San Felipe Texas Directional Boring: Frydek Clay Loam, Interstate 10 and Bollingers Creek
Quick Answer: Frydek clay loam can hold a bore open, but sticky clay can build on a reamer; we do directional boring, also called horizontal directional drilling (HDD), for lines beneath Interstate 10. From our Yukon, Oklahoma main office, San Felipe is 448 road miles away, and Union Pacific tracks are one local crossing to plan around. Clay at about 40 inches can grip pipe. We use staged reaming and manage drilling fluid along Bollingers Creek and other local routes.
San Felipe bores at a glance
- Incorporated city in Austin County, Texas. Population 717 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 448 miles, about 8.9 hours of driving.
- Ground: Frydek soil is mapped on 17 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 1 percent of the area.
- Highways inside the boundary: Interstate 10, US 90 and FM 1458. State permit office: TxDOT Yoakum District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Named streams inside the boundary: Bollingers Creek, Brazos River and Bullinger Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in San Felipe near Union Pacific tracks?
Frydek clay loam can hold a hole open, while sticky clay can collect on the reamer. We take directional boring work in San Felipe, Austin County, where the Census Bureau Vintage 2024 estimate puts the population at 717. Water, sewer, gas, electric conduit and fiber can run beneath streets such as Lower Pasture Road or across routes near Interstate 10, with the bore plan matched to the line and crossing.
Our main office is in Yukon, Oklahoma, and San Felipe work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Trinity is a family business started in 1965, and we have done directional boring since 1982. Four decades of boring means we know to plan for sticky Frydek clay that can cling to the reamer and pipe.

What ground does a bore meet in San Felipe near Frydek?
The USDA soil survey maps Frydek soil across 17 percent of San Felipe, including Frydek clay loam on 0 to 1 percent slopes that are occasionally ponded. Lake Charles clay covers 9 percent, and the mapped surface texture is 23 percent clay. At about 40 inches below the surface, clay accounts for 63 percent of the mapped texture, while the survey reports an average clay content of 41 percent. These are mapped patterns, not test borings. Sticky clay can ball on a reamer and grip pipe, so the drill plan should account for it.
| USDA soil survey, inside the San Felipe city limits | What is mapped |
|---|---|
| Soil series mapped | Frydek 17 percent, Lake Charles 15 percent, Styx 8 percent, Mohat 8 percent and Verland 7 percent |
| Texture at the surface | clay loam 27 percent, clay 23 percent and fine sandy loam 21 percent |
| Texture about 40 inches down | clay 63 percent, sandy clay loam 11 percent and loam 11 percent |
| Engineering class about 40 inches down | fat clay (CH) 55 percent and lean clay (CL) 41 percent |
| Average clay content about 40 inches down | 41 percent |
| Bedrock mapped within 60 inches | 1 percent of the area (0 percent hard rock, 1 percent weathered rock) |
| Seasonal water table within 60 inches | 38 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 70 percent of the area |
Bedrock is not mapped in the top five feet of San Felipe, though the geologic map shows the Lissie Formation, of Pleistocene age, and alluvial sand, silt and clay of Chibanian age. Seasonal water tables occur within 40 inches in 30 percent of the mapped area, so pits may need pumping. Flood prone soils cover 4 percent, a consideration near Bollingers Creek. High steel corrosion risk is mapped across 70 percent, so the line owner should set any steel casing or tracer wire coating.
How do we bore through San Felipe clay?
Frydek and Lake Charles soils make clay an important part of San Felipe bore planning. We control the fluid and reaming sequence, then expose marked utilities before the drill reaches them along streets such as Manak Road.
- Frydek and Lake Charles clay can stick to a reamer, so we use thinner drilling fluid with polymer and enlarge the hole in stages.
- Where San Felipe’s heavy clay is present, we watch returning fluid and keep pressure controlled to avoid lifting pavement near Interstate 10.
- The seasonal water table mapped near 40 inches can fill pits; along Bollingers Creek, we plan compact pits and pumping as needed.
- On Manak Road, we hydrovac expose marked utilities before drilling near them, then track the drill head and log its depth and pitch.

Where might a San Felipe line go under Interstate 10?
Interstate 10, US 90 and FM 1458 run through San Felipe, so a route may need a highway crossing or work along a right of way. TxDOT rules call for boring or tunneling below an existing highway, rather than an open cut through the pavement. Manak Road is the longest named street inside town at 1.96 miles, followed by Lower Pasture Road at 1.72 miles and Sealy Road at 1.69 miles. Their road access and nearby pavement affect where pits can fit.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 10 | Interstate | 5 roadway miles inside | State highway office |
| US 90 | US highway | 5 roadway miles inside | State highway office |
| FM 1458 | State highway | 3.3 roadway miles inside | State highway office |
| Union Pacific | Railroad | 2.48 track miles inside | The railroad |
| Bollingers Creek | Stream | 3.02 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Brazos River | Stream | 1.75 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Bullinger Creek | Stream | 0.04 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mill Creek | Stream nearby | 1 miles outside | Checked for Corps of Engineers jurisdiction |
| Garret Lake | Lake or pond | 48 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Mound Lake | Lake or pond | 5 acres, nearby | Checked for Corps of Engineers jurisdiction |
Union Pacific has 2.48 track miles in San Felipe on its Smithville Subdivision, and public mapping shows 2 street and rail crossings. Any track crossing needs an agreement with Union Pacific that sets requirements such as casing, depth and flagging. Bollingers Creek runs 3.02 channel miles inside town, and the Brazos River runs 1.75 miles; mapped streets cross named streams 3 times. Creek and river plans need a check for federal jurisdiction, and Garret Lake and Mound Lake are within one mile outside town.
Who approves a San Felipe bore in Austin County?
San Felipe is incorporated, so its city streets belong to the city itself. A bore beneath Interstate 10, US 90 or FM 1458 in highway right of way needs a TxDOT utility permit reviewed by the Yoakum District. The utility that owns the line files through TxDOT’s RULIS system; we prepare the bore plan and profile for that filing and work under the utility owner’s permit. A Union Pacific crossing requires that railroad’s agreement. Near Bollingers Creek or the Brazos River, the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities may have lines in Austin County near San Felipe?
The water provider for a specific San Felipe address must be confirmed with the city, Austin County or the local water district before a bore is planned. CenterPoint Energy, Bluebonnet Electric Cooperative, Fayette Electric Cooperative and San Bernard Electric Cooperative report electric service in the county, but the line owner must be confirmed for the address before an electric conduit bore. That check helps locate the correct existing line near routes such as Sealy Road.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| CenterPoint Energy, Bluebonnet Electric Cooperative, Fayette Electric Cooperative and San Bernard Electric Cooperative | Electric utilities reporting service in Austin County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put San Felipe’s median housing year at 1986; 24 percent of units were built before 1960 and 33 percent in 2000 or later. Housing age does not date a buried line, but replacement work along Lower Pasture Road may involve older services as well as newer connections. Before drilling near a marked utility, we use hydrovac potholing to expose it; older routes can hold lines whose position or depth is not obvious from the surface.

Do you cover San Felipe and nearby South Frydek?
San Felipe is an 8.36 square mile incorporated town in Austin County, at an elevation of 156 feet, with ZIP code 77474. Sealy is 4.0 miles southwest, and South Frydek is 4.5 miles southeast; Brazos Country is 5.0 miles southeast. Bellville, the county seat, is 13.9 miles northwest, while Sealy is the nearest larger city. From our Yukon, Oklahoma main office, the road trip to San Felipe is 448 miles and 8.9 drive hours, which can affect crew mobilization for work near Interstate 10.
Places near San Felipe
- Directional boring in Sealy: 4 miles southwest
- Directional boring in South Frydek: 4.5 miles southeast
- Directional boring in Brazos Country: 5 miles southeast
- Directional boring in Pattison: 7.9 miles east
- Directional boring in Brookshire: 9.3 miles east
What kinds of bores come up near San Felipe and Bollingers Creek?
- Highway crossing: A line beneath Interstate 10 needs a bore planned for the pavement and the full highway crossing.
- Water service: A new or replacement service along Lower Pasture Road needs the address checked for its water provider and existing lines.
- Fiber conduit: A fiber route beside Manak Road can use a bore to pass beneath pavement without an open cut.
- Creek crossing: A route beneath Bollingers Creek needs depth planned under the channel and a jurisdiction check during planning.
- Rail crossing: A line under the Union Pacific Smithville Subdivision needs an agreement with the railroad before the crossing is planned.
- Electric conduit: A conduit route near Sealy Road starts with confirming which county reported utility owns the line at that address.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a San Felipe bore near Manak Road?
For a quote, send the San Felipe address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. The location of a crossing near Manak Road, Interstate 10 or Union Pacific tracks helps us understand the route and access before we scope the work.
A short, open route through Frydek clay with few marked utilities may be simple to plan. The answer changes with bore length, pipe or conduit size, soil conditions, utility exposures, pavement, creek crossings, pits, excavator time and sand backfill. A crossing beneath Interstate 10 or Union Pacific tracks can add planning demands; Bollingers Creek can affect the route and pit placement. San Felipe’s 448 road miles from Yukon also matter to mobilization.
Questions people ask about boring in San Felipe
Does Trinity take directional boring jobs in San Felipe, Austin County, and how are crews assigned?
Yes. We take directional boring work in San Felipe, and Trinity manages the job from the first call through the bore log. Our own crews or crews working from satellite yards operated by vetted partner drilling contractors may handle the site. For a route near Interstate 10, we plan around the actual crossing and ground.
How old are buried lines near Lower Pasture Road in San Felipe?
The American Community Survey 2019 to 2023 estimates give San Felipe a median housing year of 1986, with 24 percent of units built before 1960. That does not establish the age of any buried line. For a replacement bore near Lower Pasture Road, we expose marked utilities with hydrovac potholing before drilling close to them.
Can wet ground or flooding affect bore pits near Bollingers Creek in San Felipe?
It can. The USDA soil survey maps seasonal water tables within 40 inches in 30 percent of San Felipe, and flood prone soils cover 4 percent. Near Bollingers Creek, we account for wet pits, use pumping if needed and plan the bore depth beneath the channel. Creek crossings also get checked for federal jurisdiction during planning.
Can Frydek soil in San Felipe corrode a steel casing, and what pipe should I use?
The mapped high steel corrosion risk covers 70 percent of San Felipe, so steel casing and tracer wire need consideration. The line owner chooses any coating. HDPE does not share the same soil corrosion concern. Along a route near Frydek soil, the pipe material and casing plan should be decided for the particular line and bore.
What ground is under a San Felipe bore in Frydek soil?
The USDA soil survey maps Frydek soil across 17 percent of San Felipe. Clay makes up 63 percent of mapped texture at about 40 inches below the surface, and the average clay content there is 41 percent. Sticky clay can collect on the reamer and grip pipe, so staged reaming and a same day pull may suit a route near Manak Road.
Will a San Felipe bore hit rock near the Brazos River?
Bedrock is not mapped in San Felipe’s top five feet, but that does not describe every deeper layer. The geologic map identifies the Pleistocene Lissie Formation and Chibanian alluvial sand, silt and clay. A route near the Brazos River still needs site specific planning for the ground encountered below the mapped surface.
Can I reach Trinity after hours about urgent boring near Sealy Road in San Felipe?
Yes. A person answers Trinity’s phone at (405) 409-7423 24 hours a day for urgent work near Sealy Road or elsewhere in San Felipe. The scope, access and any nearby utilities or pavement still shape the response. Hydrovac potholing can expose marked lines before the drill approaches them.
How early do I need Texas811 marks for a San Felipe bore near Manak Road?
For a bore near Manak Road, Texas law requires the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days beforehand. Texas811 describes that as at least two working days. If marks wear off or move, request refreshed marks through Texas811 before work continues.
What affects the cost of directional boring in San Felipe near Interstate 10?
The job scope sets the price, not just the length. Bore footage, pipe size, Frydek clay, utility exposures, pavement, creek crossings, pits and excavator time all matter. Work under Interstate 10 or near Union Pacific tracks may take more planning, and San Felipe’s 448 road miles from Yukon affects mobilization.
Where the San Felipe facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside San Felipe
- U.S. Census Bureau, TIGER/Line 2024: San Felipe boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: San Felipe
- U.S. Census Bureau, American Community Survey 2019 to 2023: San Felipe housing units and year built
- Macrostrat geologic map compilation: map units under San Felipe
- U.S. Department of Transportation, North American Rail Network: track owners in Austin County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Austin County
- U.S. Geological Survey, Elevation Point Query Service: San Felipe elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to San Felipe
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in San Felipe
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in San Felipe, Texas
Type the address of your job in San Felipe. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for San Felipe
Same county: Bellville · Wallis · Industry · New Ulm. All counties: Texas county list.
