McCamey Texas Directional Boring: Kinco Fine Sandy Loam, US 67 and Texas Pacifico
Quick Answer: Kinco fine sandy loam shapes much of McCamey, where Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for routes crossing Burleson Avenue. McCamey sits 501 road miles from our Yukon, Oklahoma yard, with Texas Pacifico track also shaping route planning. Kinco soil is mostly fine sandy loam, which can cut readily but needs support as the hole is opened. Kinco ground calls for controlled fluid and staged reaming before pipe is pulled.
McCamey bores at a glance
- Incorporated city in Upton County, Texas. Population 1,728 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 501 miles, about 9.8 hours of driving.
- Ground: Kinco soil is mapped on 85 percent of the area, with loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 67, US 385, FM 305 and FM 1901. State permit office: TxDOT Odessa District.
- Railroad track inside the boundary: Texas Pacifico, with 3 mapped street and rail crossings.
- Public water: City of McCamey, groundwater bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in McCamey, Upton County?
Kinco fine sandy loam is the main mapped ground, and Trinity Boring Solutions takes directional boring work in McCamey, Upton County. The Census Bureau Vintage 2024 estimate puts McCamey’s population at 1,728. Water, sewer, gas, electric conduit and fiber routes can run beneath 5th Street or connect properties along US 67, with the bore sized to the line.
Our main office is in Yukon, Oklahoma, and McCamey work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. As a family business, we started in 1965 and have done directional boring since 1982, bringing that experience to McCamey projects. From 3/4 inch service lines to 48 inch casing, and bore lengths of 10 feet to 5,000 feet, we can size a project to a service route or a crossing near US 385.

What does the soil survey show about McCamey’s Kinco soil?
The USDA soil survey maps Kinco fine sandy loam across 85% of McCamey, with Reagan loam mapped across 10%. At about 40 inches below the surface, loam is the mapped texture across 85% of the area. The surface is mapped as fine sandy loam across 90%, while loam accounts for 10%. Average clay content at that depth is 16%, and heavy clay is mapped across 10%. The survey maps no sandy area at that depth. These are mapped patterns, not test borings, so the route still needs field checks.
| USDA soil survey, inside the McCamey city limits | What is mapped |
|---|---|
| Soil series mapped | Kinco 85 percent, Reagan 10 percent and Blakeney 4 percent |
| Texture at the surface | fine sandy loam 90 percent and loam 10 percent |
| Texture about 40 inches down | loam 85 percent, clay loam 10 percent and gravelly loam 4 percent |
| Engineering class about 40 inches down | silty clayey sand (SC SM) 85 percent, lean clay (CL) 10 percent and clayey sand (SC) 4 percent |
| Average clay content about 40 inches down | 16 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
The mapped profile shows no bedrock within 60 inches, and seasonal water table and flood prone soils are not mapped in McCamey. High steel corrosion risk is not mapped either, though the line owner should choose casing and tracer wire materials for the project. The geologic map shows Quaternary deposit, undivided, of Cenozoic age, including alluvium, and Early Cretaceous sedimentary material. The mapped soil may allow a steady cut, while loose sand or gravel in alluvial deposits can need staged reaming and fluid support.
What does it take to bore McCamey’s loam?
McCamey’s mapped loam and fine sandy loam call for a bore plan that keeps the hole supported without pushing excess fluid toward pavement on streets such as 11th Street.
- Kinco fine sandy loam is common in McCamey, so we match drilling fluid to the cut and ream in stages to keep the hole supported.
- With loam mapped at about 40 inches, we track the drill head from the surface and log depth and pitch as a bore advances beneath 11th Street.
- Before a route near US 67 reaches marked lines, we use hydrovac potholing to expose them; paint shows position, not depth.
- For a crossing near Texas Pacifico, pits sit off the track and the bore passes beneath it, leaving the surface uncut.

What is in the way of a new line near McCamey’s Burleson Avenue?
McCamey’s route planning has to account for US 67, US 385, FM 305 and FM 1901 within city limits. Burleson Avenue is the longest named street at 1.96 miles in the city, followed by 5th Street at 1.84 miles and 11th Street at 1.7 miles. A bore beneath an existing highway avoids cutting its pavement. The street and highway choice affects access to pits, the path under pavement and how marked utilities are exposed before drilling.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 67 | US highway | 1.2 roadway miles inside | State highway office |
| US 385 | US highway | 1.2 roadway miles inside | State highway office |
| FM 305 | State highway | 1.5 roadway miles inside | State highway office |
| FM 1901 | State highway | 0.4 roadway miles inside | State highway office |
| Texas Pacifico | Railroad | 2.41 track miles inside | The railroad |
Texas Pacifico owns 2.41 track miles inside McCamey, on the Texas Pacifico Big Lake Subdivision, and the mapped street and rail crossings call for careful route coordination. A crossing of that track needs an agreement from Texas Pacifico. No streams are mapped inside or within one mile of the city, and no lakes or ponds are mapped within one mile. With no named stream crossing to plan around, the route work centers on streets, highways and the railroad.
Who must we contact to approve a directional boring crossing under US 67 in McCamey?
A bore in McCamey under US 67, US 385, FM 305 or FM 1901 needs a TxDOT utility permit for work in highway right of way, reviewed by the TxDOT Odessa District. The utility owner files through RULIS; we prepare the bore plan and profile for that application. Electric and communication lines need 60 inches of cover at highway crossings and 48 inches along the right of way. Water lines need 60 inches at crossings and 36 inches along it; pressurized sewer needs 60 inches at crossings. Existing highway pavement is bored or tunneled, and the crossing is encased. City streets belong to the City of McCamey. Texas Pacifico track work needs an agreement with the railroad, while no local stream crossing is mapped.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines near the City of McCamey water system before we bore?
The City of McCamey public water system uses purchased groundwater and has 1,092 service connections serving 1,031 people. AEP Texas North, Oncor Electric Delivery Company and Southwest Texas Electric Cooperative report electric service in Upton County; that listing does not identify the provider at every address. Before a conduit bore near the City of McCamey water system, the line owner and conduit specifications need to be confirmed. Hydrovac potholing can expose marked water and electric lines before drilling near them.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of McCamey | Public water system | Groundwater bought from another system | 1,092 connections, 1,031 people served |
| AEP Texas North, Oncor Electric Delivery Company and Southwest Texas Electric Cooperative | Electric utilities reporting service in Upton County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put McCamey’s median housing year at 1960, which we consider when planning underground work. Half of the housing was built before 1960, 30% from 1960 to 1999 and 20% in 2000 or later. A replacement line along 5th Street may follow older buried services, while newer construction may need a service connection. We pothole marked utilities along the bore path before drilling near them because locate marks show position, not depth.

How far is McCamey from Rankin and the Yukon yard?
McCamey is an incorporated city in Upton County, at an elevation of 2,452 feet and covering 2.03 square miles. ZIP code 79752 serves McCamey, and we use it to orient inquiries about underground work in the city. Rankin, the county seat, is 17.8 miles east; Crane is 19.5 miles northwest, and Iraan is 24.3 miles southeast. Fort Stockton, the nearest larger city, is 42.7 miles southwest. McCamey is 501 road miles and a 9.8 hour drive from our Yukon, Oklahoma yard, so mobilization is part of planning a bore near US 67.
Places near McCamey
- Directional boring in Rankin: 17.8 miles east
- Directional boring in Crane: 19.5 miles northwest
- Directional boring in Iraan: 24.3 miles southeast
- Directional boring in Imperial: 29.5 miles west
- Directional boring in Sheffield: 38.8 miles southeast
- Directional boring in Fort Stockton: 42.7 miles southwest
Which jobs call for a bore near McCamey’s 5th Street?
- Highway crossing: A bore beneath US 67 can carry a water or conduit line without cutting the existing highway pavement.
- Street service: A service line beneath Burleson Avenue can connect a property while leaving the paved street uncut.
- Water replacement: A replacement route near the City of McCamey water system can pass beneath 5th Street and marked services.
- Electric conduit: A proposed conduit route near FM 305 starts with confirming the line owner and exposing marked utilities.
- Rail crossing: A route beneath Texas Pacifico track needs coordination with the railroad and a crossing agreement.
- Airport service: A proposed utility route near Upton County Airport can be planned around its site access and marked lines.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for McCamey work near Texas Pacifico?
For a quote near Texas Pacifico in McCamey, send the address or map pin, what is going underground, the pipe or conduit size and the footage. For example, a proposed water service near 5th Street needs a location and line size; a crossing near US 67 needs its planned length. A sketch or plans help show the route and nearby crossings.
The job route and scope set the price. Ground conditions matter: Kinco fine sandy loam may need a different reaming plan from a route with gravel. Crossings add planning for US 67 pavement or Texas Pacifico track. Length, pipe or conduit size, marked utilities to expose, concrete or pavement, pits, excavator time and sand backfill all affect the work. McCamey’s 501 road miles from Yukon also make mobilization a factor, as can high profile or emergency work.
Questions people ask about boring in McCamey
Does Trinity take directional boring jobs in McCamey, Upton County, and who staffs them?
Yes, Trinity Boring Solutions takes directional boring work in McCamey, Upton County. Our own crews do the work, with satellite yards operated by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, whether the route is near 5th Street or US 67.
Who owns electric lines in McCamey, Upton County, and who confirms conduit specs?
AEP Texas North, Oncor Electric Delivery Company and Southwest Texas Electric Cooperative report electric service in Upton County, but that does not show which provider serves each McCamey address. The line owner needs to be confirmed before a conduit bore, including one near the City of McCamey water system, so the conduit specifications match the line owner’s requirements.
Who controls McCamey’s 11th Street, and does a new line need an open cut?
The City of McCamey is incorporated, so its city streets, including 11th Street, belong to the city itself. A directional bore can pass beneath a street without cutting its surface. The route still needs utility locating and potholing so marked lines along 11th Street are exposed before the drill approaches.
How old are McCamey’s buried lines near 5th Street, and can they be replaced by boring?
The American Community Survey 2019 to 2023 estimates give McCamey a median housing year of 1960, with 50% of homes built before 1960. That age can mean a replacement route near 5th Street must account for older buried services. We expose marked utilities before drilling near them, since paint does not show a line’s depth.
What ground does a bore cross in McCamey, including Kinco soil?
The USDA soil survey maps Kinco fine sandy loam across 85% of McCamey. At about 40 inches, loam is mapped across 85% of the area, with average clay content of 16%. Those mapped patterns help shape the bore plan, but they are not test borings; the soil along a route near Burleson Avenue still needs to be assessed in the field.
Will a directional bore in McCamey encounter rock beneath US 67?
The mapped profile shows no bedrock within 60 inches, but that does not establish conditions at greater depth. McCamey’s geologic map also shows Early Cretaceous sedimentary material below the surface units. The planned depth and route, including a crossing beneath US 385, determine whether the drill encounters harder material.
How much notice does Texas811 need for a bore on McCamey’s Burleson Avenue?
For a bore on Burleson Avenue, submit a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays. The request cannot be made more than 14 days before work starts. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed before work continues.
How far is McCamey from Fort Stockton and Trinity’s Yukon main office?
McCamey is 42.7 miles northeast of Fort Stockton and 501 road miles from Trinity’s Yukon, Oklahoma main office. The drive from Yukon is 9.8 hours, so the distance can affect mobilization for work near US 67. Trinity coordinates the project from the main office while the assigned crew performs the work.
What affects the cost of directional boring in McCamey under US 67?
The scope sets the price for a bore under US 67, with length, pipe or conduit size and the mapped Kinco ground among the factors. Crossings and marked utilities to expose, pavement, pits and excavator time also affect the work. Texas Pacifico track nearby may involve added crossing coordination, and McCamey’s distance from Yukon affects mobilization.
Where the McCamey facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside McCamey
- U.S. Census Bureau, TIGER/Line 2024: McCamey boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: McCamey
- U.S. Census Bureau, American Community Survey 2019 to 2023: McCamey housing units and year built
- Macrostrat geologic map compilation: map units under McCamey
- U.S. EPA Safe Drinking Water Information System: public water systems serving McCamey
- U.S. Department of Transportation, North American Rail Network: track owners in Upton County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Upton County
- U.S. Geological Survey, Elevation Point Query Service: McCamey elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to McCamey
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in McCamey
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in McCamey, Texas
Type the address of your job in McCamey. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.