Rankin Texas Directional Boring: Reagan Soil, US 67 And Texas Pacifico
Quick Answer: Can a line pass under US 67 or the Texas Pacifico track without cutting the surface? Yes, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Rankin, Texas, for crossings such as US 67. Rankin is 482 road miles from our Yukon, Oklahoma main office, and Texas Pacifico’s track also shapes crossing plans. The USDA soil survey maps Reagan loam, with clay loam at 40 inches, so sticky cuttings and pipe grip can affect the bore.
Rankin bores at a glance
- County seat of Upton County, Texas. Population 736 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 482 miles, about 9.3 hours of driving.
- Ground: Reagan soil is mapped on 77 percent of the area, with clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 15 percent of the area.
- Highways inside the boundary: US 67, Spur 576 and Texas State Highway 329. State permit office: TxDOT Odessa District.
- Railroad track inside the boundary: Texas Pacifico, with 4 mapped street and rail crossings.
- Public water: City of Rankin, groundwater bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in Rankin, Upton County?
Trinity takes directional boring jobs in Rankin, Upton County, including lines routed beneath US 67 and Railroad Avenue. Can you get a line under a road, track or creek without cutting the surface? Yes, we plan bores to leave those surfaces uncut. The Census Bureau Vintage 2024 estimate puts Rankin at 736 people. We install water, sewer, gas, electric conduit and fiber for routes such as a service along 12th Avenue.
Our main office is in Yukon, Oklahoma, and Rankin work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965 and has drilled directionally since 1982, including work suited to Rankin’s US 67 routes. We handle 3/4 inch service lines through 48 inch casing and bores from 10 feet to 5,000 feet, useful for projects from Railroad Avenue to highway crossings.

How do Reagan and Rankin conditions shape a bore?
The USDA soil survey maps Reagan soil across 77 percent of Rankin, with loam as the surface texture across 80 percent of the city. At about 40 inches, clay loam is mapped under 77 percent, and the average clay content at that depth is 37 percent. That clay can cling to the reamer and grip the pipe, so a bore near 12th Avenue needs controlled fluid and staged reaming. The survey maps no sandy area at that depth, so loose sand is not the mapped concern.
| USDA soil survey, inside the Rankin city limits | What is mapped |
|---|---|
| Soil series mapped | Reagan 77 percent, Lozier 15 percent, Iraan 5 percent and Conger 3 percent |
| Texture at the surface | loam 80 percent, very gravelly loam 15 percent and silty clay loam 5 percent |
| Texture about 40 inches down | clay loam 77 percent, bedrock 15 percent and silty clay loam 5 percent |
| Engineering class about 40 inches down | lean clay (CL) 85 percent |
| Average clay content about 40 inches down | 37 percent |
| Bedrock mapped within 60 inches | 15 percent of the area (15 percent hard rock, 0 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 5 percent of the area |
| High corrosion risk for uncoated steel | 5 percent of the area |
The USDA soil survey maps bedrock within five feet across 15 percent of Rankin, and that mapped bedrock is hard; weathered bedrock is not mapped within that depth. Seasonal water tables are not mapped within five feet, while flood prone soils cover 5 percent. High steel corrosion risk is mapped across 5 percent, a point for the line owner to consider for casing or tracer wire. The mapped Maxon sandstone and Glen Rose limestone, undivided, is Albian in age, so plans should allow for the possibility of harder material.
What does it take to bore Rankin clay loam?
Reagan soil and clay loam mapped about 40 inches down call for a controlled fluid plan in Rankin, with staged reaming and a same day pull where clay grips the pipe.
- In Reagan clay loam, we use a thinner fluid mix and polymer, then open the bore in stages so sticky cuttings do not build up on the reamer.
- Because heavy clay is mapped under much of Rankin, we watch fluid returns near pavement and pull pipe the same day the final opening is made.
- Before a drill approaches a marked line on 12th Avenue, we hydrovac pothole it to check its depth; surface paint only shows its position.
- We track the drill head from the surface and log depth and pitch, with extra attention where mapped hard bedrock could affect steering.

Where might a Rankin line go under US 67?
A bore in Rankin can be planned beneath US 67, which has 1.4 mapped roadway miles inside the city, or beneath its local streets. Spur 576 accounts for 0.7 roadway miles and Texas State Highway 329 for 0.3. Railroad Avenue is the longest named street at 1.26 miles, followed by 10th Avenue at 0.85 and 12th Avenue at 0.81. A route on any of these streets needs its own utility checks and bore layout, especially where pavement or driveways would otherwise be cut.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 67 | US highway | 1.4 roadway miles inside | State highway office |
| Spur 576 | State highway | 0.7 roadway miles inside | State highway office |
| Texas State Highway 329 | State highway | 0.3 roadway miles inside | State highway office |
| Texas Pacifico | Railroad | 1.84 track miles inside | The railroad |
Texas Pacifico has 1.84 track miles inside Rankin, and public mapping shows 4 street and rail crossings in the city. A rail route needs coordination with the track owner. No named streams or lakes are mapped inside Rankin, but 0.35 miles of unnamed drainage is mapped. No street crossings of named streams are mapped, so a proposed route near drainage still needs its actual path reviewed.
Whose permission does a Rankin bore under Texas Pacifico need?
For a bore under US 67, the utility owner applies for the TxDOT right of way permit through RULIS, and the TxDOT Odessa District reviews it; we prepare the bore plan and profile for that filing. TxDOT rules call for boring or tunneling below existing highway pavement, with the bore extending beneath all travel lanes on rural highways. The utility owner, not the drilling contractor, submits the application. A crossing of Texas Pacifico track needs an agreement with the railroad owner that sets the crossing conditions. Rankin city streets belong to the city itself.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are near Rankin’s City of Rankin water system?
The City of Rankin public water system uses purchased groundwater and reports 629 service connections serving 846 people. That system gives a local reference point when planning water work, but the specific line still needs to be identified before a bore near Railroad Avenue. AEP Texas North, Oncor Electric Delivery Company and Southwest Texas Electric Cooperative report electric service in Upton County. We confirm the line owner for the address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Rankin | Public water system | Groundwater bought from another system | 629 connections, 846 people served |
| AEP Texas North, Oncor Electric Delivery Company and Southwest Texas Electric Cooperative | Electric utilities reporting service in Upton County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Rankin’s median housing year at 1960; 52 percent of homes were built before 1960, 40 percent from 1960 to 1999 and 8 percent in 2000 or later. That mix can mean a route serves an older line replacement or a newer service. Before drilling near a marked utility on 11th Avenue, we expose it with hydrovac potholing; paint shows position, not depth.

Do you cover Rankin and nearby Iraan?
Rankin is the incorporated county seat of Upton County, at an elevation of 2,534 feet across 1.06 square miles. Its ZIP code is 79778. McCamey is 17.8 miles west, Iraan is 21.7 miles south, Crane is 26.8 miles northwest and Big Lake is 28.8 miles east. From our Yukon, Oklahoma main office, we plan for the 482 road miles and 9.3 hour drive to Rankin. Those distances matter when a project needs equipment and crew mobilization beyond the local route.
Places near Rankin
- Directional boring in McCamey: 17.8 miles west
- Directional boring in Iraan: 21.7 miles south
- Directional boring in Crane: 26.8 miles northwest
- Directional boring in Big Lake: 28.8 miles east
- Directional boring in Sheffield: 37.9 miles south
What would we bore near Rankin’s 12th Avenue?
- Highway crossing: A line beneath US 67 can pass below the pavement instead of cutting across its mapped roadway.
- Rail crossing: A utility route beneath Texas Pacifico track needs an owner agreement and a crossing plan for the 1.84 track miles in Rankin.
- Water service: A connection near the City of Rankin system can be routed beneath a street to avoid opening the surface.
- Street crossing: A bore beneath Railroad Avenue can keep its pavement intact while carrying water, sewer, gas, conduit or fiber.
- Conduit route: Electric or fiber conduit near 12th Avenue needs marked utilities exposed before the drill approaches them.
- Drainage route: A proposed line near Rankin’s mapped unnamed drainage needs a route plan that accounts for the drainage path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Rankin bore near Railroad Avenue?
For a quote near Railroad Avenue, start with the address or a map pin, then tell us what will go underground, such as a water line by the City of Rankin system. Include pipe or conduit size and estimated footage, whether the route is along 12th Avenue or beneath US 67, and a sketch or plans if available. Those details let us see the proposed crossing and access points.
The job route and scope set the price. A straightforward service near Railroad Avenue is different from a crossing beneath US 67 or Texas Pacifico track. We consider bore length, pipe or conduit size, Reagan clay loam or hard material, marked utilities to expose, pavement, drainage, pits and excavator time. Rankin’s 482 road miles from Yukon also affect mobilization. For Rankin’s high profile or emergency work, we plan for added demands before boring begins.
Questions people ask about boring in Rankin
Does Trinity take directional boring work in Rankin and Upton County?
Yes, we take directional boring work in Rankin, Upton County, and staff it with our crews or crews from partner drilling contractors we have vetted. You work with Trinity through the project, including the bore log. For a route near US 67, send the location and what line the bore will carry.
Could a Rankin bore hit rock near Reagan soil?
Rock is mapped within five feet in 15 percent of Rankin, and that mapped bedrock is hard rather than weathered. The USDA soil survey also maps the Maxon sandstone and Glen Rose limestone, undivided, in the area. A route near Reagan soil still needs planning for the ground it actually encounters.
Who approves a Rankin bore beneath US 67?
The utility owner files for the US 67 right of way permit in TxDOT’s RULIS system, and the TxDOT Odessa District reviews it. We prepare the bore plan and profile for the owner’s application. TxDOT requires boring or tunneling beneath existing highway pavement, so the crossing plan must account for the travel lanes.
What does a Rankin bore under Texas Pacifico require?
Texas Pacifico owns the track in Rankin, with 1.84 track miles inside the city. A planned bore beneath that railroad needs an agreement with the track owner. The agreement sets crossing conditions such as casing, depth and flagging, so the route and installation plan need to be reviewed before work.
Who runs Rankin’s public water system, and where does its water come from?
The City of Rankin owns and runs the public water system, which uses purchased groundwater. Public records list 629 service connections and 846 people served in Rankin, helping us scope underground work. If you are planning a new line near Railroad Avenue, the nearby system is useful context, but the line serving the specific address still needs to be confirmed.
Which electric line owner should I check for a Rankin job in Upton County?
AEP Texas North, Oncor Electric Delivery Company and Southwest Texas Electric Cooperative report electric service in Upton County. Those reports do not identify the provider at every Rankin address. Confirm the line owner and conduit specifications for the planned route before setting a bore near 12th Avenue.
What bore sizes and lengths can Trinity handle near Rankin’s 11th Avenue?
For a job near 11th Avenue, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The right size and length depend on what the route needs to carry and the crossing conditions along the street.
How much 811 notice do I need for a Rankin bore near Railroad Avenue?
For a bore near Railroad Avenue, contact Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If Rankin’s start slips more than 14 days past the original notice, we submit a new request. Before work continues in Rankin, we have worn or moved marks refreshed through Texas811.
What affects the cost of a Rankin directional bore under US 67?
A US 67 bore is priced around its scope: length, pipe or conduit size, Reagan soil or hard ground, utilities to expose, pavement, pits and excavator time. A crossing beneath the highway can take more planning than a short street run. Rankin’s 482 road miles from Yukon also affect mobilization.
Where the Rankin facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Rankin
- U.S. Census Bureau, TIGER/Line 2024: Rankin boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Rankin
- U.S. Census Bureau, American Community Survey 2019 to 2023: Rankin housing units and year built
- Macrostrat geologic map compilation: map units under Rankin
- U.S. EPA Safe Drinking Water Information System: public water systems serving Rankin
- U.S. Department of Transportation, North American Rail Network: track owners in Upton County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Upton County
- U.S. Geological Survey, Elevation Point Query Service: Rankin elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Rankin
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Rankin
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Rankin, Texas
Type the address of your job in Rankin. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Rankin
All counties: Texas county list.
