan for the state right of way and the road pavement.
- Water service: A new water line along Shepley Street needs the provider for that address confirmed before we set the bore route.
- Fiber conduit: A conduit run near Herbert Avenue can be planned to pass beneath pavement rather than cut across it.
- Rail crossing: A route under Union Pacific track needs an agreement with the railroad that owns the Bloomington track.
- Drainage crossing: A bore near Black Bayou Road 1 can account for local drainage and check creek jurisdiction during planning.
- Electric conduit: Before a conduit bore near FM 616, we confirm the line owner and expose marked utilities along the path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Bloomington quote near Herbert Avenue?
For a Bloomington quote, send the address or map pin, what is going in the ground, pipe or conduit size and footage; a sketch or plans help. A route on Herbert Avenue or near Union Pacific track gives us a starting point for checking access and crossings. The more clearly the path is shown, the better we can scope the pits and bore length.
The price depends on the job details, not just footage. Dacosta soil and clay at depth can change the drilling approach, while a Union Pacific crossing adds coordination and a Texas State Highway 185 bore involves state right of way. Pipe size, length, utilities to expose, pavement, drainage crossings, pits, excavator time and backfill also affect the plan. The 512 road miles from Yukon can affect mobilization, especially for work near Herbert Avenue that needs more than one site setup.
Questions people ask about boring in Bloomington
Does Trinity take directional boring work in Bloomington, Victoria County?
Yes, we take directional boring work in Bloomington, Victoria County, and cover jobs with our own crews and vetted partner drilling contractors. From the first call through the bore log, we coordinate with Trinity for Bloomington work, regardless of which crew is on site. A route near Shepley Street or Union Pacific track is planned around its specific crossings.
Does Dacosta soil in Bloomington create corrosion concerns for steel pipe?
The USDA soil survey maps high steel corrosion risk across 97% of Bloomington, including areas with Dacosta soil. The line owner should consider casing and tracer wire materials for a route near Black Bayou Road 1. HDPE does not share that steel corrosion concern, and the material choice belongs to the line owner.
What ground should I expect below Dacosta soil in Bloomington?
The USDA soil survey maps Dacosta across 50% of Bloomington and clay across 97% of the area at about 40 inches below the surface. The mapped classification at that depth is CH. Clay can stick to a reamer and grip pipe, so a bore near Shepley Street may call for staged reaming and careful fluid control.
Will a Bloomington directional bore hit rock?
Bedrock is not mapped in Bloomington’s top five feet, but that does not rule out deeper rock. The geologic map shows Beaumont Formation, areas predominantly sand, and Delta sand and silt. Those mapped units do not replace checking the actual route, such as a proposed bore near Herbert Avenue.
Who approves a bore under Texas State Highway 185 in Bloomington?
The utility owner applies for a TxDOT utility permit through RULIS for work in Texas State Highway 185 right of way, and the TxDOT Yoakum District reviews it. We prepare the bore plan and profile for the owner’s filing. A bore beneath existing highway pavement is installed by boring or tunneling, with the permit setting the details.
What does a bore beneath Union Pacific track in Bloomington require?
A bore under the Union Pacific track in Bloomington needs an agreement from the railroad that owns it. For a Bloomington crossing, we set casing, depth and flagging details in the agreement for the bore. There are 4.98 track miles inside the community, so the proposed crossing location matters to the plan.
What bore sizes and lengths can you handle near Herbert Avenue in Bloomington?
For a Bloomington job near Herbert Avenue, we handle lines from 3/4 inch service lines up to 48 inch casing and bore lengths from 10 feet to 5,000 feet. The address, route, pipe or conduit size and site crossings help determine which setup fits the work.
How early should I call 811 before boring near Shepley Street in Bloomington?
For a bore near Shepley Street, make the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays. The request cannot be made more than 14 days before the start. If work slips more than 14 days past the original notice, make a new request; worn or moved marks need refreshing before work continues.
What affects the cost of a bore near Texas State Highway 185 in Bloomington?
The route and scope determine the price for a Bloomington bore near Texas State Highway 185. Length, pipe size, Dacosta soil, pavement, utility crossings, pits, drainage and backfill all affect the work. A Union Pacific crossing adds coordination, and mobilization also reflects the 512 road miles from Yukon.
Where the Bloomington facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Bloomington
- U.S. Census Bureau, TIGER/Line 2024: Bloomington boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Bloomington population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Bloomington housing units and year built
- Macrostrat geologic map compilation: map units under Bloomington
- U.S. Department of Transportation, North American Rail Network: track owners in Victoria County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Victoria County
- U.S. Geological Survey, Elevation Point Query Service: Bloomington elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Bloomington
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Bloomington
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Bloomington, Texas
Type the address of your job in Bloomington. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Bloomington
Same county: Inez. All counties: Texas county list.
