Iraan Texas Directional Boring: Reagan Soil, US 190 and Pecos River
Quick Answer: Can we get your line beneath US 190 or Drake Street without cutting the pavement? Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Iraan, Texas, for routes beneath those roads. Iraan is 509 road miles from our Yukon, Oklahoma main office, and the Pecos River is 0.5 miles from the city limits. Reagan soil and silty clay loam can hold a bore open but may stick to the reamer, so the drilling plan matters.
Iraan bores at a glance
- Incorporated city in Pecos County, Texas. Population 1,014 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 509 miles, about 10 hours of driving.
- Ground: Reagan soil is mapped on 60 percent of the area, with silty clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 10 percent of the area.
- Highways inside the boundary: US 190 and Texas State Highway 349. State permit office: TxDOT Odessa District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Iraan, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near the Pecos River in Iraan?
Trinity Boring Solutions takes directional boring work in Iraan, Pecos County, including routes beneath Drake Street and US 190. Can we get your line under one of those roads without cutting the surface? We install water, sewer, gas, electric conduit and fiber along Iraan streets and highway routes. The Census Bureau Vintage 2024 estimate puts the city population at 1,014, which helps frame the scale of local service and replacement work.
Our main office is in Yukon, Oklahoma, and Iraan work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For Iraan routes from Drake Street to US 190, our family business dates to 1965, with directional boring work dating to 1982. We handle jobs from 3/4 inch service lines to 48 inch casing, and bore lengths from 10 feet to 5,000 feet.

What is Reagan soil like to bore through in Iraan?
Iraan has mostly Reagan soil, while the USDA soil survey maps silty clay loam across 64 percent of the city at about 40 inches below the surface. Reagan-Hodgins association, nearly level, accounts for 60 percent of mapped area. The survey maps no sandy area at that depth and shows very gravelly loam across 26 percent. These are mapped soil patterns, not test borings; a route near Drake Street still needs planning for the ground actually encountered.
| USDA soil survey, inside the Iraan city limits | What is mapped |
|---|---|
| Soil series mapped | Reagan 60 percent, Sanderson 24 percent, Ector 10 percent, Iraan 4 percent and Upton 3 percent |
| Texture at the surface | silty clay loam 64 percent, gravelly loam 24 percent and very gravelly loam 10 percent |
| Texture about 40 inches down | silty clay loam 64 percent, very gravelly loam 26 percent and bedrock 10 percent |
| Engineering class about 40 inches down | lean clay (CL) 64 percent and clayey gravel (GC) 26 percent |
| Average clay content about 40 inches down | 32 percent |
| Bedrock mapped within 60 inches | 10 percent of the area (10 percent hard rock, 0 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 4 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 10 percent of Iraan, all listed as hard bedrock, with no weathered bedrock mapped at that depth. No seasonal water table is mapped within 60 inches, while flood prone soils cover 4 percent and high steel corrosion risk covers 4 percent. The Quaternary deposits, undivided, include sand, silt, clay and gravel; Early Cretaceous sedimentary units include sand, chalk, limestone and mud. Gravel or a soil to rock change can steer a drill head, and steel casing or tracer wire may need corrosion protection selected by the line owner.
How do crews handle silty clay loam in Iraan?
Iraan’s silty clay loam and Reagan soil call for controlled fluid and staged reaming. Along streets such as Hallmark Street, we track the drill head from the surface and log depth and pitch.
- Reagan soil is clay rich in the survey, so we use a thinner fluid mix and polymer, then ream in stages to limit sticky buildup.
- Where Iraan’s silty clay loam holds the bore open, we prepare the pipe before the final ream and pull it the same day.
- Gravelly loam is mapped in parts of Iraan, so we check drill depth and pitch at each rod to keep the head on line.
- Near the 4 percent of city area mapped as flood prone soil, a Pecos River crossing needs depth planning and a jurisdiction check.

Where might a line go under Drake Street in Iraan?
Iraan routes may need to pass beneath US 190, mapped for 0.6 roadway miles inside the city, or Texas State Highway 349, with 0.8 miles inside the limits. Drake Street is the longest named street at 0.82 miles; Hallmark Street runs 0.77 miles, and Blanton Street runs 0.76 miles. A bore beneath pavement avoids an open cut, but the route and access points still have to fit the street and its buried utilities.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 190 | US highway | 0.6 roadway miles inside | State highway office |
| Texas State Highway 349 | State highway | 0.8 roadway miles inside | State highway office |
| Pecos River | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Iraan or within one mile outside its limits, so the city has no mapped rail crossing to plan around. No named stream crosses the city, and none of the mapped streets crosses a named stream. The Pecos River lies 0.5 miles from the city limits, while Iraan has 0.51 miles of unnamed drainage. A proposed water crossing at the river would need jurisdiction checked during planning.
Who signs off on a bore under US 190 in Iraan?
US 190 and Texas State Highway 349 are state highways in Iraan, so work in their right of way goes through the Texas Department of Transportation. The TxDOT Odessa District reviews the utility permit. The utility that owns the line submits the application through RULIS, and we prepare the bore plan and profile for that filing. TxDOT rules call for boring or tunneling beneath existing highway pavement; the permit sets the allowed alignment and cover. Iraan’s city streets, including Drake Street, belong to the incorporated city. No railroad is mapped near the city, and a Pecos River crossing would be checked for federal water jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near the City of Iraan system?
The City of Iraan public water system uses groundwater wells and reports 628 service connections serving 1,229 people. That system is a useful starting point for identifying water infrastructure, but the specific line owner along Hallmark Street must be confirmed before a conduit bore. Electric utilities reporting service in Pecos County are AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power, Rio Grande Electric Cooperative and Southwest Texas Electric Cooperative; the provider at a particular Iraan address still needs confirmation.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Iraan | Public water system | Groundwater wells | 628 connections, 1,229 people served |
| AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power, Rio Grande Electric Cooperative and Southwest Texas Electric Cooperative | Electric utilities reporting service in Pecos County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Iraan’s median housing year at 1967; 38 percent of units were built before 1960, and 38 percent were built in 2000 or later. A replacement bore near Hill Street may follow older service routes, while newer construction can call for a new connection. We hydrovac expose marked utilities on the planned path before drilling near them, since surface paint shows location, not depth.

Which nearby places near Iraan, such as Sheffield, can we serve?
Iraan is in Pecos County, covers 0.62 square miles and sits at an elevation of 2,219 feet. We recognize ZIP code 79744 for Iraan boring requests and plan routes near Drake Street in Pecos County. Sheffield is 16.3 miles south, Rankin is 21.7 miles north, and McCamey is 24.3 miles northwest. Fort Stockton, the Pecos County seat, is 58.4 miles west. From our Yukon, Oklahoma main office, Iraan is 509 road miles away and a 10.0 hour drive, a distance that can affect mobilization for work near US 190.
Places near Iraan
- Directional boring in Sheffield: 16.3 miles south
- Directional boring in Rankin: 21.7 miles north
- Directional boring in McCamey: 24.3 miles northwest
- Directional boring in Big Lake: 32.8 miles northeast
- Directional boring in Crane: 42.5 miles northwest
What boring work comes up near Hallmark Street in Iraan?
- Highway crossing: A bore beneath US 190 avoids cutting the paved route, with the line owner’s TxDOT permit setting the approved plan.
- Street service: A water or sewer line beneath Hallmark Street can connect properties without opening a trench across the street.
- Electric conduit: At Drake Street, we first confirm the electric line owner and expose marked utilities along the proposed conduit path.
- Fiber route: A fiber bore along Blanton Street can pass below pavement while keeping the surface route intact.
- Drainage crossing: A line near Iraan’s unnamed drainage needs a route and depth suited to the mapped channel setting.
- Water crossing: A proposed bore toward the Pecos River needs planning for the channel and a check for federal jurisdiction.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send to price a bore near Hill Street in Iraan?
A map pin matters for a Hill Street quote because the exact route may change how a bore passes nearby utilities or unnamed drainage. For a US 190 crossing, we need the address or pin, underground item, pipe or conduit size, and footage. A sketch or plans help us see the route and any nearby pavement before we scope the work.
The job scope sets the price, not footage alone. Iraan is 509 road miles from Yukon, so mobilization is part of planning. Reagan soil and the mapped gravelly ground can affect drilling time; a route beneath US 190 adds highway permit and cover requirements. The number of utilities to expose, pavement or concrete, drainage crossings, pits, excavator time, sand backfill and emergency timing also shape the work.
Questions people ask about boring in Iraan
Does Trinity Boring Solutions take directional boring jobs in Iraan and Pecos County?
Yes, Trinity Boring Solutions takes directional boring work in Iraan, Pecos County. Our crews and vetted partner drilling contractors support the work from outside the city, while Trinity remains your contact from the first call through the bore log. That gives a project near US 190 one point of contact even when a partner crew is on site.
How do Iraan homes near Hallmark Street affect replacement bores?
Iraan’s housing has a median year built of 1967, according to the American Community Survey 2019 to 2023 estimates. With 38 percent of units built before 1960, a replacement route near Hallmark Street may need careful utility exposure before drilling. The survey also reports 38 percent built in 2000 or later, so a project could instead serve newer construction.
What ground does a bore pass through in Iraan’s Reagan soil?
The USDA soil survey maps Reagan soil across much of Iraan and silty clay loam across 64 percent of the city at about 40 inches down. It maps no sandy area at that depth. Clay can cling to a reamer, so a bore near Drake Street may need thinner drilling fluid, staged reaming and prompt pipe installation.
Is there bedrock under Iraan, and how close to the surface is it?
The USDA soil survey maps bedrock within five feet across 10 percent of Iraan, and that mapped bedrock is hard rather than weathered. The rest of the city is not mapped with bedrock in that depth range, which does not rule out deeper rock. A route near US 190 still needs field monitoring as ground conditions change.
Who approves a bore beneath US 190 in Iraan?
The Texas Department of Transportation handles work in the US 190 right of way, with review by the TxDOT Odessa District. The utility owner files the application in RULIS, while we prepare the bore plan and profile. TxDOT rules call for boring or tunneling below existing highway pavement, so the approved route and cover matter.
Can a line be bored beneath the Pecos River near Iraan?
A bore beneath the Pecos River can be considered, but the route needs planning for the channel and a check for U.S. Army Corps of Engineers jurisdiction. The river is 0.5 miles from Iraan’s limits, and 4 percent of the city’s mapped area is flood prone. Those map details help guide the review, not replace site specific planning.
How much 811 notice is needed for a bore on Drake Street in Iraan?
Paint on Drake Street shows a marked line’s position, not its depth. Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days past the notice, make a new request; worn or moved marks need refreshing through Texas811.
How far is Iraan from Trinity’s Yukon main office, and does that matter?
From our Yukon, Oklahoma main office, Iraan is 509 road miles and a 10.0 hour drive, so we plan underground work around that distance. That distance can affect mobilization for a bore near US 190, along with the job’s length, equipment needs and schedule. We can review the route and scope before planning the crew and equipment.
What affects the cost of directional boring under US 190 in Iraan?
The job’s route and scope drive its price, not one factor alone. For a US 190 crossing, the TxDOT permit and required cover affect planning; Iraan’s Reagan soil and gravelly ground can affect drilling. We also consider distance from Yukon, bore length and size, utilities to expose, pavement, drainage, pits, excavator time, backfill and emergency timing.
Where the Iraan facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Iraan
- U.S. Census Bureau, TIGER/Line 2024: Iraan boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Iraan
- U.S. Census Bureau, American Community Survey 2019 to 2023: Iraan housing units and year built
- Macrostrat geologic map compilation: map units under Iraan
- U.S. EPA Safe Drinking Water Information System: public water systems serving Iraan
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Pecos County
- U.S. Geological Survey, Elevation Point Query Service: Iraan elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Iraan
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Iraan
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Iraan, Texas
Type the address of your job in Iraan. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Iraan
Same county: Fort Stockton · Imperial · Coyanosa. All counties: Texas county list.