trinityboringsolutions.com

Pyote Texas Directional Boring: Soil, Interstate 20 and Union Pacific

Quick Answer: Pyote soils cover 59 percent of the mapped area, and sandy ground can cave behind a drill head. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for routes near Interstate 20 and Pyote Street. Pyote is 500 road miles from our Yukon, Oklahoma main office, a distance that affects mobilization. At about 40 inches, fine sandy loam is common, so crews plan fluid and reaming to keep the hole stable.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Pyote bores at a glance

  • Incorporated city in Ward County, Texas. Population 69 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 500 miles, about 9.6 hours of driving.
  • Ground: Pyote soil is mapped on 59 percent of the area, with fine sandy loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 20, Texas State Highway 115, Spur 57, RM 2355 and FM 1927. State permit office: TxDOT Odessa District.
  • Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
  • Public water: City of Pyote, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near Interstate 20 in Pyote?

Trinity Boring Solutions takes directional boring work in incorporated Pyote, Ward County, where the Census Bureau Vintage 2024 estimate lists 69 residents. Pyote soils are the ground crews plan around. We install water, sewer, gas, electric conduit and fiber on routes such as Pyote Street or near Interstate 20, with the line and crossing layout shaping the bore plan.

Our main office is in Yukon, Oklahoma, and Pyote work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For lines near the City of Pyote water system or electric service reported in Ward County, our record is no utility strike in over 25 years. The family business began in 1965, and we have done directional boring since 1982, experience we bring to routes near Pyote Street and Interstate 20.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

What does the USDA soil survey show beneath Pyote?

The USDA soil survey maps Pyote soil across 59 percent of Pyote, with Delnorte gravelly soils at 20 percent and Monahans soils at 11 percent. Those mapped patterns are not test borings. At 40 inches, fine sandy loam is the mapped texture across 59 percent, while extremely gravelly fine sand accounts for 20 percent. The survey estimates 79 percent of the area is sandy at that depth and 39 percent gravelly, with average clay content of 14 percent. Sand can cut readily but may cave behind the bit, so the bore needs a plan to support the hole.

USDA soil survey, inside the Pyote city limitsWhat is mapped
Soil series mappedPyote 59 percent, Delnorte 20 percent, Monahans 11 percent, Upton 7 percent and Kinco 3 percent
Texture at the surfaceloamy fine sand 59 percent, very gravelly loam 20 percent and fine sandy loam 14 percent
Texture about 40 inches downfine sandy loam 59 percent, extremely gravelly fine sand 20 percent and sandy clay loam 11 percent
Engineering class about 40 inches downsilty sand (SM) 59 percent, clayey gravel (GC) 28 percent and clayey sand (SC) 11 percent
Average clay content about 40 inches down14 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

USDA mapping places no bedrock within the upper five feet of Pyote, but that does not rule out deeper rock. The geologic map lists caliche deposits, a Cenozoic chemical unit with thickness as much as 35 ft, and Paleocene Cenozoic sedimentary rocks. We account for seasonal water table and flood prone soils that are not mapped when planning boring work in Pyote. High steel corrosion risk is not mapped either, though high concrete corrosion risk covers 11 percent. These patterns help guide planning, not replace a site review.

How do crews bore through Pyote fine sandy loam?

In Pyote fine sandy loam, we plan to keep the bore supported as the sandy ground can fall in behind the drill. Near Interstate 20, the crossing layout and surface conditions also shape the drilling sequence.

  1. With Pyote soils mapped as sandy across 79 percent of the area at 40 inches, we use drilling fluid to help hold the hole open as the bit advances.
  2. Where the survey maps gravelly ground in Pyote, crews check drill depth and pitch as they work to keep the head on its planned route.
  3. Before drilling near a marked line along Wall Street, we use hydrovac potholing to expose it because surface marks show location, not depth.
  4. For a Pyote crossing near Interstate 20, we track the drill head from the surface and log depth and pitch through the bore.
Bobcat E35 mini excavator lowering a 6 inch PVC sleeve into a bore pit in sandy soil at NE 24th Street in northeast Oklahoma City
Lowering a 6 inch PVC sleeve into a bore pit in sandy soil at NE 24th Street in Oklahoma City.

Which crossings shape a bore along Pyote Street in Pyote?

Pyote bores may involve Interstate 20, Texas State Highway 115, Spur 57, RM 2355 or FM 1927, all mapped within town limits. Interstate 20 has 1.9 mapped roadway miles in the town. A bore along Pyote Street, the longest named street at 1.14 miles, may also need to account for nearby Rodgers Street at 1.04 miles and Wall Street at 0.98 miles. These roadway and street layouts affect access, bore alignment and where entry and exit pits can fit.

CrossingTypeMapped extentWho has a say
Interstate 20Interstate1.9 roadway miles insideState highway office
Texas State Highway 115State highway1 roadway miles insideState highway office
Spur 57State highway1 roadway miles insideState highway office
RM 2355State highway0.5 roadway miles insideState highway office
FM 1927State highway0.2 roadway miles insideState highway office
Union PacificRailroad1.12 track miles insideThe railroad
Swipe the table sideways to see every column.

Union Pacific has 1.12 track miles within Pyote limits on its Toyah Subdivision, and public mapping shows 2 street and rail crossings. A track bore needs the railroad’s crossing agreement, which sets the crossing conditions. No streams are mapped within town or within one mile outside it, and no lakes or ponds are mapped within one mile. With no mapped stream crossings, a Pyote bore is more likely to focus on roadway, street or rail conflicts.

Who approves bore work in Pyote and Ward County?

Pyote is incorporated, so its city streets, including Woodard Street and Pyote Street, belong to the city itself. Work in the right of way of Interstate 20, Texas State Highway 115, Spur 57, RM 2355 or FM 1927 needs a TxDOT utility permit. The TxDOT Odessa District reviews the application, which the utility owner submits through RULIS; we prepare the bore plan and profile and work under that owner’s permit. At highway crossings, required cover depends on the line type: electric and communication lines and water lines need 60 inches, while pressurized sewer lines need 60 inches. Railroad work on Union Pacific track needs its crossing agreement.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What lines serve Pyote, including the City of Pyote system?

The City of Pyote public water system uses groundwater wells; public records list 121 service connections and 131 people served. That means a proposed water bore near Pyote Street should be planned around existing water lines. Oncor Electric Delivery Company and Texas-New Mexico Power report electric service in Ward County. The specific electric line owner must be confirmed before a conduit bore, since countywide reporting does not identify the provider at every Pyote address.

Line ownerWhat it isSourceSize
City of PyotePublic water systemGroundwater wells121 connections, 131 people served
Oncor Electric Delivery Company and Texas-New Mexico PowerElectric utilities reporting service in Ward CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Pyote’s median housing year at 1960, a factor we consider when planning underground work. The survey estimates 49 percent of housing units were built before 1960, 44 percent from 1960 to 1999 and 7 percent in 2000 or later. Work along older streets such as Wall Street may involve existing services, while newer work can add connections. Before drilling near marked utilities, we use hydrovac potholing to expose them; paint shows position, not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Where is Pyote in relation to Monahans and nearby towns?

Pyote is an incorporated Ward County town at an elevation of 2,624 ft, with a land area of 1.27 square miles and ZIP code 79777. Monahans, the county seat and nearest larger city, is 8.4 miles north. Wickett is 7.2 miles east, Thorntonville is 12.1 miles east, and Wink is 15.1 miles north. From our Yukon, Oklahoma yard, the route is 500 road miles and a 9.6 hour drive. That distance is part of planning mobilization for work near Interstate 20 or the Union Pacific track.

Places near Pyote

What bore work could involve Wall Street in Pyote?

  • Highway crossing: An Interstate 20 bore needs a route and pit layout that accounts for highway right of way and the line owner’s permit.
  • Rail crossing: A bore beneath the Union Pacific Toyah Subdivision follows the railroad agreement for casing, depth and flagging.
  • Water service: A connection near Pyote Street needs planning around the City of Pyote groundwater system and existing service lines.
  • Electric conduit: Before choosing a route near Wall Street, confirm the specific line owner among utilities reporting service in Ward County.
  • Fiber route: A fiber bore beside Interstate 20 or along Rodgers Street can avoid cutting the surface when the path and crossings allow.
  • Street crossing: Work near Woodard Street can use entry and exit pits in dirt to keep the street surface uncut.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How can I price a Pyote bore near Union Pacific track?

To quote a Pyote bore near Union Pacific track or along Wall Street, we need the address or map pin and what will go underground. Tell us the pipe or conduit size and estimated footage; for example, note whether a route is near Pyote Street or Interstate 20. A sketch or plans help show crossings, pit locations and the route we need to assess.

Mobilization starts with the 500 road miles between Pyote and our Yukon yard. The mapped sandy and gravelly ground can affect drilling and hole support, while crossings of Interstate 20 or Union Pacific track add planning requirements. Length, pipe or conduit size, utilities to expose, pavement, pit access, excavator time and sand backfill also shape the work. High profile or emergency timing can change the demands. The route and conditions in Pyote determine the actual scope.

Questions people ask about boring in Pyote

Does Trinity take directional boring jobs in Pyote, Ward County?

Yes. We take directional boring work in Pyote, Ward County, and staff it with our own crews or from satellite yards run by partner drilling contractors we have vetted. For Pyote work, we coordinate with Trinity through the bore log, regardless of which crew is on site. Routes near Interstate 20 still need planning around local ground and crossings.

Will a bore in Pyote hit rock below the mapped soils?

Rock is not mapped within the top five feet in Pyote, but that does not rule out deeper rock. The geologic map lists caliche deposits and Paleocene Cenozoic sedimentary rocks. Because those are mapped units rather than site borings, a route near Pyote Street needs a site specific review before choosing equipment and depth.

Who approves a bore under Interstate 20 in Pyote?

The utility owner applies for a TxDOT utility permit through RULIS for work in Interstate 20 right of way, and the TxDOT Odessa District reviews it. We provide the bore plan and profile for that application. The line type affects cover, so a Pyote crossing needs its depth planned to the applicable TxDOT rule and permit.

What do we need for a Pyote bore beneath Union Pacific track?

A crossing beneath the 1.12 track miles of Union Pacific in Pyote needs an agreement from the railroad that owns the track. The agreement sets crossing conditions such as casing, depth and flagging. If the line also occupies highway right of way near Interstate 20, TxDOT asks for a copy of the railroad agreement.

Who operates Pyote’s public water system, and where does its water come from?

The City of Pyote owns the public water system, which draws from groundwater wells. Public records list 121 service connections serving 131 people. A proposed water bore near Pyote Street should account for those existing lines and confirm the exact route before drilling.

Which electric company serves my Pyote, Ward County address?

Oncor Electric Delivery Company and Texas-New Mexico Power report electric service in Ward County, but those records do not identify the provider at every Pyote address. Confirm the line owner before planning a conduit bore near Wall Street or another route, so the conduit and crossing plan match the utility involved.

What bore sizes and lengths can Trinity handle near Woodard Street in Pyote?

For a Pyote project near Woodard Street, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The route, mapped sandy ground and nearby utilities help determine what size and length fit the job.

How much notice does Texas811 need for a Pyote Street bore?

For a bore along Pyote Street, Texas law requires the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. When a Pyote start slips more than 14 days past the original notice, we make a new request. We have worn or moved marks refreshed through Texas811 before work continues in Pyote.

What affects the cost of a directional bore near Interstate 20 in Pyote?

The Pyote job’s length and pipe size matter, as do sandy or gravelly ground, utilities to expose, pavement, pit work and backfill. A crossing near Interstate 20 or Union Pacific track can add planning demands. Mobilization also reflects the 500 road miles from our Yukon yard; the route and scope determine the work involved.

Where the Pyote facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Pyote

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Pyote, Texas

Type the address of your job in Pyote. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Pyote

Same county: Grandfalls · Barstow. All counties: Texas county list.