trinityboringsolutions.com

Pattison Texas Directional Boring: Katy Fine Sandy Loam, FM 359, Bell Bottom Creek

Quick Answer: Can we get a line under FM 359, Bell Bottom Creek or a Pattison street without cutting it? Yes, we use directional boring, also called horizontal directional drilling (HDD), for those crossings in Pattison, Texas. Pattison is 451 road miles from our Yukon, Oklahoma main office, so a route near Royal Road also affects mobilization planning. Katy soil is mostly fine sandy loam at the surface, but clay loam is common about 40 inches down and can grip the pipe. That ground calls for careful fluid and reaming choices on a Morton Road bore.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Pattison bores at a glance

  • Incorporated city in Waller County, Texas. Population 628 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 451 miles, about 8.9 hours of driving.
  • Ground: Katy soil is mapped on 60 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 359, FM 362 and FM 1458. State permit office: TxDOT Houston District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Bell Bottom Creek.
  • Public water: Pattison Water Supply Corporation, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring in Pattison, Waller County?

Trinity Boring Solutions handles directional boring in Pattison, Waller County, where the Census Bureau Vintage 2024 estimate lists 628 residents. Can we get a line beneath FM 359 or Bell Bottom Creek without cutting the surface? Directional boring routes the line below the crossing, with work pits on either side. We install water, sewer, gas, electric conduit and fiber for routes along Royal Road, Morton Road and Pattison’s farm to market roads.

Our main office is in Yukon, Oklahoma, and Pattison work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A Royal Road service line can be as small as 3/4 inch, while a casing route beneath FM 359 can reach 48 inch; bore lengths range from 10 feet to 5,000 feet. Our family business began in 1965, and we have done directional boring since 1982, experience we bring to planning in Pattison.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

How does Katy soil affect directional boring in Pattison?

The USDA soil survey maps Katy soil across much of Pattison, with fine sandy loam at the surface and clay loam common about 40 inches down. Katy fine sandy loam map units cover 47 percent of the city, and Tabor fine sandy loam covers 16 percent. At that deeper level, clay loam accounts for 66 percent of mapped texture and average clay content is 34 percent. These are mapped soil patterns, not test borings, so the route still needs to be checked at the job site. The clay can cling to the reamer and grip pipe.

USDA soil survey, inside the Pattison city limitsWhat is mapped
Soil series mappedKaty 60 percent, Tabor 16 percent, Cyfair 15 percent, Lake Charles 3 percent and Styx 3 percent
Texture at the surfacefine sandy loam 90 percent, loam 4 percent and clay 3 percent
Texture about 40 inches downclay loam 66 percent, clay 19 percent and sandy clay loam 13 percent
Engineering class about 40 inches downlean clay (CL) 80 percent and fat clay (CH) 20 percent
Average clay content about 40 inches down34 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches32 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel50 percent of the area

For Pattison, the USDA soil survey maps no bedrock in the upper five feet, which describes the shallow mapped ground but does not rule out deeper rock. A seasonal water table is mapped within 60 inches across 32 percent of the area, so pits near Morton Road may need pumping. Flood prone soils cover 2 percent, and high steel corrosion risk is mapped across 50 percent. The Lissie Formation, of Pleistocene age, includes sand, silt and clay; the clay rich sections can hold an open hole while sticking to tools.

How is a bore run through Pattison clay loam?

In Pattison, clay loam mapped about 40 inches down calls for staged reaming and a fluid plan that limits sticking as a bore advances beneath Royal Road or another local crossing.

  1. We plan fluid and reaming around the clay loam mapped about 40 inches down in Pattison, using staged passes to reduce the chance of sticky cuttings gripping the pipe.
  2. Where Katy fine sandy loam gives way to deeper clay, we keep the pipe ready for the pull so the open hole is not left waiting.
  3. Seasonal water is mapped within 60 inches in parts of Pattison, so pits near Bell Bottom Creek may need pumping and a compact work area.
  4. We hydrovac marked utilities along Morton Road before drilling close to them, since surface marks show position but do not establish depth.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

Where might a Pattison line have to go under FM 359?

FM 359 has 3.3 mapped roadway miles inside Pattison, with FM 362 adding 0.8 miles and FM 1458 adding 0.1 miles. US 90 is 0.7 miles outside the city limits, and Interstate 10 is 1.1 miles away. A bore beneath one of those highways needs a route that clears the traveled way and nearby utilities. Royal Road is the longest named street inside the city at 1.74 miles, followed by Durkin Road at 1.56 miles and Morton Road at 1.01 miles. Clapp Road adds another local route at 0.89 miles.

CrossingTypeMapped extentWho has a say
FM 359State highway3.3 roadway miles insideState highway office
FM 362State highway0.8 roadway miles insideState highway office
FM 1458State highway0.1 roadway miles insideState highway office
US 90Highway nearby0.7 miles outsideState highway office
Interstate 10Highway nearby1.1 miles outsideState highway office
Union PacificRailroad nearby0.6 miles outsideThe railroad
Bell Bottom CreekStream1.37 channel miles insideChecked for Corps of Engineers jurisdiction
Kellner CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Bessies CreekStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Dry BranchStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Brookshire CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific track is mapped 0.6 miles outside Pattison, while no railroad lies inside the city limits and no street and rail crossings are mapped within them. Bell Bottom Creek runs 1.37 channel miles through the city, with two mapped street crossings of named streams. Kellner Creek and Bessies Creek are also nearby, just outside the limits. For crossings in Pattison, we account for the fact that no lakes or ponds are mapped within one mile during route planning. Creek routes need room for a below channel profile and planning for possible water crossing review.

Who has to sign off on a Pattison bore near Union Pacific?

For a Pattison bore under FM 359, TxDOT’s Houston District reviews the utility permit, while a Union Pacific track crossing needs an agreement with the railroad. At a state highway crossing, electric and communication lines need at least 60 inches of cover below the lowest crossed grade; water lines need 60 inches, and pressurized sewer lines need 60 inches. Along the right of way, the listed cover is 48 inches for electric and communication, 36 inches for water, and the district may set different depth in the permit. The utility owner files through RULIS, and we prepare the bore plan and profile for that filing. Existing highway pavement is bored or tunneled beneath, with casing at crossings. Creek routes such as Bell Bottom Creek are checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near Pattison Water Supply Corporation?

Pattison Water Supply Corporation uses groundwater wells and reports 550 service connections serving 1,650 people, so a proposed water route along Royal Road needs to account for existing services. CenterPoint Energy, Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative report electric service in Waller County. Those county reports do not identify the provider at every Pattison address, so we confirm the line owner before planning an electric conduit bore.

Line ownerWhat it isSourceSize
Pattison Water Supply CorporationPublic water systemGroundwater wells550 connections, 1,650 people served
CenterPoint Energy, Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric CooperativeElectric utilities reporting service in Waller CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Pattison’s median housing year at 1992; 16 percent of homes were built before 1960, while 37 percent date from 2000 or later. That mix can mean a Morton Road project is replacing an older line or adding a newer service. Before drilling near a marked utility, we hydrovac pothole it to check its depth; paint alone does not show how deep a line sits.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Do you cover Pattison and nearby Brazos Country?

Pattison is in Waller County at an elevation of 169 feet, and its incorporated area covers 3.53 square miles. The city’s ZIP codes are 77423 and 77466. Brookshire is 2.9 miles southeast, Brazos Country is 5.8 miles southwest, San Felipe is 7.9 miles west, and Katy is 8.4 miles east. Hempstead, the county seat, is 20.4 miles north. Our Yukon, Oklahoma yard is 451 road miles away, an 8.9 hour drive, which is part of planning mobilization for work near FM 359.

Places near Pattison

What kinds of bores come up near Pattison’s Royal Road?

  • Highway crossing: A route under FM 359 is planned to clear the traveled way, with the utility owner’s TxDOT permit covering the crossing.
  • Water service: A Pattison Water Supply Corporation connection near Royal Road needs a route checked against existing groundwater service lines.
  • Fiber drop: A fiber bore along Morton Road can pass beneath the street without opening its pavement.
  • Creek crossing: Bell Bottom Creek needs a bore profile that stays beneath the channel and is checked for Corps jurisdiction during planning.
  • Rail crossing: If a proposed Pattison route reaches the Union Pacific track outside the city, the railroad agreement governs its crossing conditions.
  • Driveway bore: A Clapp Road driveway route can leave the surface intact while pits sit on either side of the crossing.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Pattison bore near Clapp Road?

For a Clapp Road quote, start with the address or map pin, then tell us what will go in the ground, such as water or fiber. Give us the pipe or conduit size and the expected footage. A sketch or plan helps show how the route meets the street, driveway or FM 359 right of way.

A clear route with known line size and few crossings is simpler to plan near Clapp Road. The work gets more involved if Katy soil grips the reamer, if a route crosses FM 359 or Union Pacific track, or if concrete, pavement, a creek or drainage channel limits access. Length, utility exposures, pits, excavator time and sand backfill also shape the scope. Pattison’s 451 road miles from Yukon affect mobilization, and high profile or emergency work can add planning demands.

Questions people ask about boring in Pattison

Does Trinity Boring Solutions take directional boring work in Pattison, Waller County?

Yes. We take directional boring work in Pattison, Waller County, and Trinity stays responsible from the first call through the bore log. Our work is staffed by our crews or by partner drilling contractors we have vetted, including for routes near Brookshire. You work with Trinity whichever crew is on site.

What does a Pattison bore under the Union Pacific track require?

A bore that crosses Union Pacific track needs an agreement with the railroad that owns it. The track is mapped 0.6 miles outside Pattison, so a route near that boundary should account for the railroad’s crossing conditions, including casing, depth and flagging. TxDOT also asks for the agreement if the line uses highway right of way.

Can you bore a line under Bell Bottom Creek in Pattison?

A line can be routed beneath Bell Bottom Creek if the site conditions and profile allow it. The creek runs 1.37 channel miles through Pattison, so the bore plan needs to stay below the channel. For a Pattison crossing, we check US Army Corps of Engineers jurisdiction during planning before setting the work approach.

Who operates Pattison’s public water system, and where does its water come from?

Pattison Water Supply Corporation runs the public water system, which draws from groundwater wells. Pattison’s public water system reports 550 service connections serving 1,650 people, figures we consider when planning underground work. A proposed water bore near Royal Road should be planned around those existing service lines and verified utility locations.

Which electric company serves my Pattison address in Waller County?

The county reports electric service from CenterPoint Energy, Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative. That list does not identify the provider at every Waller County address. Before planning an electric conduit bore near FM 362, confirm the line owner and conduit specifications for the specific location.

Does Morton Road in Pattison need to be cut for a utility crossing?

No, a directional bore can route a utility beneath Morton Road without cutting the street surface. Because Pattison is incorporated, we treat its city streets as city owned when planning boring routes and access. The route still needs potholing at marked utilities, and the surface layout needs room for entry and exit pits.

Can I reach Trinity after hours about an urgent Pattison bore near Morton Road?

Yes. Call (405) 409-7423; a person answers Trinity’s phone 24 hours a day. Tell us whether the urgent work is near Morton Road, Bell Bottom Creek or another Pattison feature, and what line needs to be installed so we can understand the scope.

How much notice does Texas811 need for a Pattison bore near Royal Road?

For a Royal Road excavation, Texas811 needs the locate request at least 48 hours before work starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. When Pattison’s start date slips more than 14 days beyond the original notice, we submit a new request before work. Before resuming Pattison work, we have worn or moved marks refreshed through Texas811 to keep the marked route current.

What affects the price of directional boring under FM 359 in Pattison?

The route length, pipe or conduit size, soil, utility crossings and surface conditions all affect the price of a bore under FM 359. Clay loam mapped in Pattison may affect reaming, while pavement, creek crossings, pits and utility exposures add work. Mobilization for Pattison work accounts for the 451 road miles from Yukon when we plan travel and scheduling.

Where the Pattison facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Pattison

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Pattison, Texas

Type the address of your job in Pattison. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Pattison

Same county: Prairie View · Hempstead · Waller · Pine Island. All counties: Texas county list.