trinityboringsolutions.com

Hungerford Texas Directional Boring: Lake Charles Clay, CPKC Track And Dry Branch

Quick Answer: Lake Charles clay can cling to a reamer, and Trinity Boring Solutions uses directional boring, also called horizontal directional drilling (HDD), for lines crossing CPKC (Kansas City Southern) in Hungerford. From the Yukon, Oklahoma main office, the 474 road miles to Hungerford can affect mobilization for work near US 59. The USDA soil survey maps clay at 40 inches across 77 percent of the area, so sticky cuttings and pipe grip need attention. Dry Branch is another local crossing to plan around.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Hungerford bores at a glance

  • Unincorporated community in Wharton County, Texas. Population 390 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 474 miles, about 9.5 hours of driving.
  • Ground: Lake Charles soil is mapped on 31 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 59, US 59 Business, FM 1161 and Texas State Highway 60. State permit office: TxDOT Yoakum District.
  • Railroad track inside the boundary: CPKC (Kansas City Southern), with 2 mapped street and rail crossings.
  • Named streams inside the boundary: Dry Branch and West Bernard Creek.
  • Public water: Hungerford Municipal Utility District 1, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Hungerford near CPKC (Kansas City Southern)?

Trinity Boring Solutions takes directional boring work in Hungerford, where Lake Charles clay can stick to a reamer. Hungerford is in Wharton County and had 390 residents in the 2020 Census count. Water, sewer, gas, electric conduit and fiber can run beneath Bernard Road, FM 1161 or other local routes.

Our main office is in Yukon, Oklahoma, and Hungerford work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We handle 3/4 inch service lines through 48 inch casing and bore lengths from 10 feet to 5,000 feet. That range covers small service work near Walnut Street and larger casing plans for a US 59 crossing. Our family business began in 1965, with directional boring work since 1982.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Hungerford’s Lake Charles soil present?

Hungerford has mapped Lake Charles soil across 31 percent of its area, according to the USDA soil survey. The map unit is Lake Charles clay, 0 to 1 percent slopes. At about 40 inches below the surface, the survey maps clay across 77 percent of the area and sandy clay across 11 percent. Average clay content at that depth is 47 percent. Around Hungerford, we treat mapped soil patterns as planning context, not as substitutes for test borings. The high clay share means cuttings can stay sticky and collect on a reamer.

USDA soil survey, inside the Hungerford mapped community boundaryWhat is mapped
Soil series mappedLake Charles 31 percent, Dacosta 30 percent, Bernard 15 percent, Texana 11 percent and Gladewater 6 percent
Texture at the surfaceclay 37 percent, sandy clay loam 30 percent and clay loam 15 percent
Texture about 40 inches downclay 77 percent, sandy clay 11 percent and loam 6 percent
Engineering class about 40 inches downfat clay (CH) 83 percent and lean clay (CL) 17 percent
Average clay content about 40 inches down47 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches23 percent of the area
Flood prone soils6 percent of the area
High corrosion risk for uncoated steel84 percent of the area

For Hungerford sites, we read the mapping as no bedrock in the top five feet, not proof that deeper rock is absent. Seasonal water table is mapped within 40 inches in 23 percent of the area, so pits near Dry Branch may need pumping. Flood prone soils are mapped across 6 percent. High steel corrosion risk covers 84 percent, a concern for steel casing and tracer wire that the line owner should address. The geologic map shows Delta sand and silt from the Late Pleistocene, including clayey channel deposits.

How do we bore Hungerford’s clay ground?

Hungerford’s Lake Charles clay can hold an open hole but stick to the reamer. We adjust the fluid and reaming sequence to manage the cuttings, then pull pipe without leaving the hole open longer than needed.

  1. In Lake Charles clay, we use thinner drilling fluid and polymer, then ream in stages to limit sticky buildup on the reamer.
  2. With heavy clay mapped in Hungerford, we watch fluid returns near paved routes such as US 59 to avoid pressure lifting pavement.
  3. Before the drill approaches a marked utility near Bernard Road, we hydrovac pothole it; surface marks show position, not depth.
  4. At Dry Branch, we track the drill head from the surface and log its depth and pitch as the bore advances.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Where might a Hungerford line go under Bernard Road?

A Hungerford bore may cross US 59, US 59 Business, FM 1161 or Texas State Highway 60, all mapped inside the community. Bernard Road is the longest named street at 0.69 miles, followed by Walnut Street at 0.63 miles and Railroad Street at 0.51 miles. Rail Road Street measures 0.48 miles. The route determines whether a bore passes beneath a road or follows its right of way, and pavement crossings affect the bore plan.

CrossingTypeMapped extentWho has a say
US 59US highway1.3 roadway miles insideState highway office
US 59 BusinessUS highway0.9 roadway miles insideState highway office
FM 1161State highway2.5 roadway miles insideState highway office
Texas State Highway 60State highway1.7 roadway miles insideState highway office
CPKC (Kansas City Southern)Railroad0.96 track miles insideThe railroad
Dry BranchStream2.01 channel miles insideChecked for Corps of Engineers jurisdiction
West Bernard CreekStream1.55 channel miles insideChecked for Corps of Engineers jurisdiction
Sandy BranchStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

CPKC (Kansas City Southern) has 0.96 track miles inside Hungerford on its Rosenberg Subdivision, with 2 mapped street and rail crossings. A crossing under that track needs an agreement with the railroad; its terms set casing, depth and flagging. Dry Branch runs 2.01 channel miles inside the community, and West Bernard Creek runs 1.55. Six mapped street crossings meet named streams, so a creek route needs channel planning.

Do I need a permit for a Hungerford bore in Wharton County?

A bore beneath US 59, FM 1161 or another state route in Hungerford right of way needs a TxDOT utility permit, reviewed by the Yoakum District. For electric and communication lines, the cover depth at a highway crossing is at least 60 inches below the lowest point of the crossed grade; water and pressurized sewer crossings also need 60 inches. The utility owner submits the application in TxDOT’s RULIS system, using our bore plan and profile. Hungerford has no city government, so local streets and permits fall to the county or state. A CPKC track crossing also needs the railroad’s agreement, and Dry Branch is checked for Corps jurisdiction during planning. The party arranging a bore along Bernard Road makes the Texas811 locate request at least 48 hours before excavation, excluding weekends and legal holidays, and no earlier than 14 days ahead.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near Hungerford Municipal Utility District 1?

Hungerford Municipal Utility District 1 serves 390 people through 186 connections using groundwater wells. Before a water bore near the district’s lines, we confirm the line owner and route. AEP Texas Central, CenterPoint Energy, Jackson Electric Cooperative and Wharton County Electric Cooperative report electric service in Wharton County. We confirm the owner for the specific address before planning an electric conduit bore; the countywide list does not identify the provider at every Hungerford property.

Line ownerWhat it isSourceSize
Hungerford Municipal Utility District 1Public water systemGroundwater wells186 connections, 390 people served
AEP Texas Central, CenterPoint Energy, Jackson Electric Cooperative and Wharton County Electric CooperativeElectric utilities reporting service in Wharton CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Housing figures are not published for a place as small as Hungerford, so a route may involve a long service run or lines following FM 1161 rather than a dense street grid. June is the wettest month and February the driest on average, which matters when planning work around wet ground. As a rule, we expose every marked utility on the bore path with hydrovac potholing before drilling near it. For a proposed line under Bernard Road, that means checking each marked crossing; paint shows position, not depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

How far is Hungerford from Wharton and our Yukon office?

Hungerford is an unincorporated community in Wharton County, at an elevation of 107 feet and covering 1.84 square miles. Its ZIP code is 77448. Kendleton is 5.7 miles northeast, while Wharton is 6.2 miles south and serves as the county seat and nearest larger city. East Bernard is 8.3 miles north. The Yukon yard is 474 road miles away, a 9.5 hour drive. That distance matters for crew mobilization on a US 59 or Dry Branch project.

Places near Hungerford

Which jobs call for a bore near Hungerford’s Dry Branch?

  • Highway crossing: A bore beneath US 59 keeps the line below the roadway rather than cutting across its pavement.
  • Water service: A service route near Hungerford Municipal Utility District 1 starts with confirming the line owner and existing route.
  • Fiber drop: A fiber conduit under Bernard Road can avoid an open cut across the named street.
  • Creek crossing: A Dry Branch bore needs a route planned beneath the channel and a check for federal jurisdiction.
  • Rail crossing: A CPKC (Kansas City Southern) track bore needs railroad agreement and crossing conditions for casing and depth.
  • Drainage crossing: A route near West Bernard Creek needs attention to channel depth and the mapped wet ground.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Hungerford bore near Rail Road Street?

For a quote near Rail Road Street, start with the address or map pin. Tell us what will go underground, such as a water line near Hungerford Municipal Utility District 1. Give the pipe or conduit size and footage, whether it is a short service or a longer run. A sketch or plans showing nearby US 59, Bernard Road or Dry Branch help us set the route.

Ground, crossings and logistics shape the price. Lake Charles clay can make reaming and fluid control more demanding; pipe size and bore length also matter. Crossings of US 59, CPKC track or Dry Branch add planning and exposure needs, as can pavement, concrete, pits, excavator time and sand backfill. Mobilization reflects the 474 road miles from Yukon. High profile or emergency work can change the job scope.

Questions people ask about boring in Hungerford

Does Trinity Boring Solutions take directional boring jobs in Hungerford, Wharton County?

Yes. We take directional boring work in Hungerford, including routes near Bernard Road and US 59. Our Yukon office coordinates each job, and our own crews or crews from vetted partner drilling contractors can handle the field work. For Hungerford work, we keep Trinity involved from the first call through the bore log, regardless of which crew is on site.

What ground does a bore pass through in Hungerford near Lake Charles soil?

The USDA soil survey maps Lake Charles clay across 31 percent of Hungerford. At about 40 inches deep, clay covers 77 percent of the mapped area, with average clay content of 47 percent. That heavy clay can cling to a reamer, so the bore plan and fluid approach need to account for sticky cuttings.

Will directional boring in Hungerford encounter unmapped rock?

Bedrock is not mapped in the top five feet of Hungerford, but deeper rock is not ruled out. The geologic map instead shows Delta sand and silt from the Late Pleistocene, including clayey channel deposits. A route near Dry Branch still needs site specific planning.

For a bore under US 59 in Hungerford, who handles approval?

TxDOT’s Yoakum District reviews a utility permit for work in US 59 right of way. The utility owner files through TxDOT’s RULIS system, and we prepare the bore plan and profile for that application. The permitted cover depth and crossing conditions guide the installation.

What does a Hungerford bore under CPKC (Kansas City Southern) need?

A crossing of the CPKC (Kansas City Southern) track in Hungerford needs an agreement with the railroad that owns it. The agreement establishes crossing conditions such as casing, depth and flagging. The track lies on the Rosenberg Subdivision, so the route needs to be planned around that crossing.

Can a line be bored under Dry Branch in Hungerford?

A bore can be planned under Dry Branch, which has 2.01 channel miles inside Hungerford. The route needs to stay beneath the channel, and planning checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. Ground conditions near the stream can also affect pit placement.

How far is Hungerford from Yukon, and does nearby Wharton change the job?

Our Yukon, Oklahoma main office is 474 road miles from Hungerford, a 9.5 hour drive that we factor into scheduling. Wharton is 6.2 miles south of Hungerford, but the Yukon distance can affect mobilization. The route, such as a bore near FM 1161, and the equipment it needs also shape the work.

How much notice does Texas811 need for a Hungerford bore along Bernard Road?

The person arranging excavation along Bernard Road must request a locate at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days past the original notice, request another ticket. Before we continue work in Hungerford, we have worn or moved marks refreshed through Texas811.

What affects the cost of directional boring near US 59 in Hungerford?

The job’s length and pipe size matter, as do Lake Charles clay, utilities that must be exposed, pavement, pits and equipment time. A US 59 crossing or a route near CPKC track can add crossing planning. Creek work near Dry Branch and mobilization from Yukon also affect the scope.

Where the Hungerford facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Hungerford

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Hungerford, Texas

Type the address of your job in Hungerford. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Hungerford

Same county: El Campo · Boling · Louise. All counties: Texas county list.