trinityboringsolutions.com

Boling Texas Directional Boring: Norwood Loam, FM 1301 and Caney Creek

Quick Answer: Allen Road, Lalla Rookh Avenue and Texas Avenue are the longest named streets among Boling’s 21.86 public road miles. Caney Creek and Gardner Slough cross the community, where we use directional boring, also called horizontal directional drilling (HDD), to place lines beneath roads and waterways without cutting the surface. Boling is 491 road miles from our Yukon, Oklahoma main office, which affects mobilization for work near FM 442. Norwood loam covers 49 percent of the mapped area, and clay deeper down can cling to a reamer.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Boling bores at a glance

  • Unincorporated community in Wharton County, Texas. Population 930 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 491 miles, about 10 hours of driving.
  • Ground: Norwood soil is mapped on 53 percent of the area, with silt loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 1301 and FM 442. State permit office: TxDOT Yoakum District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Caney Creek and Gardner Slough.
  • Public water: Boling Municipal Water District, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near FM 1301 in Boling?

Trinity Boring Solutions takes directional boring work in Boling, where FM 1301 and FM 442 run through Wharton County. The 2020 Census count puts the community’s population at 930; the Census Bureau does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber along streets such as Allen Road or beneath Caney Creek, with the route planned for the line and crossing.

Our main office is in Yukon, Oklahoma, and Boling work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For work near FM 1301, our range runs from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The family business started in 1965, and we have done directional boring since 1982, serving projects from a short Texas Avenue service to a long planned crossing.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What ground should a bore expect in Boling near Norwood soil?

The USDA soil survey maps Norwood soil across 53 percent of Boling, Brazoria across 28 percent, Edna across 12 percent and Pledger across 5 percent. Norwood loam, 0 to 1 percent slopes, rarely flooded, is the largest map unit at 49 percent. Surface mapping is mostly loam at 49 percent, while the texture at 40 inches is silt loam across 53 percent and clay across 45 percent. Average clay content at that depth is 39 percent. Clay can stick to a reamer, so staged passes and a timely pipe pull matter.

USDA soil survey, inside the Boling mapped community boundaryWhat is mapped
Soil series mappedNorwood 53 percent, Brazoria 28 percent, Edna 12 percent and Pledger 5 percent
Texture at the surfaceloam 49 percent, clay 33 percent and silty clay 12 percent
Texture about 40 inches downsilt loam 53 percent and clay 45 percent
Engineering class about 40 inches downlean clay (CL) 54 percent and fat clay (CH) 45 percent
Average clay content about 40 inches down39 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches12 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel45 percent of the area

For Boling’s mapped ground, bedrock is not mapped in the top five feet, though that does not establish what lies deeper. The USDA survey maps a seasonal water table within 60 inches across 12 percent of the area, so pits may need pumping. It maps no flood prone soils, but Caney Creek still calls for attention to channel conditions. High steel corrosion risk covers 45 percent of the mapped area, a concern for uncoated casing and tracer wire. The Holocene Alluvium along streams includes sand, silt, clay and gravel, so ground can vary along a route.

How do crews bore Boling silt loam and clay?

We adapt directional boring to Boling’s silt loam and clay, matching fluid and reaming choices to the Norwood and Brazoria ground while keeping pressure controlled near paved Allen Road.

  1. Norwood and Brazoria ground can make clay cling to the reamer, so we use thinner fluid, polymer and staged reaming, then pull the pipe while the hole is open.
  2. Silt loam in Boling can soften when wet, so we keep fluid pressure low beneath pavement near FM 1301 and adjust steering as ground conditions change.
  3. A seasonal water table is mapped within 60 inches across 12 percent of Boling, so pits near Caney Creek may need to stay small and be pumped.
  4. Before drilling near Allen Road, we hydrovac expose each marked utility on the path; a walkover locator tracks the head while we log depth and pitch.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

What might a bore cross near Allen Road in Boling?

FM 1301 and FM 442 are state highways inside Boling, with mapped roadway lengths of 6.3 miles and 2.7 miles in the community. Allen Road is the longest named street at 1.05 miles, followed by Lalla Rookh Avenue at 0.67 miles and Texas Avenue at 0.58 miles. A bore beneath existing highway pavement uses boring or tunneling rather than an open cut. On rural highway crossings, the bore must extend under all travel lanes, so the proposed route and profile matter.

CrossingTypeMapped extentWho has a say
FM 1301State highway6.3 roadway miles insideState highway office
FM 442State highway2.7 roadway miles insideState highway office
Caney CreekStream4.07 channel miles insideChecked for Corps of Engineers jurisdiction
Gardner SloughStream2.97 channel miles insideChecked for Corps of Engineers jurisdiction
Alligator SloughStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Bee Tree BayouStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Public records show no railroad inside Boling or within one mile, and no mapped street and rail crossings. Caney Creek runs 4.07 channel miles inside the community, while Gardner Slough runs 2.97 miles; three mapped street crossings pass over named streams. A crossing near either waterway needs channel planning, and creek work is checked for U.S. Army Corps of Engineers jurisdiction during planning. For Boling work near Caney Creek, we account for the fact that no lakes or ponds are mapped within one mile.

Who approves a Boling bore in Wharton County?

Boling is unincorporated, so Wharton County is responsible for community streets such as Allen Road, while TxDOT handles FM 1301 and FM 442. Work in the right of way of either state highway needs a TxDOT utility permit reviewed by the Yoakum District. The utility that owns the line submits the application through RULIS, and we prepare the bore plan and profile for that filing. TxDOT rules call for boring or tunneling under existing highway pavement, with required cover depending on the line type and crossing. A Caney Creek crossing is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near Boling Municipal Water District?

Boling Municipal Water District is the local government water system, supplied by groundwater wells; it serves 800 people through 364 service connections. A water route near Allen Road may involve those existing lines, so the exact owner and route need confirmation. AEP Texas Central, CenterPoint Energy, Jackson Electric Cooperative and Wharton County Electric Cooperative report electric service in Wharton County. The line owner for a particular address must be confirmed before planning an electric conduit bore.

Line ownerWhat it isSourceSize
Boling Municipal Water DistrictPublic water systemGroundwater wells364 connections, 800 people served
AEP Texas Central, CenterPoint Energy, Jackson Electric Cooperative and Wharton County Electric CooperativeElectric utilities reporting service in Wharton CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Boling’s median housing year at 1968; 33 percent of housing was built before 1960, 62 percent from 1960 to 1999 and 5 percent in 2000 or later. A service near Lalla Rookh Avenue may be a replacement route or a new connection, and the age figures do not identify any particular buried line. We hydrovac pothole every marked utility on a bore path before drilling near it; under Lalla Rookh Avenue, paint shows position, not depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

How far is Boling from Iago and our Yukon office?

Boling is in Wharton County, with Iago 1.6 miles northwest and Wharton 10.5 miles northwest; Wharton is both the nearest larger city and the county seat. The mapped community covers 4.67 square miles at an elevation of 75 feet, and ZIP code 77420 serves the area. Needville is 11.7 miles northeast, Damon is 12.5 miles east and Kendleton is 13.7 miles north. The Yukon yard is 491 road miles away, about a 10.0 hour drive, so distance is part of mobilization planning for a job near FM 1301.

Places near Boling

What kinds of bores come up near Caney Creek in Boling?

  • Highway crossing: A line beneath FM 1301 needs a bore plan that accounts for the highway right of way and all travel lanes.
  • Water service: A connection near Allen Road can be routed toward a property without opening the paved street surface.
  • Fiber drop: Fiber conduit along Texas Avenue can use a narrow bore route that limits disturbance to pavement and driveways.
  • Creek crossing: A Caney Creek bore needs channel depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
  • Utility conduit: A route near Boling Municipal Water District lines needs the line owner confirmed before conduit placement.
  • Replacement bore: Work near Lalla Rookh Avenue can replace an older service or carry a new line, with marked utilities exposed first.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near FM 1301 in Boling?

For a route near FM 1301, tell us where the work is, what line is going in, its pipe or conduit size and the footage. An address or map pin locates the job, while a sketch or plans can show how a proposed Allen Road crossing fits the site. Those details help us define the bore before planning the equipment and route.

The price follows the work involved, not one measurement alone. Ground conditions matter: Norwood loam and clay at depth can call for staged reaming, while the mapped water table may affect pits. Crossings such as FM 1301, Caney Creek, other utilities, pavement and concrete add planning or field work. Logistics also count, including pit size, excavator time, sand backfill, high profile or emergency needs and mobilization from Yukon, 491 road miles away.

Questions people ask about boring in Boling

Does Trinity take directional boring jobs in Boling and Wharton County, and who staffs them?

Yes, we take directional boring work in Boling, Wharton County, and staff it with our own crews or partner contractor crews from vetted satellite yards. Our main office is in Yukon, Oklahoma, and you work with Trinity from the first call through the bore log, including on work near FM 1301.

Can a line be bored under Caney Creek in Boling?

A bore can be planned beneath Caney Creek, which runs 4.07 channel miles inside Boling. We plan the crossing depth around the channel, and the creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. The ground and access at the proposed route also shape the plan.

Who runs Boling’s public water system by FM 1301, and where does its water come from?

Boling Municipal Water District, a local government system, operates the public water service and uses groundwater wells. Public records report 364 service connections serving 800 people. For a bore near Allen Road, the specific water line route and owner still need to be confirmed before drilling.

Which electric company serves my Boling, Wharton County address, and who confirms conduit specs?

AEP Texas Central, CenterPoint Energy, Jackson Electric Cooperative and Wharton County Electric Cooperative report electric service in Wharton County, but that does not identify the provider at every Boling address. Confirm the line owner and conduit requirements for the specific site before planning work near FM 442.

Who is responsible for Texas Avenue in Boling, and can a bore avoid cutting it?

Boling has no city government, so Wharton County is responsible for community streets such as Texas Avenue. Directional boring can place a line beneath a street without cutting its paved surface, subject to the route, ground and utility locations. Marked lines on the bore path are exposed before drilling near them.

What do older homes near Lalla Rookh Avenue mean for replacement bores in Boling?

Boling’s median housing year is 1968 in the American Community Survey 2019 to 2023 estimates, so a project may involve replacing an older service or adding a new one. The survey does not date buried lines on Lalla Rookh Avenue. We locate and expose marked utilities before drilling near them.

How much 811 notice does a bore near Allen Road in Boling need, and what if marks move?

For a bore near Allen Road, make the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. In Wharton County, if the start slips more than 14 days past the original notice, we submit a new request. At FM 442 crossings, we refresh worn or moved marks through Texas811 before boring work continues.

How far is Boling from Wharton and Trinity’s Yukon, Oklahoma main office?

Boling is 10.5 miles southeast of Wharton and 491 road miles from our Yukon, Oklahoma main office, about a 10.0 hour drive. That distance affects mobilization for work near FM 1301, while the job’s route and equipment needs also shape the schedule and scope.

What affects the cost of a directional bore under FM 1301 in Boling?

The job scope sets the price: length, pipe or conduit size, ground, utility crossings, pavement, creek crossings, pits and equipment time all matter. A route beneath FM 1301 may require highway planning, while Caney Creek or Boling’s clay ground can change field needs. Mobilization from Yukon is also considered.

Where the Boling facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Boling

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Boling, Texas

Type the address of your job in Boling. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Boling

Same county: El Campo · East Bernard · Louise · Hungerford. All counties: Texas county list.