trinityboringsolutions.com

Inez Texas Directional Boring: Laewest Clay, US 59, CPKC Track

Quick Answer: For a bore near US 59, the water provider for the address must be confirmed, and the electric line owner checked among utilities reporting in Victoria County; Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for routes crossing Inez. Inez is 503 road miles from our Yukon, Oklahoma main office, with CPKC track running through the mapped community. Laewest clay is common here, so sticky cuttings and pressure need attention as the hole is reamed. Arenosa Creek and other drainage crossings can also affect the route and pit plan.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Inez bores at a glance

  • Unincorporated community in Victoria County, Texas. Population 2,641 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 503 miles, about 10.3 hours of driving.
  • Ground: Laewest soil is mapped on 25 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 59 and FM 444. State permit office: TxDOT Yoakum District.
  • Railroad track inside the boundary: CPKC (Kansas City Southern), with 9 mapped street and rail crossings.
  • Named streams inside the boundary: Arenosa Creek, Garcitas Creek, Marcado Creek and Casa Blanca Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Inez near CPKC (Kansas City Southern)?

Trinity Boring Solutions takes directional boring work in Inez, while a bore near US 59 first requires confirming the water provider for the address and the electric line owner. The Census Bureau counted 2,641 people in Inez in the 2020 Census. We install water, sewer, gas, electric conduit and fiber along routes such as Midway Road or FM 444, with the line owner confirmed before an electric conduit bore is planned.

Our main office is in Yukon, Oklahoma, and Inez work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have done directional boring since 1982, bringing four decades of drilling experience to Inez routes where Laewest clay can stick to a reamer. Our family business started in 1965, and you deal with Trinity from the first call through the bore log, whichever crew is on site.

Directional drill rig and crew working on a street beside a brick commercial building
Our drill and crew set up on a street beside a brick commercial building. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does a bore meet in Inez near Laewest soil?

Laewest clay and Inez fine sandy loam are among the mapped soils that shape a bore in Inez. The USDA soil survey maps Laewest soil across 25 percent of the area and Inez soil across 24 percent. Fine sandy loam covers 41 percent at the surface, while clay accounts for 25 percent. At about 40 inches below the surface, 90 percent of the mapped texture is clay, with average clay content of 44 percent. These are mapped soil patterns, not test borings, so a route still needs job specific planning.

USDA soil survey, inside the Inez mapped community boundaryWhat is mapped
Soil series mappedLaewest 25 percent, Inez 24 percent, Dacosta 23 percent, Telferner 15 percent and Edna 6 percent
Texture at the surfacefine sandy loam 41 percent, clay 25 percent and sandy clay loam 23 percent
Texture about 40 inches downclay 90 percent, fine sand 4 percent and sandy clay 4 percent
Engineering class about 40 inches downfat clay (CH) 90 percent, lean clay (CL) 4 percent and silty sand (SM) 3 percent
Average clay content about 40 inches down44 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches46 percent of the area
Flood prone soils3 percent of the area
High corrosion risk for uncoated steel97 percent of the area

At about 40 inches, the USDA soil survey maps heavy clay across 94 percent of Inez, which can grip pipe and build up on a reamer. Bedrock is not mapped in the top five feet, although that does not rule out deeper rock. A seasonal water table is mapped within 40 inches across 46 percent of the area, and flood prone soils across 3 percent. We plan around Inez’s mapped high steel corrosion risk, which covers 97 percent. The geologic map shows Beaumont Formation, areas predominantly sand, of Pleistocene age, and Delta Sand And Silt of Late Pleistocene age; those map units do not replace route specific investigation.

What does it take to bore through Inez clay?

For Inez clay, we manage the bore fluid and reaming in stages so sticky cuttings do not crowd the hole or grip the pipe. Laewest clay and the mapped seasonal water table also shape how we set up pits and schedule the pull.

  1. Clay control: Laewest clay can ball on the reamer, so we use suitable fluid, ream in stages and plan the pipe pull without leaving the hole open.
  2. Pressure watch: Inez has heavy clay in much of the mapped area, so we watch fluid returns and keep pressure in check near pavement on routes such as US 59.
  3. Wet pits: A seasonal water table is mapped within 40 inches across 46 percent of Inez, so we plan compact pits and pumping where the site needs it.
  4. Utility exposure: On Midway Road, we hydrovac expose marked utilities before drilling close; a surface mark shows where a line runs, not how deep it sits.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Which roads, tracks or creeks can a bore cross in Inez near Midway Road?

A bore in Inez may cross US 59 or FM 444, both mapped inside the community boundary. US 59 has 11.9 mapped roadway miles here, and FM 444 has 17.1. Midway Road is the longest named street at 6.8 miles, followed by Ragsdale Road at 5.62 miles and Beck Road at 3.77 miles. These long local routes can put a bore near driveways and other buried lines, so the crossing plan and access points need to match the actual address and route.

CrossingTypeMapped extentWho has a say
US 59US highway11.9 roadway miles insideState highway office
FM 444State highway17.1 roadway miles insideState highway office
CPKC (Kansas City Southern)Railroad5.51 track miles insideThe railroad
Arenosa CreekStream31.05 channel miles insideChecked for Corps of Engineers jurisdiction
Garcitas CreekStream16.7 channel miles insideChecked for Corps of Engineers jurisdiction
Marcado CreekStream5.2 channel miles insideChecked for Corps of Engineers jurisdiction
Casa Blanca CreekStream3.5 channel miles insideChecked for Corps of Engineers jurisdiction
Leona CreekStream2.57 channel miles insideChecked for Corps of Engineers jurisdiction
Dry CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Agula CreekStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

CPKC (Kansas City Southern) has 5.51 track miles inside Inez, with 9 mapped street and rail crossings. A crossing of its Rosenberg Subdivision needs an agreement with the railroad that owns the track. Arenosa Creek runs 31.05 channel miles within the community, and Garcitas Creek runs 16.7; the mapped streets cross named streams at 18 points. Creek and drainage crossings need a route plan that accounts for the channel, while the creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Who permits an Inez bore in Victoria County?

Inez is an unincorporated community, so its streets do not belong to a city government; county or state authority depends on the road. For work in the right of way of US 59 or FM 444, the utility line owner applies for a TxDOT utility permit through RULIS, and the TxDOT Yoakum District reviews it. We prepare the bore plan and profile for the owner’s application, then work under the permit issued to that owner. TxDOT cover rules include 60 inches for electric or communication lines crossing a highway and 48 inches along its right of way; the permit may set another depth.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already in the ground in Victoria County near Inez?

We confirm the water provider for an Inez address with the county or local water district before planning a bore. Public water system records do not identify a provider matched to this community. AEP Texas Central, Guadalupe Valley Electric Cooperative and Victoria Electric Cooperative report electric service in Victoria County, but that does not establish which one serves a particular Midway Road or US 59 address. We confirm the electric line owner before planning a conduit bore.

Line ownerWhat it isSourceSize
AEP Texas Central, Guadalupe Valley Electric Cooperative and Victoria Electric CooperativeElectric utilities reporting service in Victoria CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Using American Community Survey 2019 to 2023 five year estimates, we use Inez’s median housing year of 1997 as context for underground planning. Inez’s housing mix informs our underground planning: 11 percent before 1960, 47 percent from 1960 to 1999 and 42 percent in 2000 or later. That mix can mean a route serving newer homes as well as older lines being replaced. Along Ragsdale Road, we hydrovac expose marked utilities on the bore path before the drill approaches them; paint shows position, not depth.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

How far is Inez from Edna and our Yukon office?

Inez is in Victoria County, at an elevation of 56 feet, and covers 59.59 square miles within its mapped community boundary. ZIP code 77968 serves the area. Edna is 11.0 miles northeast and is the nearest larger city; Victoria, the county seat, is 12.3 miles west. From our Yukon, Oklahoma main office, Inez is 503 road miles away and a 10.3 hour drive, shaping our travel planning. Those distances matter when planning crew mobilization for a bore along US 59 or a rural street.

Places near Inez

What boring work comes up around Inez and Ragsdale Road?

  • Highway crossing: A US 59 bore goes beneath the highway rather than cutting existing pavement, with the utility owner handling the right of way permit.
  • Street service: A water or sewer service along Midway Road can pass beneath a driveway while leaving the paved surface uncut.
  • Fiber conduit: A fiber route near Ragsdale Road needs marked utilities exposed along the planned bore path before the drill approaches them.
  • Creek crossing: An Arenosa Creek bore needs a route planned beneath the channel, with jurisdiction checked during planning.
  • Rail crossing: A bore beneath the CPKC Rosenberg Subdivision needs an agreement with the railroad that owns the track.
  • Electric conduit: A route near FM 444 starts with confirming which electric line owner serves the address in Victoria County.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for directional boring near Tipton Road in Inez?

For a Tipton Road estimate, send the address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help us place pits and crossings. Note any pavement, driveway or creek on the proposed route, such as a crossing near Arenosa Creek. That detail lets us review access and the likely bore path before preparing a scope.

The job scope sets the price, with ground, crossings and logistics all affecting the work. Laewest clay can call for careful fluid control and staged reaming. A route under US 59 or the CPKC track adds crossing coordination, and nearby pavement or creek banks can affect pit placement. Pipe size, bore length, exposed utilities, concrete, excavator time, sand backfill and emergency timing also matter. Inez’s 503 road miles from Yukon affect mobilization, so the address and route details help us assess the full job.

Questions people ask about boring in Inez

Does Trinity take directional boring work in Inez, Victoria County, and who staffs it?

Yes, Trinity Boring Solutions takes directional boring work in Inez and across Texas. We handle the job from the first call through the bore log, whether our own crew or a vetted partner contractor crew is on site. For a route near US 59, the service model does not replace confirming the utility owner before planning.

Can groundwater or Arenosa Creek make bore pits difficult in Inez?

It can, depending on the site. The USDA soil survey maps a seasonal water table within 40 inches across 46 percent of Inez, so pits near Arenosa Creek may need pumping or a smaller footprint. Flood prone soils cover 3 percent of the mapped area, and a creek crossing is checked for federal jurisdiction during planning.

Does Laewest soil in Inez create a corrosion concern for steel pipe?

Yes, the soil survey maps high steel corrosion risk across 97 percent of Inez. The line owner should consider the material and protection for steel casing or tracer wire. HDPE is another option for a line design, while the owner selects any coating needed for steel along a route such as Midway Road.

What soil will a bore pass through in Inez near Laewest?

The USDA soil survey maps Laewest clay across 20 percent of the area as a map unit, and Laewest soil series across 25 percent. At about 40 inches below the surface, clay is the mapped texture in 90 percent of the area. These are survey patterns, not test borings, so conditions along a specific Ragsdale Road route can vary.

Will a directional bore in Inez hit rock?

Bedrock is not mapped in the top five feet of Inez, but deeper rock is not ruled out. The geologic map includes Beaumont Formation, areas predominantly sand, of Pleistocene age, and Delta Sand And Silt of Late Pleistocene age. Those mapped units help frame planning near US 59 but do not establish exact conditions at a bore location.

Who approves an Inez bore under US 59, and which TxDOT office reviews it?

For a bore in the US 59 right of way, the utility owner submits the utility permit application through TxDOT’s RULIS system, and the TxDOT Yoakum District reviews it. We prepare the bore plan and profile for that filing. TxDOT cover requirements depend on the line type and crossing, and the permit can specify another depth.

How far is Inez from Yukon, and does Edna change mobilization?

From our Yukon, Oklahoma main office, Inez is 503 road miles away and a 10.3 hour drive, shaping our travel planning. Edna is 11.0 miles northeast of Inez, but it does not change the distance for a crew mobilizing from Yukon. The job address, route and access near FM 444 help determine the mobilization plan.

How much notice does Texas811 need for a bore along Midway Road in Inez?

For a Midway Road bore, submit a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For an Inez bore, if the start moves more than 14 days past the original notice, we make a new request. When marks wear off or move in Inez, we refresh them through Texas811 before our work continues.

What affects directional boring costs in Inez near US 59?

The route and scope drive the price, not one local feature alone. Laewest clay affects drilling and reaming; a US 59 or CPKC crossing adds coordination. Bore length, pipe size, exposed utilities, pavement, creek crossings, pit work, excavator time and sand backfill also matter. Mobilization from Yukon is part of planning for a job in Inez.

Where the Inez facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Inez

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Inez, Texas

Type the address of your job in Inez. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Inez

Same county: Bloomington · Quail Creek. All counties: Texas county list.