Harrold Texas Directional Boring: Rotan Clay Loam, US 287, China Creek
Quick Answer: Can you get a line under US 287, BNSF Railway or China Creek without cutting it? Yes, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), in Harrold, Texas, to pass beneath those crossings without opening the surface. Harrold is 158 road miles from our Yukon, Oklahoma main office, and US 287 runs through the mapped community. Rotan soil and clay loam dominate Harrold, so sticky ground can load a reamer and grip pipe.
Harrold bores at a glance
- Unincorporated community in Wilbarger County, Texas. Population 87 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 158 miles, about 3.3 hours of driving.
- Ground: Rotan soil is mapped on 65 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 4 percent of the area.
- Highways inside the boundary: US 287, FM 1763 and Texas State Highway 240. State permit office: TxDOT Wichita Falls District.
- Railroad track inside the boundary: BNSF Railway, with 5 mapped street and rail crossings.
- Named streams inside the boundary: China Creek.
- Public water: Harrold Water Supply Corporation, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in Harrold under US 287?
Trinity Boring Solutions takes directional boring work in Harrold, Wilbarger County, including routes beneath US 287 and BNSF Railway. Can you get a line under US 287 or China Creek without cutting it? We can plan a bore to leave the surface intact. The Census Bureau counted 87 residents in 2020; water, sewer, gas, electric conduit and fiber can be routed along Harrold Lane or toward the rail corridor.
Our main office is in Yukon, Oklahoma, and Harrold work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. That experience covers possible service lines along Showers Street as well as larger casing for a crossing beneath US 287. We handle sizes from 3/4 inch service lines to 48 inch casing and bore lengths from 10 feet to 5,000 feet.

What kind of ground does Harrold have in Rotan soil?
The USDA soil survey maps Rotan across 65 percent of Harrold, with Wichita at 30 percent and Cosh at 3 percent. Clay loam covers 96 percent of the mapped surface. At about 40 inches, the survey maps clay across 66 percent and clay loam across 29 percent, with an average clay content of 41 percent. For Harrold planning, we treat mapped soil patterns as context, not test borings. That clay can cling to the reamer and tighten around pipe, so the crew needs to manage cuttings and fluid as the hole advances.
| USDA soil survey, inside the Harrold mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Rotan 65 percent, Wichita 30 percent and Cosh 3 percent |
| Texture at the surface | clay loam 96 percent and fine sandy loam 3 percent |
| Texture about 40 inches down | clay 66 percent, clay loam 29 percent and bedrock 3 percent |
| Engineering class about 40 inches down | lean clay (CL) 95 percent |
| Average clay content about 40 inches down | 41 percent |
| Bedrock mapped within 60 inches | 4 percent of the area (0 percent hard rock, 4 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 96 percent of the area |
USDA mapping places bedrock within 60 inches across 4 percent of Harrold, with a typical mapped depth of 20 inches. The mapped bedrock is weathered, and hard bedrock is not mapped within 60 inches, so a route may encounter a slower transition rather than continuous hard rock. No seasonal water table or flood prone soils are mapped. High steel corrosion risk covers 96 percent of the area, a concern for uncoated casing and tracer wire; the line owner should choose suitable protection. The geologic map names the Permian age Clear Fork Group, which includes claystone, siltstone, sandstone, dolostone, limestone and gypsum.
How do we drill Harrold clay without losing control?
In Harrold, we work the clay loam with controlled fluid and staged reaming, then match the crossing plan to US 287 or China Creek. That helps manage sticky cuttings and pressure near the surface.
- Rotan clay loam can stick to the reamer, so we use thinner drilling fluid with polymer, open the hole in stages and pull pipe the same day.
- With 41 percent average clay at 40 inches, we watch fluid returns near US 287 pavement and keep pressure controlled to avoid lifting the surface.
- Before drilling near marked lines on Stewart Street, we use hydrovac potholing to check their depth; surface paint only shows their position.
- At a China Creek or BNSF Railway crossing, we track the drill head from the surface and log its depth and pitch as the bore advances.

What does a bore have to cross in Harrold near China Creek?
Harrold has US 287, FM 1763 and Texas State Highway 240 inside its mapped community boundary, so a route beneath a highway needs a separate plan from one beneath a local street. The mapped roadway lengths are 7.8 miles for US 287, 3.2 miles for FM 1763 and 1.4 miles for Texas State Highway 240. Harrold Lane is the longest named street at 1.19 miles, followed by Showers Street at 0.75 miles and Stewart Street at 0.55 miles. Those streets give a route its local access points and possible pavement constraints.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 287 | US highway | 7.8 roadway miles inside | State highway office |
| FM 1763 | State highway | 3.2 roadway miles inside | State highway office |
| Texas State Highway 240 | State highway | 1.4 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 5 track miles inside | The railroad |
| China Creek | Stream | 0.11 channel miles inside | Checked for Corps of Engineers jurisdiction |
BNSF Railway owns 5.0 track miles in Harrold, and public records map five street and rail crossings inside the community. A route under those tracks needs the railroad owner’s crossing agreement. China Creek runs for 0.11 channel miles and has one mapped street crossing, so a bore near the channel needs its own depth and access planning. No lakes or ponds are mapped within one mile of Harrold.
Do I need a permit to bore in Harrold, Wilbarger County?
In Harrold, the approval path depends on whether your route crosses US 287, a county street or BNSF Railway. Harrold is unincorporated and has no city government, so street and permit responsibility rests with the county or the state, depending on the road. For work in a state highway right of way, the line owner, not the drilling contractor, applies through TxDOT’s RULIS system; the TxDOT Wichita Falls District reviews it. We prepare the bore plan and profile for the owner. TxDOT cover rules set 60 inches at crossings for electric, communication and water lines, 48 inches for electric and communication lines running along the right of way, 36 inches for water along it, and 60 inches for pressurized sewer crossings. Highway crossings are bored or tunneled, encased and extended beneath all rural travel lanes. BNSF Railway requires its own agreement, and China Creek is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are near Harrold Water Supply Corporation lines?
Harrold Water Supply Corporation owns the local public water system, which uses purchased surface water and serves 189 people through 63 service connections. Electric providers reporting service in Wilbarger County are AEP Texas North, Oncor Electric Delivery Company, Southwestern Public Service and Tri County Electric Cooperative. Those reports do not identify the provider at each Harrold address, so we confirm the line owner before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Harrold Water Supply Corporation | Public water system | Surface water bought from another system | 63 connections, 189 people served |
| AEP Texas North, Oncor Electric Delivery Company, Southwestern Public Service and Tri-County Electric Cooperative | Electric utilities reporting service in Wilbarger County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Harrold’s median housing year at 1981, with 24 percent of units built before 1960, 49 percent from 1960 to 1999 and 27 percent in 2000 or later. A replacement route on Showers Street may pass older buried lines, while a newer service still needs a clear path. We hydrovac pothole marked utilities along the bore path before drilling near them; paint shows position, not depth.

How far is Harrold from Oklaunion and our Yukon office?
Harrold is in Wilbarger County at an elevation of 1,231 feet, and its mapped community area covers 4.05 square miles. ZIP code 76364 serves the area. Electra is 6.9 miles east, while Oklaunion is 7.7 miles northwest. Vernon, the county seat and nearest larger city, is 16.3 miles west. From our Yukon, Oklahoma main office, the drive to Harrold is 158 road miles and 3.3 hours. That distance is part of planning a crew mobilization for work near US 287 or the BNSF Railway.
Places near Harrold
- Directional boring in Electra: 6.9 miles east
- Directional boring in Oklaunion: 7.7 miles northwest
- Directional boring in Vernon: 16.3 miles west
- Directional boring in Lockett: 19.5 miles west
- Directional boring in Iowa Park: 21.4 miles east
What kinds of bores come up near Harrold Lane?
- Highway crossing: A bore beneath US 287 avoids cutting pavement, with the route and cover planned for the highway right of way.
- Water service: A new connection near Harrold Water Supply Corporation lines needs a confirmed route and exposed marked utilities before drilling.
- Fiber route: A conduit bore along Harrold Lane can pass beneath the street surface instead of opening a trench through it.
- Creek crossing: A route beneath China Creek needs channel depth planning and a check for Corps jurisdiction during planning.
- Rail crossing: A bore beneath BNSF Railway needs the track owner’s agreement and must follow its crossing conditions.
- Street replacement: A route near Showers Street can replace a buried line without cutting across the street surface.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Harrold bore near BNSF Railway?
For a Harrold quote, send an address or map pin first; the exact spot matters near China Creek, US 287 and the BNSF Railway corridor. For Harrold work, we need to know what goes underground, plus pipe or conduit size and footage. A sketch or plans help us see the route, access and crossings before we prepare the scope.
The price reflects the work at the specific Harrold site. Rotan clay loam affects drilling and reaming; crossings beneath US 287, BNSF Railway or China Creek add planning and exposure needs. Pipe size, bore length, pavement, concrete, utility crossings, pits, excavator time and sand backfill also shape the scope. Mobilization matters because Harrold is 158 road miles from Yukon. High profile or emergency work can call for additional planning.
Questions people ask about boring in Harrold
Does Trinity take directional boring jobs in Harrold, Wilbarger County?
Yes, we take directional boring work in Harrold and across Texas. Our own crews and crews from satellite yards run by drilling contractors we have vetted can handle the work. You stay in contact with Trinity from the first call through the bore log, whether the job is near US 287 or China Creek.
Can you bore a line under China Creek in Harrold?
A bore can be planned beneath China Creek to leave the channel surface uncut. Its mapped channel runs 0.11 miles through Harrold, so the route and entry points need to suit the site. During planning, we check whether the crossing falls under U.S. Army Corps of Engineers jurisdiction.
Who runs Harrold’s public water system, and where does its water come from?
Harrold Water Supply Corporation owns the public water system, and the system uses purchased surface water. Harrold’s system serves 189 people through 63 service connections, which we account for when planning underground work. For a water bore near its lines, the exact connection and route still need to be identified before drilling.
Which electric providers report service in Harrold, Wilbarger County?
AEP Texas North, Oncor Electric Delivery Company, Southwestern Public Service and Tri County Electric Cooperative report electric service in Wilbarger County. Those county reports do not show which provider serves each Harrold address. We confirm the line owner before planning conduit, and the owner can confirm conduit specifications.
Who is responsible for Stewart Street in Harrold, and must it be cut?
Harrold has no city government, so responsibility for Stewart Street rests with the county or state according to the road. The street does not automatically have to be cut for a line crossing; directional boring can pass beneath it. The specific route and road classification shape the plan.
What do Harrold’s housing ages mean for a replacement bore on Showers Street?
Harrold’s median housing year is 1981, and the American Community Survey estimates 24 percent of units were built before 1960. A replacement bore on Showers Street may encounter older buried lines, but the survey does not locate them. We expose marked utilities by hydrovac before drilling close to the route.
Does Trinity cover Electra and rural sites outside Harrold?
Yes, Trinity takes work across Texas, including Electra and rural sites outside Harrold’s mapped community boundary. Electra is 6.9 miles east of Harrold. For a route near either place, the address or map pin helps us assess access and mobilization.
How much notice does Texas811 need for a bore near Harrold Lane?
For a bore along Harrold Lane, request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. For Harrold work, we make a new request if the start moves more than 14 days past the original notice. For Harrold work, we have worn or moved marks refreshed through Texas811 before continuing.
What affects the cost of a directional bore under US 287 in Harrold?
A bore under US 287 is priced around its scope, not just its length. Rotan clay loam, pipe size, footage, pavement, utility crossings, pits and excavator time all matter. A BNSF Railway or China Creek crossing can add planning needs, and mobilization reflects Harrold’s road distance from Yukon.
Where the Harrold facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Harrold
- U.S. Census Bureau, TIGER/Line 2024: Harrold boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Harrold population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Harrold housing units and year built
- Macrostrat geologic map compilation: map units under Harrold
- U.S. EPA Safe Drinking Water Information System: public water systems serving Harrold
- U.S. Department of Transportation, North American Rail Network: track owners in Wilbarger County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Wilbarger County
- U.S. Geological Survey, Elevation Point Query Service: Harrold elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Harrold
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Harrold
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Harrold, Texas
Type the address of your job in Harrold. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Harrold
All counties: Texas county list.
