Austwell Texas Directional Boring: Victoria Clay, FM 774 and Haynes Bay

Quick Answer: Victoria clay dominates Austwell and can grip the reamer as it swells around a pipe. Along FM 774, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for lines that need to pass beneath pavement. Main Street lies 541 road miles from our Yukon, Oklahoma main office, so mobilization is part of planning. Heavy clay holds an open hole, but its sticky cuttings call for staged reaming and attention to fluid returns in Austwell.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Austwell bores at a glance

  • Incorporated city in Refugio County, Texas. Population 114 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 541 miles, about 10.9 hours of driving.
  • Ground: Victoria soil is mapped on 94 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 774 and Texas State Highway 239. State permit office: TxDOT Corpus Christi District.
  • Railroad track inside the boundary: none mapped.
  • Public water: City of Austwell, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring on Austwell Main Street?

Trinity Boring Solutions takes directional boring work in Austwell, where Victoria clay can grip a reamer and pipe. The Census Bureau Vintage 2024 estimate puts the city population at 114, all in Refugio County. We install water, sewer, gas, electric conduit and fiber lines beneath streets such as Main Street and McDowell Street, with the route planned for the service and the marked utilities.

Our main office is in Yukon, Oklahoma, and Austwell work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught us to account for Austwell’s sticky Victoria clay when choosing ream stages and pull timing. The family business began in 1965, and that ground focused experience informs the work we plan for streets such as Proctor Street.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

How does Victoria soil affect drilling in Austwell?

Victoria soil covers most of Austwell, and the USDA soil survey maps the Victoria series across 94% of the city. The mapped surface texture is clay throughout, and clay also accounts for all soil mapped at about 40 inches below the surface. Victoria clay map units cover 71% of the area, with a lower Victoria clay unit covering another 22%. The survey estimates average clay content at that depth at 60%. These mapped patterns point to sticky cuttings that can cling to the reamer, not test borings at a proposed Main Street route.

USDA soil survey, inside the Austwell city limitsWhat is mapped
Soil series mappedVictoria 94 percent and Monteola 4 percent
Texture at the surfaceclay 100 percent
Texture about 40 inches downclay 100 percent
Engineering class about 40 inches downfat clay (CH) 100 percent
Average clay content about 40 inches down60 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches2 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel100 percent of the area

The USDA soil survey does not map bedrock within the top five feet of Austwell, but that does not rule out deeper rock. Seasonal water table and flood prone soils are each mapped under 2% of the area, while high steel corrosion risk covers 100%. The geologic map identifies the Pleistocene Beaumont Formation, predominantly clay, and Late Pleistocene Delta Silt And Clay. Clay calls for staged reaming and watched fluid returns; the line owner should consider steel casing and tracer wire materials for the mapped corrosion risk.

How do we run a bore through Austwell clay?

In Austwell, we plan a directional bore around Victoria clay and the route’s marked utilities, then track the drill head from the surface as it advances beneath a street such as Main Street.

  1. Victoria clay is sticky and may swell against pipe, so we use a thinner fluid blend, open the bore in stages and pull the line the same day.
  2. On an FM 774 route, we watch fluid returns closely in heavy clay so pressure does not lift the highway pavement.
  3. Before the drill approaches a marked utility along McDowell Street, we expose it with hydrovac; paint shows its position, not its depth.
  4. For a Main Street bore, a walkover locator tracks the drill head and records depth and pitch; pits stay in dirt so pavement remains uncut.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Which roads, tracks or creeks could a bore cross in Austwell near FM 774?

Austwell bores may pass beneath FM 774 or Texas State Highway 239, the two state highways mapped inside the city. FM 774 has 0.5 mapped roadway miles in town, and Texas State Highway 239 has 0.2. Main Street, McDowell Street, Proctor Street and Vandenberge Street are each mapped for 0.55 miles, making them useful route references for a proposed crossing. Boring can keep pavement and driveways intact, with entry and exit pits placed in dirt where the route allows.

CrossingTypeMapped extentWho has a say
FM 774State highway0.5 roadway miles insideState highway office
Texas State Highway 239State highway0.2 roadway miles insideState highway office
Haynes BayLake or pond7,881 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Austwell or within one mile, and the mapped street and rail crossing inventory shows none in the city. No streams are mapped inside or within one mile either. Haynes Bay is different: the 7,881 acre lake lies inside the city, so a proposed lake crossing would need a jurisdiction check during planning. A route under Gisler Street or near Haynes Bay still needs its own utility and access review.

Who signs off on a bore in Austwell and Refugio County?

A bore along a city street such as Main Street is a city street matter, while work in the right of way of FM 774 or Texas State Highway 239 needs a TxDOT utility permit. At highway crossings, the required cover is at least 60 inches for electric and communication lines and water lines, and 60 inches for pressurized sewer lines; the permit may set another depth. The utility owner submits the application through TxDOT’s RULIS system, reviewed by the Corpus Christi District, and we prepare the bore plan and profile for that filing. No railroad is mapped in Austwell; a proposed crossing of Haynes Bay is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities are in the ground near the City of Austwell system?

The City of Austwell public water system uses groundwater wells and lists 150 service connections serving 147 people. For an electric conduit bore in Refugio County, public records identify AEP Texas Central, San Patricio Electric Cooperative and Victoria Electric Cooperative as utilities reporting service. We confirm the line owner for the specific Austwell route before planning a conduit bore, rather than assuming one provider serves every address.

Line ownerWhat it isSourceSize
City of AustwellPublic water systemGroundwater wells150 connections, 147 people served
AEP Texas Central, San Patricio Electric Cooperative and Victoria Electric CooperativeElectric utilities reporting service in Refugio CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Austwell’s median housing year at 1968; 39% of homes were built before 1960, 45% from 1960 to 1999 and 16% in 2000 or later. That mix can mean a replacement route near McDowell Street differs from a new service connection. Before drilling near any marked line, we expose it with hydrovac; for a proposed crossing under McDowell Street, the marks alone do not show burial depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Austwell and nearby Tivoli?

Austwell is in Refugio County, covers 0.36 square miles and sits 24 feet above sea level. We confirm ZIP code 77950 serves Austwell in Refugio County, helping us plan underground work for the area. Tivoli is 5.6 miles northwest, and Seadrift is 7.9 miles east; Port Lavaca is the nearest larger city, 20.4 miles northeast. Refugio, the county seat, is 26.9 miles west. From our Yukon yard, the drive to Austwell is 541 road miles and 10.9 hours, which is part of planning crew and equipment mobilization for a Main Street bore.

Places near Austwell

Which jobs call for a bore near Austwell Proctor Street?

  • Highway crossing: A water or communication line beneath FM 774 needs a planned bore route, the required cover and a TxDOT utility permit.
  • Street service: A new water or sewer connection beneath McDowell Street can avoid opening the paved route when access allows pits in dirt.
  • Fiber route: A conduit bore beneath Main Street can carry fiber while keeping the street surface intact.
  • Water system work: A service connection near the City of Austwell groundwater system needs the line owner and existing utilities confirmed first.
  • Lake crossing: A proposed line route near Haynes Bay calls for checking Corps jurisdiction during planning.
  • Street replacement: A replacement line beneath Proctor Street needs marked utilities exposed before the drill approaches their route.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a directional boring quote for Austwell Main Street?

For a Main Street quote, send the Austwell address or map pin, what will go in the ground, the pipe or conduit size and footage; a sketch or plans help. Include the route’s relation to FM 774, nearby pavement and any known marked utilities. Those details help us scope access and the crossing before choosing a bore approach.

A short route through Victoria clay with clear access may be simpler to plan than a longer bore with several utility crossings. Price also reflects pipe or conduit size, soil conditions, utilities to expose, concrete or pavement, pits, excavator time, backfill and any creek or drainage crossing. For Austwell, the sticky clay, a crossing under FM 774 and the 541 road miles from Yukon can each change equipment, planning or mobilization needs. Urgent or high profile work can also affect the scope.

Questions people ask about boring in Austwell

Does Trinity Boring Solutions take directional boring jobs in Austwell and Refugio County?

Yes. We take directional boring work in Austwell and staff it with our own crews or crews from satellite yards operated by drilling contractors we have vetted. You work with Trinity through the bore log, whichever crew is at the site. Victoria clay is one local ground condition we account for when planning the route.

How old are Austwell homes and buried lines near McDowell Street?

The American Community Survey 2019 to 2023 estimates give Austwell a median housing year of 1968, but they do not establish the age of buried lines near McDowell Street. Older homes can mean a replacement bore; a new service has a different route and tie in. We check marked utilities before drilling near them.

Can Austwell Victoria soil corrode steel, and what pipe can we use?

The USDA soil survey maps high steel corrosion risk across 100% of Austwell, including Victoria soil. The line owner should weigh casing and tracer wire materials and select any coating. We account for Victoria and Monteola soil series; HDPE is not subject to that soil corrosion concern in Austwell. The right choice depends on the line and project requirements near a street such as Proctor Street.

What ground does a bore pass through in Austwell Victoria soil?

The USDA soil survey maps Victoria clay across 94% of Austwell, with clay throughout the mapped surface and at about 40 inches below ground. It estimates average clay content at that depth at 60%, and the soil is mapped as CH. That suggests sticky cuttings and a need for staged reaming along routes such as Main Street.

Will a directional bore near FM 774 in Austwell hit rock?

Bedrock is not mapped in Austwell’s top five feet, which does not rule out deeper rock. The geologic map shows the Pleistocene Beaumont Formation, predominantly clay, and Late Pleistocene Delta Silt And Clay. A proposed route near FM 774 still needs site specific planning rather than an assumption about deeper material.

Who approves a bore beneath FM 774 in Austwell?

The line owning utility applies for a TxDOT utility permit through RULIS for work in the FM 774 right of way. TxDOT’s Corpus Christi District reviews it, and we prepare the bore plan and profile for the utility’s application. The permit sets the required crossing details for the Austwell route.

Can I reach Trinity after hours about an urgent bore on Proctor Street in Austwell?

Yes. We have a person answering Trinity’s phone 24 hours a day at (405) 409-7423 for Austwell work near Haynes Bay. Tell us where the urgent work is on Proctor Street, what line needs to go in and what is known about the route, so we can understand the Austwell scope.

How early should I call Texas811 for a bore on Main Street in Austwell?

For a Main Street bore, request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For a crossing of Texas State Highway 239, if the start slips more than 14 days past the original notice, we submit a new request. Before continuing work near Bay Street, we have worn or moved marks refreshed through Texas811.

What affects the price of a directional bore under FM 774 in Austwell?

The route length, pipe or conduit size, Victoria clay, utilities to expose, pavement, pits and backfill all affect the scope. A bore under FM 774 also needs highway permit planning, and the 541 road miles from Yukon affect mobilization. We assess those details for the particular Austwell route rather than using one factor alone.

Where the Austwell facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Austwell

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Austwell, Texas

Type the address of your job in Austwell. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.