trinityboringsolutions.com

Timpson Texas Directional Boring: Scottsville Soil, US 84 and Flat Fork Creek

Quick Answer: Along Railroad Avenue and US 84, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for lines routed beneath surfaces. Timpson is 389 road miles from our Yukon, Oklahoma main office, and Union Pacific track can shape crossing plans. The USDA soil survey maps Scottsville soil across 38 percent of the city and clay across 66 percent of mapped area at about 40 inches, so sticky cuttings call for staged reaming. Flat Fork Creek adds a channel to account for along a crossing route.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Timpson bores at a glance

  • Incorporated city in Shelby County, Texas. Population 1,002 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 389 miles, about 7.7 hours of driving.
  • Ground: Scottsville soil is mapped on 38 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 84, US 59, FM 947, Texas State Highway 87 and Spur 470. State permit office: TxDOT Lufkin District.
  • Railroad track inside the boundary: Union Pacific, with 11 mapped street and rail crossings.
  • Named streams inside the boundary: Flat Fork Creek.
  • Public water: City of Timpson, groundwater wells.
  • Electric: City of Timpson municipal electric system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near Flat Fork Creek in Timpson?

Trinity Boring Solutions takes directional boring work in Timpson, Shelby County, where the Census Bureau Vintage 2024 estimate puts the population at 1,002. Along Railroad Avenue or US 84, our crews can install water, sewer, gas, electric conduit and fiber by bore when the route and line design call for it.

Our main office is in Yukon, Oklahoma, and Timpson work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. From a 3/4 inch service line to a 48 inch casing, bore lengths range from 10 feet to 5,000 feet. Our family business started in 1965, and we have done directional boring since 1982; a route near 2nd Street could call for a short service bore or a longer crossing.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

How does Scottsville soil affect a bore in Timpson?

The USDA soil survey maps Scottsville soil across 38 percent of Timpson, Eastwood across 36 percent and Hallsummit across 16 percent. At about 40 inches below the surface, clay is the mapped texture in 66 percent of the area; average clay content at that depth is 40 percent. Surface soils are mostly very fine sandy loam, mapped across 74 percent, but that surface texture does not describe the deeper cuttings. For a bore near Railroad Avenue, clay can cling to the reamer and grip pipe.

USDA soil survey, inside the Timpson city limitsWhat is mapped
Soil series mappedScottsville 38 percent, Eastwood 36 percent, Hallsummit 16 percent, Metcalf 4 percent and Laneville 3 percent
Texture at the surfacevery fine sandy loam 74 percent, fine sandy loam 18 percent and silt loam 8 percent
Texture about 40 inches downclay 66 percent, sandy clay loam 16 percent and clay loam 12 percent
Engineering class about 40 inches downfat clay (CH) 64 percent and lean clay (CL) 34 percent
Average clay content about 40 inches down40 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches48 percent of the area
Flood prone soils5 percent of the area
High corrosion risk for uncoated steel47 percent of the area

USDA mapping shows bedrock is not mapped in the top five feet of Timpson, though that does not rule out deeper rock. A seasonal water table is mapped within 60 inches across 48 percent of the area, so pits near Flat Fork Creek may need pumping. Flood prone soils cover 5 percent, calling for a channel aware crossing plan. High steel corrosion risk is mapped across 47 percent; the line owner should consider casing and tracer wire materials. The Wilcox Group, undivided, is Paleogene and mostly mudstone with sand and other layers, which can change drilling response.

What drilling approach suits Timpson clay?

Timpson’s clay mapped at about 40 inches can stick to tooling and tighten around pipe. Near Railroad Avenue, we plan fluid and reaming so the hole stays workable without forcing returns toward pavement.

  1. We use a thinner drilling fluid with polymer in Timpson clay, then ream in stages so sticky cuttings do not build up on the tooling.
  2. Where heavy clay is mapped near Scottsville soil areas, we watch fluid returns and keep pressure controlled to reduce the chance of lifting pavement.
  3. With seasonal water table mapped within 60 inches across 48 percent of Timpson, we keep pits manageable and pump water when needed.
  4. Before drilling near a marked line on Railroad Avenue, we hydrovac expose it; a walkover locator tracks the head and records depth and pitch.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

What might a new line cross along Railroad Avenue in Timpson?

US 84 and US 59 each have mapped roadway miles inside Timpson, along with FM 947, Texas State Highway 87 and Spur 470. TxDOT records 3.8 roadway miles of US 84 and 3.6 of US 59 within the city limits. Railroad Avenue is the longest named street at 1.88 miles, followed by 1st Street at 1.75 miles and 2nd Street at 1.65 miles. A bore route needs to account for pavement, driveways and access along whichever street it follows.

CrossingTypeMapped extentWho has a say
US 84US highway3.8 roadway miles insideState highway office
US 59US highway3.6 roadway miles insideState highway office
FM 947State highway1 roadway miles insideState highway office
Texas State Highway 87State highway0.9 roadway miles insideState highway office
Spur 470State highway0.7 roadway miles insideState highway office
Union PacificRailroad2.53 track miles insideThe railroad
Flat Fork CreekStream0.18 channel miles insideChecked for Corps of Engineers jurisdiction
Blackwater CreekStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Ship CreekStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific owns 2.53 track miles inside Timpson, and public mapping shows 11 street and rail crossings in the city. Any track crossing needs the railroad’s agreement, which sets requirements such as casing, depth and flagging. Flat Fork Creek has 0.18 channel miles inside the limits, and one mapped street crossing intersects a named stream. The creek route needs to be assessed during planning; no lakes or ponds are mapped within one mile.

Who approves a bore under US 84 in Timpson?

For a Timpson bore crossing US 84, the cover depth helps set the profile: electric and communication lines need 60 inches beneath the lowest crossed grade, while water lines need 60 inches and pressurized sewer lines need 60 inches at crossings. The utility owner, not the drilling contractor, applies for the TxDOT utility permit through RULIS, and the TxDOT Lufkin District reviews it. We prepare the bore plan and profile for the owner’s application and work under its permit. Timpson’s city streets belong to the city, while a Union Pacific crossing also requires an agreement with the railroad. Flat Fork Creek crossings are checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines should we check in Shelby County around Timpson?

The City of Timpson public water system uses groundwater wells and reports 580 service connections serving 1,549 people. The city also owns its municipal electric system, which reported 725 customers to EIA. Before a conduit bore near the city water system or municipal electric lines, we use hydrovac potholing to expose marked utilities on the planned path; surface marks show position, not depth.

Line ownerWhat it isSourceSize
City of TimpsonPublic water systemGroundwater wells580 connections, 1,549 people served
City of Timpson municipal electric systemCity owned electric systemReports to the U.S. Energy Information Administration725 customers reported
Southwestern Electric Power, Deep East Texas Electric Cooperative and Rusk County Electric CooperativeElectric utilities reporting service in Shelby CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Timpson’s median housing year at 1976; 37 percent of homes were built before 1960, 52 percent from 1960 to 1999 and 11 percent in 2000 or later. That age range can mean a project replaces an older line or serves newer construction along streets such as Railroad Avenue. We pothole marked lines before drilling near them, including near the city water and electric systems.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

What places near Center can we serve from Timpson?

Timpson is an incorporated city in Shelby County, at an elevation of 391 feet and covering 2.51 square miles. ZIP code 75975 serves the city. Garrison is 8.0 miles southwest, Gary City is 8.5 miles north and Tenaha is 9.2 miles east; Center, the county seat and nearest larger city, is 15.0 miles southeast. From our Yukon, Oklahoma yard, Timpson is 389 road miles away and a 7.7 hour drive, which affects how we plan crew and equipment mobilization for a project near US 84.

Places near Timpson

What kinds of bores fit 2nd Street and Timpson?

  • Highway crossing: A US 84 bore can pass beneath pavement while its route and required cover are set in the TxDOT permit.
  • Water service: A connection from the City of Timpson system may need a bore from a service route toward a property.
  • Fiber conduit: A route along 2nd Street can keep new conduit below the street surface and avoid cutting the pavement.
  • Rail crossing: A Union Pacific track crossing needs the railroad’s agreement, with casing and depth addressed for the Timpson route.
  • Creek crossing: Flat Fork Creek has 0.18 channel miles in town, so the bore path must be planned around the channel.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send to price a bore near Railroad Street in Timpson?

For a Timpson quote, give us the street address or map pin, what goes underground, pipe or conduit size and footage; a sketch or plans help. A route near Railroad Street may involve street pavement or a nearby track crossing, so the proposed path and access points help define the work.

The drive from Yukon is 7.7 hours over 389 road miles, so mobilization matters for a Railroad Street project. Scottsville soil and deeper clay affect tooling and reaming; crossing US 84 or Union Pacific track adds planning for depth, access and approvals. We also account for line size and length, utilities that need exposure, pavement or concrete, creek or drainage crossings, pits, excavator time and backfill. Emergency or high profile work can add scope.

Questions people ask about boring in Timpson

Does Trinity take boring work in Timpson and how are Shelby County jobs staffed?

Yes, we take directional boring work in Timpson, Shelby County. Our crews handle the work, with partner contractor satellite yards available when needed. You coordinate with Trinity from the first call through the bore log, including a project along US 84.

What ground should I expect around Scottsville soil in Timpson?

The USDA soil survey maps Scottsville soil across 38 percent of Timpson, and clay is mapped across 66 percent of the area at about 40 inches below the surface. That clay can cling to the reamer and grip pipe, so the drilling plan may use staged reaming and adjusted fluid.

Is a Timpson bore likely to hit rock?

The USDA mapping for Timpson does not show bedrock in the top five feet, but deeper rock is still possible. The mapped Wilcox Group, undivided, is Paleogene and consists mostly of mudstone with sand and other layers. A route near Flat Fork Creek still needs to be planned for the ground actually encountered.

Who handles a Timpson permit for boring beneath US 84?

The utility owner applies for the TxDOT permit through RULIS, and the TxDOT Lufkin District reviews it. We prepare the bore plan and profile for the owner’s application. A US 84 crossing also needs its permitted cover depth and installation method reflected in the plan.

What does a Timpson bore beneath Union Pacific track require?

A crossing of the 2.53 Union Pacific track miles in Timpson needs an agreement from the railroad that owns the track. The agreement sets crossing conditions such as casing, depth and flagging. If the line also occupies highway right of way, TxDOT asks for a copy of the railroad agreement.

Can a line be bored below Flat Fork Creek in Timpson?

A bore below Flat Fork Creek can be considered, but its route and depth need planning around the channel. The creek has 0.18 channel miles inside Timpson, and water crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

How early should I request a Timpson locate for work on Railroad Avenue?

For a Railroad Avenue bore, Texas811 needs the locate request at least 48 hours before excavation begins, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the original notice, submit a new request; worn or moved marks need refreshing through Texas811 before work continues.

Does Timpson’s distance from Center affect a job from Yukon?

Center is 15.0 miles southeast of Timpson, while our Yukon, Oklahoma yard is 389 road miles away, a 7.7 hour drive. That distance can affect mobilization for work near US 59 or another Timpson route, alongside the project’s access and equipment needs.

What affects the price of a directional bore near US 84 in Timpson?

The job scope drives the price: length, pipe or conduit size, Timpson’s clay, and the number of utilities to expose all matter. A crossing under US 84 or Union Pacific track can add planning needs, as can concrete, Flat Fork Creek, pits, excavator time, backfill, emergency work and mobilization from Yukon.

Where the Timpson facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Timpson

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Timpson, Texas

Type the address of your job in Timpson. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Timpson

Same county: Joaquin · Huxley · Shelbyville. All counties: Texas county list.