trinityboringsolutions.com

Center Texas Directional Boring: Eastwood Soil, Stonedive Creek and BNSF Railway

Quick Answer: City of Center owns the water system; Shelby County electric reports name three providers, so we verify line ownership before a Stonedive Creek bore. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for work crossing US 96 or Loop 500 in Center, Texas. The Yukon yard is 404 road miles away, a distance that matters for a bore near Shelbyville Street. Eastwood soil covers 54 percent of mapped ground, and clay around 40 inches down can cling to a reamer and pipe.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Center bores at a glance

  • County seat of Shelby County, Texas. Population 5,231 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 404 miles, about 7.9 hours of driving.
  • Ground: Eastwood soil is mapped on 54 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 7 percent of the area.
  • Highways inside the boundary: US 96, Loop 500, Texas State Highway 7, Texas State Highway 87 and FM 138. State permit office: TxDOT Lufkin District.
  • Railroad track inside the boundary: BNSF Railway, with 9 mapped street and rail crossings.
  • Named streams inside the boundary: Stonedive Creek, Cedar Creek and Jones Branch.
  • Public water: City of Center, surface water.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring in Center near Stonedive Creek?

Trinity Boring Solutions takes directional boring work in Center, where the City of Center owns the water system and Shelby County electric reports list three providers; we confirm the line owner before setting a route. The Census Bureau Vintage 2024 estimate puts Center at 5,231 people. We install water, sewer, gas, electric conduit and fiber, routing a service from Loop 500 or across a Stonedive Creek approach as the plans require.

Our main office is in Yukon, Oklahoma, and Center work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore reached roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa; a bore near Hurst Street is a smaller local scope by comparison. We began as a family business in 1965 and have drilled directionally since 1982, experience we bring to Center routes.

Aerial view of a Trinity Boring Solutions directional drill set up for a gas line bore at a commercial site
Our directional drill set up for a gas line bore at a commercial site, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What is Eastwood soil like to bore in Center?

The USDA soil survey maps Eastwood soil across 54 percent of Center, led by very fine sandy loam map units on 5 to 20 percent and 1 to 5 percent slopes. At about 40 inches below the surface, the mapped texture is clay across 48 percent, clay loam across 39 percent and sandy clay loam across 13 percent; average clay content there is 37 percent. The surface layer is mostly very fine sandy loam, but that does not describe the deeper material. These are mapped patterns, not test borings, so a route near Eastwood ground still needs site specific planning.

USDA soil survey, inside the Center city limitsWhat is mapped
Soil series mappedEastwood 54 percent, Metcalf 15 percent, Hallsummit 12 percent, Laneville 9 percent and Kirvin 5 percent
Texture at the surfacevery fine sandy loam 69 percent, fine sandy loam 21 percent and silt loam 6 percent
Texture about 40 inches downclay 48 percent, clay loam 39 percent and sandy clay loam 13 percent
Engineering class about 40 inches downlean clay (CL) 52 percent and fat clay (CH) 48 percent
Average clay content about 40 inches down37 percent
Bedrock mapped within 60 inches7 percent of the area (0 percent hard rock, 7 percent weathered rock)
Seasonal water table within 60 inches28 percent of the area
Flood prone soils9 percent of the area
High corrosion risk for uncoated steel39 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches across 7 percent of Center, with typical bedrock depth at 43 inches; hard bedrock is not mapped at that depth. Seasonal water tables are mapped within 60 inches across 28 percent, and flood prone soils across 9 percent, so pits and creek routes may need water and channel planning. High steel corrosion risk covers 39 percent. The Wilcox Group, undivided, is mapped as Paleogene and includes mudstone and sandstone; changing ground can slow the bore or affect steering.

How do crews bore through clay in Center?

In Center, mapped clay calls for controlled fluid and staged reaming, not a fast pull through the hole. Eastwood ground and the route beside Stonedive Creek help set the plan.

  1. In Eastwood clay, we use thinner drilling fluid and polymer, then ream in stages so sticky cuttings do not build on the reamer.
  2. Where the mapped clay is heavy, we watch fluid returns near Loop 500 pavement and keep pressure controlled to reduce the chance of lifting the surface.
  3. At Stonedive Creek, we plan the bore depth beneath the channel and check the crossing for U.S. Army Corps of Engineers jurisdiction.
  4. Where seasonal water tables are mapped around Center, we keep pits small and pump collected water; the walkover locator tracks depth and pitch.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

Which BNSF Railway tracks could a bore cross near Center?

Center bores may meet US 96, Loop 500, Texas State Highway 7 or Texas State Highway 87, all mapped inside city limits. Loop 500 has 5.1 roadway miles in Center, while US 96 has 3.9. Among named streets, Loop 500, Shelbyville Street and Hurst Street are the longest, with Nacogdoches Street also extending through the city. A route crossing pavement or a driveway can be bored rather than opened, with the entry and receiving pits placed off the paved surface when the site allows.

CrossingTypeMapped extentWho has a say
US 96US highway3.9 roadway miles insideState highway office
Loop 500State highway5.1 roadway miles insideState highway office
Texas State Highway 7State highway3.7 roadway miles insideState highway office
Texas State Highway 87State highway3.6 roadway miles insideState highway office
FM 138State highway1.2 roadway miles insideState highway office
FM 699State highway1.1 roadway miles insideState highway office
FM 2468State highway0.7 roadway miles insideState highway office
FM 2788State highway0.6 roadway miles insideState highway office
FM 2974State highway0.3 roadway miles insideState highway office
FM 2794State highway0.1 roadway miles insideState highway office
BNSF RailwayRailroad3.01 track miles insideThe railroad
Stonedive CreekStream0.64 channel miles insideChecked for Corps of Engineers jurisdiction
Cedar CreekStream0.32 channel miles insideChecked for Corps of Engineers jurisdiction
Jones BranchStream0.3 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway has 3.01 track miles inside Center, and public mapping shows 9 street and rail crossings in the city. A track crossing needs an agreement with BNSF Railway, with its conditions guiding the crossing plan. Stonedive Creek runs 0.64 channel miles inside the limits; Cedar Creek and Jones Branch are also mapped streams. Public records show 1 mapped street crossing of a named stream. A creek route is checked for federal waterway jurisdiction during planning.

Who approves a Center bore under US 96?

For a Center bore beneath US 96 or another state highway, the utility owner applies for the TxDOT utility permit through RULIS, and the TxDOT Lufkin District reviews it; we prepare the bore plan and profile for the owner’s application. Electric and communication crossings need 60 inches of cover below the lowest crossed grade, and water or pressurized sewer crossings also need 60 inches. For TxDOT work, we bore or tunnel beneath existing highway pavement as required. Center is incorporated, so city streets such as Hurst Street belong to the city. A BNSF Railway track crossing requires the railroad’s agreement, and Stonedive Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near the City of Center system?

The City of Center public water system uses surface water and reports 2,917 service connections serving 5,450 people. For electric service in Shelby County, utilities reporting service are Southwestern Electric Power, Deep East Texas Electric Cooperative and Rusk County Electric Cooperative. Those county reports do not identify the provider at each address. We confirm the line owner before planning conduit near the City of Center system or along Loop 500.

Line ownerWhat it isSourceSize
City of CenterPublic water systemSurface water2,917 connections, 5,450 people served
Southwestern Electric Power, Deep East Texas Electric Cooperative and Rusk County Electric CooperativeElectric utilities reporting service in Shelby CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Center’s median housing year at 1982; 11 percent of homes were built before 1960, 71 percent from 1960 to 1999 and 18 percent in 2000 or later. A replacement route near Shelbyville Street may meet older buried lines, while a new service calls for its own route check. On Center bore paths, we hydrovac pothole each marked utility before drilling near it. For example, a planned line under Hurst Street needs marked lines exposed first because paint shows position, not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

How far is Center from Shelbyville and the Yukon yard?

Center is the Shelby County seat in East Texas, at 348 feet elevation across 7.99 square miles, with ZIP code 75935. Shelbyville is 6.5 miles east; Tenaha is 11.1 miles north, Joaquin is 14.2 miles northeast and Timpson is 15.0 miles northwest. Nacogdoches, the nearest larger city, is 30.4 miles southwest. For a bore in Center, the Yukon yard is 404 road miles away and the drive is 7.9 hours, which affects mobilization and how equipment is scheduled for a route near US 96.

Places near Center

What boring work comes up near Hurst Street in Center?

  • Highway crossing: A bore beneath US 96 needs a planned path and pits clear of pavement, with the utility owner handling the TxDOT permit.
  • Water service: A connection near the City of Center system can be routed around marked lines before reaching a home or service point.
  • Fiber conduit: A route along Loop 500 can pass below pavement and driveways without cutting the street surface.
  • Creek crossing: A line beneath Stonedive Creek needs depth planning under the channel and a jurisdiction check during planning.
  • Rail crossing: A bore beneath BNSF Railway track needs the railroad agreement to set crossing details for the proposed line.
  • Street replacement: A route near Hurst Street can replace a buried line with pits on dirt at each end instead of opening the pavement.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Center bore near Loop 500?

For a Center quote, start with the address or map pin, such as a route near Loop 500, then tell us what goes in the ground. Give the pipe or conduit size and footage; a sketch or plans help show where the bore meets Hurst Street or a marked utility. That lets us review the route, access and crossing details before setting the work scope.

The price follows the work involved: ground conditions, line size and length, exposed utilities, pavement, creek crossings, pits, excavator time, backfill and mobilization. Eastwood clay can call for staged reaming, while a route under US 96 or BNSF Railway adds crossing coordination. Stonedive Creek may add channel planning, and Center’s 404 road miles from Yukon affect equipment travel. High profile or emergency work can also change the crew and schedule needed.

Questions people ask about boring in Center

Does Trinity take directional boring jobs in Center and Shelby County?

Yes, we take directional boring work in Center and across Texas. Our own crews handle jobs, and partner drilling contractors from satellite yards we have vetted can also staff the work. We stay involved from the first call through the bore log, whether the route is near Loop 500 or Stonedive Creek.

Can a line be bored under Stonedive Creek in Center?

A line can be planned beneath Stonedive Creek, which runs 0.64 channel miles inside Center. The route needs enough depth to pass below the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Site conditions and the line’s route determine the bore design.

Who runs Center’s public water system, and where does its water come from?

The City of Center owns and operates the public water system, which uses surface water. Center’s public records show 2,917 service connections serving 5,450 people, a scale we account for when planning underground work. For a bore near that system, the specific line and its location still need to be confirmed before we set the route.

Which electric line owner should I confirm in Center and Shelby County?

Confirm the owner for the specific address before planning an electric conduit bore. Southwestern Electric Power, Deep East Texas Electric Cooperative and Rusk County Electric Cooperative report electric service in Shelby County, but those reports do not establish which one serves a particular Center property near Hurst Street.

Who controls Hurst Street in Center, and does a bore require cutting it?

Hurst Street is a city street because Center is incorporated. A directional bore can pass below pavement without cutting the street, with pits placed in dirt on each side where the site allows. The route still needs utility locating and any applicable city coordination before work begins.

How do Center home ages and Shelbyville Street affect a replacement bore?

Center’s median housing year is 1982, and the American Community Survey 2019 to 2023 estimates show 11 percent of homes were built before 1960. Older streets such as Shelbyville Street can have lines to verify before a replacement route is chosen. Before drilling near marked utilities in Center, we expose them along the planned bore path.

How far is Center from the Yukon office, and does Nacogdoches change the job?

From our Yukon, Oklahoma main office, Center is 404 road miles away and a 7.9 hour drive for project planning. Nacogdoches is 30.4 miles southwest of Center, but the Yukon distance is what affects crew and equipment mobilization. For work near US 96, the route and crossing needs also shape scheduling.

How much notice does Texas811 need for a bore near Loop 500 in Center?

For a bore near Loop 500, request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start moves more than 14 days past the notice, make a new request. When marks in Center are worn or moved, we have them refreshed through Texas811 before work continues.

What affects the cost of directional boring under US 96 in Center?

The scope under US 96 depends on bore length and size, Eastwood ground, utilities that must be exposed, pavement, crossing conditions, pits, backfill and equipment time. A Stonedive Creek route or BNSF Railway crossing can add planning needs, and mobilization from Yukon is part of the job factors. We price the actual route and work requirements, not a single local rate.

Where the Center facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Center

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Center, Texas

Type the address of your job in Center. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Center

All counties: Texas county list.