trinityboringsolutions.com

Coyanosa Texas Directional Boring: Delnorte Soil, FM 1776 and Frank Street

Quick Answer: Coyanosa is an unincorporated community in Pecos County, and we do directional boring, also called horizontal directional drilling (HDD), for routes along FM 1776 and local streets. From our Yukon, Oklahoma main office, Coyanosa is 513 road miles away, with Frank Street among the local routes a bore plan may need to cross. The USDA soil survey maps Delnorte across the community, with extremely gravelly sandy loam about 40 inches down, so an open hole can cave and needs staged reaming.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Coyanosa bores at a glance

  • Unincorporated community in Pecos County, Texas. Population 155 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 513 miles, about 10.2 hours of driving.
  • Ground: Delnorte soil is mapped on 100 percent of the area, with extremely gravelly sandy loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 1776. State permit office: TxDOT Odessa District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring along Frank Street in Coyanosa?

Coyanosa is an unincorporated community in Pecos County, so its roads are county or state responsibility rather than streets under a city government. The Census Bureau counted 155 people in 2020; it does not publish yearly estimates for unincorporated places. Along Frank Street or FM 1776, we install water, sewer, gas, electric conduit and fiber lines by boring beneath the route rather than opening its surface.

Our main office is in Yukon, Oklahoma, and Coyanosa work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet of 48 inch pipe beneath the Arkansas River in Tulsa; next to that reach, a typical Coyanosa job is a shorter service or conduit route planned around Delnorte ground. We have been a family business since 1965 and have done directional boring since 1982.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is Coyanosa ground like in Delnorte soil?

The USDA soil survey maps Delnorte across Coyanosa, with very gravelly loam at the surface and extremely gravelly sandy loam at about 40 inches below it. That deeper material is mapped as gravelly soil, with 100 percent of the mapped area sandy and 100 percent gravelly at that depth; average clay content is 12 percent. For Delnorte soils, we treat mapped patterns as planning guidance, not as test borings for a Coyanosa crossing. Gravelly ground generally cuts readily but can fall in behind the drill head, so the soil map points to a need for fluid support and staged reaming.

USDA soil survey, inside the Coyanosa mapped community boundaryWhat is mapped
Soil series mappedDelnorte 100 percent
Texture at the surfacevery gravelly loam 100 percent
Texture about 40 inches downextremely gravelly sandy loam 100 percent
Engineering class about 40 inches downclayey gravel (GC) 100 percent
Average clay content about 40 inches down12 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

Bedrock is not mapped within the top five feet in Coyanosa, but that does not rule out rock at greater depth. Seasonal water table and flood prone soils are not mapped, and high steel corrosion risk is not mapped either. The map shows alluvium of Holocene age and Cenozoic sedimentary rocks of Paleocene age. Gravel in the Delnorte profile can still shift the drill head, so we track depth and pitch as each rod advances; a site check is needed for conditions below the mapped profile.

How is a bore run through Coyanosa extremely gravelly sandy loam?

In Coyanosa, extremely gravelly sandy loam at about 40 inches calls for a bore that controls loose material behind the bit. We plan the route around the mapped Delnorte soil and any utilities along the street.

  1. We check the proposed Coyanosa route and marked utilities first; paint on Frank Street shows where a line runs, not how deep it sits.
  2. In Delnorte gravelly ground, we support the hole with drilling fluid and ream in stages so loose material is less likely to cave behind the bit.
  3. We lay out the pipe before the final ream on a gravelly Coyanosa route, then pull it through while the bore is open.
  4. A walkover locator follows the drill head along the planned path, while we record depth and pitch through the changing gravel in Coyanosa.
6 inch Schedule 40 PVC sleeve in a bore pit in sandy soil on a water main crossing at NE 24th Street, Oklahoma City
A 6 inch Schedule 40 PVC sleeve in a bore pit in sandy soil on a water main crossing in Oklahoma City.

What does a bore have to cross on Frank Street in Coyanosa?

FM 1776 is the state highway mapped inside Coyanosa, with 0.8 roadway miles inside the community boundary. Frank Street is the longest named local street at 0.6 miles, followed by Battle Street at 0.53 miles and Bettie Street at 0.43 miles. A route on any of these roads needs a plan that identifies the road owner and marked utilities before drilling. Boring can pass beneath pavement, driveways and sidewalks without cutting across their surface, with work pits kept off the paved route.

No railroad is mapped inside Coyanosa or within one mile outside the community boundary, so a mapped rail crossing is not part of the local route picture. No streams are mapped inside or within one mile, and no lakes or ponds are mapped within one mile. If a proposed route reaches a water feature beyond those mapped areas, its actual location needs to be checked during planning before setting the bore path.

Do I need a permit to bore in Coyanosa, Pecos County?

For FM 1776 in Coyanosa, TxDOT owns the state highway right of way, and the TxDOT Odessa District reviews a utility permit application. The utility that owns the line files through TxDOT’s online RULIS system; we prepare the bore plan and profile for that filing and work under the owner’s permit. County roads in this unincorporated community are handled by the county, not a city government. A Texas811 locate request for a bore along Frank Street must be made at least 48 hours before excavation, excluding weekends and legal holidays, and no earlier than 14 days before it.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Coyanosa, Pecos County?

The water provider for a specific Coyanosa address must be confirmed with the county or local water district before planning a bore; available EPA records do not tie a system to this place by name. AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power, Rio Grande Electric Cooperative and Southwest Texas Electric Cooperative report service in Pecos County, but the line owner at the address must be confirmed before a conduit bore. Near FM 1776, hydrovac potholing can expose marked water and electric lines before drilling close to them.

Line ownerWhat it isSourceSize
AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power, Rio Grande Electric Cooperative and Southwest Texas Electric CooperativeElectric utilities reporting service in Pecos CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Housing data is not published reliably for a place as small as Coyanosa, so the age of buried services cannot be inferred from a local housing survey. On Frank Street and Bettie Street, service routes may run along the road before branching to a property. Coyanosa averages 13.9 inches of precipitation a year, with September wettest at 1.9 inches and February driest at 0.5 inches. We expose each marked utility on the bore path before the drill approaches it; paint shows position, not depth.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

How far is Coyanosa from Pyote and our Yukon office?

Coyanosa is in Pecos County in west Texas, at an elevation of 2,612 feet and with a mapped land area of 0.22 square miles. ZIP code 79730 serves the community. Grandfalls is 14.2 miles northeast, Pyote is 20.8 miles north, and Imperial is 21.9 miles east. Fort Stockton, the county seat and nearest larger city, is 26.3 miles southeast. Coyanosa is 513 road miles and a 10.2 hour drive from our Yukon, Oklahoma main office, so distance is part of planning crew mobilization.

Places near Coyanosa

What kinds of bores come up around Bettie Street in Coyanosa?

  • Highway crossing: A bore beneath FM 1776 can keep a utility route below the paved surface, with the TxDOT permit plan guiding the crossing.
  • Water service: A line routed from a property toward Frank Street needs the address water provider confirmed before the bore is planned.
  • Fiber route: Fiber conduit along Bettie Street can be installed below the road surface, with marked utilities exposed before drilling near them.
  • Electric conduit: A route near Battle Street needs the specific line owner confirmed because several utilities report service in Pecos County.
  • Driveway crossing: A bore serving a property off Gamboa Road can pass beneath a driveway without cutting its surface.
  • Service replacement: A new line near FM 1776 can use a bore path that avoids opening the highway pavement.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a bore near FM 1776 in Coyanosa?

For a Coyanosa bore near FM 1776, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help define the route. Include any street, driveway or pavement the line must pass beneath. That lets us compare the proposed path with the local road and ground conditions before pricing the work.

The route details set the price, not footage alone. Delnorte gravelly soil affects drilling and reaming; crossings and exposed utilities affect the work plan; pavement or concrete, creek or drainage crossings, pits, excavator time and sand backfill can add scope. The 513 road miles from Yukon also make mobilization part of a Coyanosa job. High profile or emergency work can require a different plan, so the address and route sketch matter.

Questions people ask about boring in Coyanosa

Does Trinity take directional boring jobs in Coyanosa, Pecos County, and who does the work?

Yes. We take directional boring work in Coyanosa, with our own crews and partner drilling contractors we have vetted available for the work. Customers deal with Trinity from the first call through the bore log, regardless of which crew is at the site. A route along Frank Street or FM 1776 can be scoped from its address and plans.

What ground does a Coyanosa bore pass through in Delnorte soil?

The USDA soil survey maps Delnorte across Coyanosa, with extremely gravelly sandy loam about 40 inches below the surface. Gravelly material can cut easily but may fall into the hole behind the drill head. That is why a bore route near Bettie Street may call for fluid support and reaming in stages. The map describes soil patterns, not test borings.

Will we hit rock boring through very gravelly loam in Coyanosa?

The soil survey does not map bedrock within the top five feet of Coyanosa, but that does not rule out rock deeper down. The geologic map includes alluvium of Holocene age and Cenozoic sedimentary rocks of Paleocene age. A bore near FM 1776 still needs to be planned for what is found along its actual route.

Who approves a bore under FM 1776 in Coyanosa, and which state office reviews it?

TxDOT reviews a utility crossing of FM 1776 through its Odessa District. The utility that owns the line applies in TxDOT’s RULIS system, using the bore plan and profile we prepare. The permit covers work in the highway right of way. A route on Frank Street is a county road matter rather than a state highway permit.

Which electric line owner should I check in Coyanosa, Pecos County?

The address specific electric line owner needs to be confirmed before we plan a conduit bore in Coyanosa. AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power, Rio Grande Electric Cooperative and Southwest Texas Electric Cooperative report service in Pecos County. For a route near Bettie Street, locating and exposing the marked line helps establish its position before drilling.

Does the county or a city control Bettie Street in Coyanosa, and must it be cut?

Coyanosa is unincorporated, so it has no city government; county or state responsibility depends on the road. Bettie Street is a local named street, and a directional bore can pass beneath its surface without cutting the pavement. We still need to identify marked utilities and the road owner for the proposed route.

Can I reach Trinity after hours about an urgent Coyanosa bore on Bettie Street?

Yes. Someone answers our phone 24 hours a day at (405) 409-7423 for an urgent Coyanosa request. Be ready to describe the Bettie Street address or route, what line needs to go in, and any pavement or utilities in the path so we can understand the job.

How early should I call Texas811 before a Coyanosa bore on Frank Street?

For excavation near Frank Street, Texas law requires a locate request at least 48 hours before work starts, not counting Saturdays, Sundays or legal holidays, and no earlier than 14 days before. For an FM 1776 boring, if our start slips more than 14 days past the original notice, we make a new request. On Frank Street, we have worn or moved marks refreshed through Texas811 before continuing boring work.

What affects the cost of a directional bore near FM 1776 in Coyanosa?

The price depends on the route and work involved, including length, pipe or conduit size, Delnorte gravel, utilities to expose, pavement, pits and equipment time. A crossing near FM 1776 adds highway planning, while Coyanosa’s 513 road miles from Yukon affect mobilization. Drainage crossings or urgent timing can also change the scope.

Where the Coyanosa facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Coyanosa

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Coyanosa, Texas

Type the address of your job in Coyanosa. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Coyanosa

Same county: Iraan · Sheffield. All counties: Texas county list.