Pine Island Texas Directional Boring: Monaville Soil, FM 359 And Clear Creek
Quick Answer: Monaville loamy fine sand cuts readily but can cave, so Trinity Boring Solutions uses directional boring, also called horizontal directional drilling (HDD), for Pine Island routes beneath FM 359. The Yukon, Oklahoma main office is 433 road miles from Betka Road, a distance that shapes mobilization. At about 40 inches, sandy clay loam is mapped across much of Pine Island and calls for staged reaming.
Pine Island bores at a glance
- Incorporated city in Waller County, Texas. Population 1,183 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 433 miles, about 8.4 hours of driving.
- Ground: Monaville soil is mapped on 20 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 359 and FM 3346. State permit office: TxDOT Houston District.
- Railroad track inside the boundary: Union Pacific, with 1 mapped street and rail crossings.
- Named streams inside the boundary: Clear Creek and Threemile Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Pine Island, Waller County?
Monaville loamy fine sand can cave behind the bit, and Trinity Boring Solutions takes directional boring work in Pine Island, Waller County. The Census Bureau Vintage 2024 estimate puts the town at 1,183 people. We install water, sewer, gas, electric conduit and fiber lines along routes such as Betka Road or toward FM 359, with the bore plan shaped around the line and ground.
Our main office is in Yukon, Oklahoma, and Pine Island work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a short service line near Betka Road or a large casing route by FM 359, our work ranges from 3/4 inch service lines to 48 inch casing. We are a family business started in 1965, with directional boring since 1982.

What is Pine Island ground like to bore in around Monaville soil?
Pine Island ground includes Monaville soil, mapped by the USDA soil survey as loamy fine sand on 1 to 3 percent slopes across 20 percent of the town. The survey maps sandy clay loam at about 40 inches across 65 percent of the area, with clay at that depth across 11 percent. Surface textures are mostly loamy fine sand at 48 percent and fine sandy loam at 37 percent. On Pine Island, these mapped patterns guide our early bore planning, but they are not test borings. Sand can cut easily, then cave behind the drill head.
| USDA soil survey, inside the Pine Island city limits | What is mapped |
|---|---|
| Soil series mapped | Monaville 20 percent, Hockley 19 percent, Wockley 19 percent, Nahatche 7 percent and Tabor 6 percent |
| Texture at the surface | loamy fine sand 48 percent, fine sandy loam 37 percent and loam 8 percent |
| Texture about 40 inches down | sandy clay loam 65 percent, clay 11 percent and clay loam 9 percent |
| Engineering class about 40 inches down | lean clay (CL) 57 percent, clayey sand (SC) 20 percent and silty sand (SM) 11 percent |
| Average clay content about 40 inches down | 29 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 51 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 64 percent of the area |
For Pine Island, bedrock is not mapped in the top five feet, so we still allow for possible deeper rock in bore planning. A seasonal water table is mapped within 60 inches across 51 percent of the area, so pits may need pumping. Flood prone soils cover 7 percent, including ground where creek routes need care. With high steel corrosion risk mapped across 64 percent of Pine Island, we consider casing and tracer wire materials during bore planning. The geologic map includes Alluvial pebble gravel and sand of Cenozoic age and the Pliocene Willis Formation; gravel can deflect a drill head, so depth and pitch checks matter.
What does it take to bore Pine Island sandy clay loam?
Pine Island’s sandy clay loam and loamy fine sand call for controlled fluid and staged reaming. The USDA survey maps seasonal water tables in much of the area, so pit setup matters too.
- Monaville loamy fine sand can cave behind the bit, so we use a stabilizing drilling fluid and staged reaming before pulling pipe.
- With a seasonal water table mapped within 60 inches across 51 percent of Pine Island, we keep pits compact and plan to pump if water collects.
- On a route near Betka Road, we expose each marked utility by hydrovac before drilling close, then track the head and log depth and pitch.
- For a Clear Creek route, we plan to stay below the channel and check federal waterway jurisdiction during planning.

What is in the way of a new line in Pine Island near Betka Road?
FM 359 and FM 3346 run through Pine Island, while US 290 Business touches the town boundary and Texas State Highway 6 and US 290 are each 0.6 miles from it. A route near FM 359 may need to pass beneath highway pavement rather than cut across it. Betka Road is the longest named street at 4.21 miles within town limits; Cochran Road runs 3.08 miles and Brumlow Road 2.72 miles. These roads make route and access choices part of the bore plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 359 | State highway | 3 roadway miles inside | State highway office |
| FM 3346 | State highway | 1.3 roadway miles inside | State highway office |
| US 290 Business | Highway nearby | Runs along or touches the city limits | State highway office |
| Texas State Highway 6 | Highway nearby | 0.6 miles outside | State highway office |
| US 290 | Highway nearby | 0.6 miles outside | State highway office |
| Union Pacific | Railroad | 1.58 track miles inside | The railroad |
| Clear Creek | Stream | 5.02 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Threemile Creek | Stream | 2.29 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Ponds Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
Union Pacific has 1.58 track miles inside Pine Island on its Eureka Subdivision, and one street and rail crossing is mapped in town. Clear Creek runs 5.02 channel miles within the limits, and Threemile Creek runs 2.29; five street crossings of named streams are mapped. In Pine Island, no lakes or ponds are mapped within one mile, which helps us screen surface water near the planned bore. A rail or creek route needs its own crossing plan rather than assuming a street route will fit.
Who approves a Pine Island bore under FM 359?
For work in FM 359 or FM 3346 right of way, the utility owner files the TxDOT permit through RULIS, not the driller; we provide the bore plan and profile for that filing. The TxDOT Houston District reviews the application. TxDOT rules call for at least 60 inches of cover for electric and communication lines crossing a highway, 60 inches for water, and 60 inches for pressurized sewer; the permit may set another depth. Existing highway pavement is bored or tunneled, not open cut. Pine Island city streets are under city control. A Union Pacific track crossing needs an agreement with the railroad, and Clear Creek is checked for federal waterway jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are reported in Pine Island and Waller County?
The water provider for a specific Pine Island address must be confirmed with the city, Waller County or the local water district before a bore is planned. Electric service reported in Waller County includes CenterPoint Energy, Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative. Those reports do not identify the provider at every address, so we confirm the line owner before planning an electric conduit bore near FM 359.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| CenterPoint Energy, Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative | Electric utilities reporting service in Waller County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Pine Island’s median housing year at 1997; 7 percent of homes were built before 1960, 47 percent from 1960 to 1999 and 46 percent in 2000 or later. That mix can mean replacement routes as well as new services along Brumlow Road. We hydrovac pothole every marked utility on the planned bore path before drilling near it. If a proposed line runs beneath Brumlow Road, potholing shows the buried line’s depth, which locate paint does not.

Where is Pine Island in relation to Hempstead?
Pine Island is an incorporated town in Waller County, with an elevation of 211 feet and a land area of 9.34 square miles. ZIP code 77445 covers the town. Prairie View is 3.7 miles northeast and is the nearest larger place; Hempstead, the county seat, is 4.4 miles northwest. Waller is 5.9 miles east. From the Yukon, Oklahoma main office, the road distance is 433 miles and the drive is 8.4 hours. That distance is part of planning a crew mobilization for a Pine Island bore.
Places near Pine Island
- Directional boring in Prairie View: 3.7 miles northeast
- Directional boring in Hempstead: 4.4 miles northwest
- Directional boring in Waller: 5.9 miles east
- Directional boring in Bellville: 15.6 miles southwest
- Directional boring in Pattison: 16.6 miles south
What would we bore in Pine Island near Clear Creek?
- Highway crossing: A route beneath FM 359 or FM 3346 is planned as a bore under the paved roadway, with the utility owner handling the TxDOT permit.
- Street service: A water or sewer line along Brumlow Road can be routed without cutting the street pavement, subject to the site plan.
- Fiber route: Fiber conduit near Betka Road can use directional boring to cross driveways and marked utilities with potholing ahead of the drill.
- Creek crossing: A Clear Creek bore needs a route planned below the channel and a check for federal waterway jurisdiction.
- Rail crossing: A line beneath the Union Pacific Eureka Subdivision needs a crossing agreement with the railroad that owns the track.
- Drainage route: A bore near Threemile Creek can be planned around the channel and Pine Island’s mapped seasonal water table.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of directional boring in Pine Island near Union Pacific?
A map pin near Betka Road or Clear Creek matters because a small route shift can change the street, drainage or utility crossings in Pine Island. For Pine Island work, send us the address or pin, what will go in the ground, pipe or conduit size, and footage so we can scope the bore. A sketch or plans help us see the route and access before we scope the work.
Pine Island’s sandy clay loam and loamy fine sand make soil and the number of exposed utilities early price drivers, since loose ground can need staged reaming and careful fluid control. A route under FM 359 or Union Pacific track adds crossing requirements and coordination. Pavement, creek or drainage crossings, pits, excavator time and sand backfill also affect the scope. Mobilization matters too: Pine Island is 433 road miles from the Yukon yard. For Pine Island work, we account for added planning demands when a project is high profile or an emergency.
Questions people ask about boring in Pine Island
Does Trinity take directional boring work in Pine Island, Waller County, and how are crews assigned?
Yes, Trinity Boring Solutions takes directional boring work in Pine Island, Waller County. We use our own crews and crews from partner drilling contractors we have vetted, with Trinity as the customer’s contact through the bore log. A route near Betka Road is planned around its actual access and buried utilities.
Who approves a Pine Island bore beneath FM 359?
The utility owner applies for a TxDOT utility permit for work in FM 359 right of way, and the TxDOT Houston District reviews it. We prepare the bore plan and profile for the owner’s RULIS filing. TxDOT’s cover requirements depend on the line type, and the permit can set a different depth.
What does a Pine Island bore under the Union Pacific track require?
A bore beneath the Union Pacific track in Pine Island needs an agreement from the railroad that owns it. That agreement sets crossing conditions such as casing, depth and flagging. The town has 1.58 Union Pacific track miles, so the crossing location needs to be identified before the route is planned.
Can a line be bored under Clear Creek in Pine Island?
A bore beneath Clear Creek can be planned, but the route needs to account for the channel and the site conditions. The creek runs 5.02 channel miles within Pine Island. During planning, the crossing is checked for U.S. Army Corps of Engineers jurisdiction before the bore approach is set.
Who owns electric lines in Pine Island, Waller County, and who confirms conduit specs?
The line owner for a specific Pine Island address must be confirmed before conduit plans are set. CenterPoint Energy, Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative report electric service in Waller County. We confirm the owner and its conduit requirements for the proposed route, including one near FM 3346.
Does Pine Island control Brumlow Road, and does a bore require cutting it?
Pine Island is incorporated, so its city streets, including Brumlow Road, belong to the city itself. A directional bore can pass below street pavement without an open cut when the route and approvals allow. Brumlow Road extends 2.72 miles within town limits, making the specific crossing location important.
Can I reach Trinity after hours about an urgent Pine Island bore near Brumlow Road?
Yes, a person answers Trinity’s phone 24 hours a day at (405) 409-7423. For an urgent bore near Brumlow Road, have the location and line type ready so we can understand the request. The street’s route and marked utilities still need to be considered before drilling.
How much notice does Texas811 need for a Pine Island bore near Betka Road?
For a bore near Betka Road, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days beforehand. If the start slips more than 14 days past the original notice, request again. We make sure worn or moved marks are refreshed through Texas811 before work continues on a Pine Island job.
What affects the cost of a Pine Island directional bore near FM 359?
The route’s soil and utility crossings are major factors near FM 359: Pine Island has mapped sandy clay loam and marked lines must be exposed before the drill approaches. Highway, pavement, creek or drainage crossings, pits, backfill, pipe size and footage also shape the job. Mobilization from the Yukon yard matters because Pine Island is 433 road miles away.
Where the Pine Island facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Pine Island
- U.S. Census Bureau, TIGER/Line 2024: Pine Island boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Pine Island
- U.S. Census Bureau, American Community Survey 2019 to 2023: Pine Island housing units and year built
- Macrostrat geologic map compilation: map units under Pine Island
- U.S. Department of Transportation, North American Rail Network: track owners in Waller County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Waller County
- U.S. Geological Survey, Elevation Point Query Service: Pine Island elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Pine Island
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Pine Island
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Pine Island, Texas
Type the address of your job in Pine Island. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Pine Island
Same county: Katy · Brookshire. All counties: Texas county list.
