trinityboringsolutions.com

Bledsoe Texas Directional Boring: Amarillo Fine Sandy Loam, Texas State Highway 125 and FM 769

Quick Answer: Buchanan Street and Filmore Street are Bledsoe’s longest named roads, and Texas State Highway 125 runs through the community; we handle directional boring, also called horizontal directional drilling (HDD), for crossings there. The Yukon, Oklahoma main office is 409 road miles away, so a Texas State Highway 125 job needs mobilization planned with the route. The USDA soil survey maps Amarillo fine sandy loam across most of Bledsoe. At about 40 inches, sandy clay loam can grip the pipe, so reaming and fluid control matter.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Bledsoe bores at a glance

  • Unincorporated community in Cochran County, Texas. Population 56 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 409 miles, about 7.7 hours of driving.
  • Ground: Amarillo soil is mapped on 89 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 125, FM 769 and FM 595. State permit office: TxDOT Lubbock District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near Texas State Highway 125 in Bledsoe?

Bledsoe is an unincorporated community in Cochran County, where the Census Bureau counted 56 people in the 2020 Census; it has no city government. We can install water, sewer, gas, electric conduit or fiber by directional boring along routes serving Buchanan Street, Filmore Street or Texas State Highway 125, with the route and line owner checked for the actual address.

Our main office is in Yukon, Oklahoma, and Bledsoe work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have had no utility strike in over 25 years, a record we keep in mind where Southwestern Public Service and three cooperatives report electric service in Cochran County. Our family business began in 1965, and directional boring has been part of our work since 1982, including projects planned around Texas State Highway 125.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does the USDA map around Bledsoe’s Amarillo soil?

The USDA soil survey maps Amarillo soil across 89 percent of Bledsoe and Tokio soil across 10 percent. At the surface, fine sandy loam covers 99 percent of the mapped area. About 40 inches down, sandy clay loam is mapped under 90 percent, while clay loam accounts for 10 percent. These are mapped soil patterns, not test borings, so the actual route near Buchanan Street may vary. Sandy clay loam can hold an open hole but may stick to a reamer and grip the pipe.

USDA soil survey, inside the Bledsoe mapped community boundaryWhat is mapped
Soil series mappedAmarillo 89 percent and Tokio 10 percent
Texture at the surfacefine sandy loam 99 percent
Texture about 40 inches downsandy clay loam 90 percent and clay loam 10 percent
Engineering class about 40 inches downlean clay (CL) 99 percent
Average clay content about 40 inches down26 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

For Bledsoe, bedrock is not mapped in the top five feet, but that does not establish what a deeper bore will encounter. The geologic map identifies the Blackwater Draw Formation, a Cenozoic unit of sand, fine alluvium and silt, as well as Paleocene Cenozoic sedimentary rocks. Seasonal water table, flood prone soils and high steel corrosion risk are not mapped in the soil survey. The mapped clay can still hold a hole or grip pipe, so the bore plan should account for the route’s actual conditions.

How do crews bore Bledsoe’s sandy clay loam?

Bledsoe’s mapped sandy clay loam can stay open while also sticking to the reamer or gripping pipe. We adjust the fluid and reaming sequence for the ground along each planned route.

  1. With sandy clay loam mapped about 40 inches down, we use thinner drilling fluid and polymer to limit sticky buildup on the reamer near Buchanan Street.
  2. Amarillo fine sandy loam covers most of Bledsoe, so crews ream in stages and prepare the pipe before opening the final hole.
  3. When a bore follows Texas State Highway 125, we watch fluid returns and pressure so drilling does not lift pavement.
  4. At a marked utility route near Filmore Street, we hydrovac pothole each line before the drill approaches, since surface paint does not show depth.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

What might a bore cross on Buchanan Street in Bledsoe?

Texas State Highway 125, FM 769 and FM 595 each have mapped roadway inside the Bledsoe community boundary. For a bore beneath one of those state roads, the plan needs to account for TxDOT requirements and the road surface. Buchanan Street is the longest named street at 0.83 miles, followed by Filmore Street at 0.78 miles and McKinley Street at 0.59 miles. A route on those streets still needs its own utility checks and entry and exit pit locations.

CrossingTypeMapped extentWho has a say
Texas State Highway 125State highway0.8 roadway miles insideState highway office
FM 769State highway0.8 roadway miles insideState highway office
FM 595State highway0.4 roadway miles insideState highway office
Swipe the table sideways to see every column.

No railroad is mapped inside Bledsoe or within one mile outside the community boundary, so a mapped railroad crossing is not part of the local picture. The public road and rail crossing layer also shows none inside the community. No streams, lakes or ponds are mapped in or near Bledsoe, and no street crossings of named streams are mapped. If a project location differs from those mapped features, we would plan from the actual site information.

Who approves a Bledsoe bore in Cochran County?

Bledsoe has no city government, so street authority rests with Cochran County or the state, depending on the road. Work in the right of way of Texas State Highway 125, FM 769 or FM 595 needs a TxDOT utility permit reviewed by the Lubbock District. The utility owner, not the drilling contractor, submits the application through RULIS; we provide the bore plan and profile and work under the owner’s permit. TxDOT cover requirements vary by line type, and the district can set a different depth in the permit. No railroad or named stream crossing is mapped here.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns lines serving Bledsoe in Cochran County?

The water provider for a specific Bledsoe address has to be confirmed with the county or local water district before a bore is planned. Public records do not connect a drinking water system to this community by name. Southwestern Public Service, Bailey County Electric Cooperative Association, Lamb County Electric Cooperative and Lea County Electric Cooperative report electric service in Cochran County, but the line owner at the work site must be confirmed before a conduit bore.

Line ownerWhat it isSourceSize
Southwestern Public Service, Bailey County Electric Cooperative Association, Lamb County Electric Cooperative and Lea County Electric CooperativeElectric utilities reporting service in Cochran CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Bledsoe’s median housing year at 1960; 48 percent of units were built before 1960, and 52 percent from 1960 to 1999. That age can mean a project involves replacing an older service as well as adding a new one. Near McKinley Street, we hydrovac pothole marked utilities on the planned path before drilling close, because paint shows position but not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

What places are near Bledsoe and Levelland?

Bledsoe is in Cochran County, at an elevation of 3,964 feet, and covers 0.36 square miles within its mapped community boundary. Its ZIP code is 79314. Morton, the county seat, is 16.6 miles northeast; Whiteface is 23.3 miles east; Plains is 31.8 miles south; and Sundown is 32.3 miles east. Levelland, the nearest larger city, is 37.7 miles east. The Yukon, Oklahoma yard is 409 road miles away, a 7.7 hour drive, which affects mobilization for work near Texas State Highway 125.

Places near Bledsoe

Which jobs call for a bore near Filmore Street in Bledsoe?

  • Highway crossing: A bore beneath Texas State Highway 125 needs a route plan that accounts for pavement, right of way and the TxDOT permit.
  • Water service: A new service near Buchanan Street needs the address specific water provider confirmed before we plan the bore.
  • Electric conduit: Along McKinley Street, confirm the line owner before setting a conduit route through Cochran County.
  • Fiber drop: A fiber route near Filmore Street can use a bore to avoid opening the street surface along the planned path.
  • Sewer line: A sewer bore near 4th Street needs a profile matched to the pipe size, route and local sandy clay loam.
  • Roadside utility: Work along FM 769 needs access and pit placement planned around the state highway right of way.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Bledsoe bore near 4th Street?

For a bore near 4th Street, send the address or map pin, what is going in the ground, the pipe or conduit size and footage; a sketch or plans help. The route matters. Include any planned crossing of Texas State Highway 125 so we can understand the access and permit scope.

The Yukon yard is 409 road miles from Bledsoe, so mobilization is part of the job scope. Amarillo soil and sandy clay loam can affect drilling and reaming choices. The price also reflects bore length, pipe or conduit size, utilities to expose, pavement, pits and excavator time. A crossing at Texas State Highway 125 can add planning needs, while creek or drainage crossings are not mapped in the community. High profile or emergency work can also affect the work plan.

Questions people ask about boring in Bledsoe

Does Trinity take directional boring work in Bledsoe and Cochran County?

Yes. We take directional boring work in Bledsoe, and the project is managed through Trinity whether our own crew or a vetted partner contractor is on site. Our main office remains in Yukon, and Bledsoe is 409 road miles from it for project travel planning. Share the location and line scope near Texas State Highway 125 or a named street so we can plan the work.

What ground will a bore go through in Bledsoe’s Amarillo soil?

The USDA soil survey maps Amarillo fine sandy loam across most of Bledsoe, with sandy clay loam under 90 percent of the mapped area at about 40 inches. That deeper texture can stick to the reamer and grip pipe. The survey describes mapped patterns, not the exact soil at a particular bore on Buchanan Street.

Could we encounter rock while boring in Bledsoe, where soil series include Amarillo and Tokio?

Bedrock is not mapped in Bledsoe’s top five feet, but that does not rule out deeper rock. The geologic map shows the Blackwater Draw Formation, with sand, fine alluvium and silt, and Paleocene Cenozoic sedimentary rocks. A route near FM 595 still needs planning for the conditions found along the bore.

Who approves a bore under Texas State Highway 125 in Bledsoe?

TxDOT reviews a utility permit for work in the Texas State Highway 125 right of way through its Lubbock District. The utility owner files through RULIS, while we prepare the bore plan and profile and work under the owner’s permit. The permit sets the applicable cover depth for the line.

Which electric company owns the line at my Bledsoe address in Cochran County?

The line owner depends on the specific address. Southwestern Public Service, Bailey County Electric Cooperative Association, Lamb County Electric Cooperative and Lea County Electric Cooperative report electric service in Cochran County, but those records do not identify which one serves every Bledsoe property. Confirm the owner before planning conduit along McKinley Street.

Who controls McKinley Street in Bledsoe, and can a bore avoid cutting it?

Bledsoe is unincorporated and has no city government, so McKinley Street is under county or state authority depending on its classification. Directional boring can pass beneath a road without opening the surface when the route and ground allow. The exact street segment and utility locations guide pit placement.

How much notice does Texas811 need for a bore near Buchanan Street in Bledsoe?

For a bore near Buchanan Street, request utility locates through Texas811 at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For a Bledsoe start requiring TxDOT Lubbock District coordination, we submit a new request if work slips more than 14 days past the original notice. Before continuing work near Buchanan Street, we refresh worn or moved marks through Texas811.

How far is Bledsoe from the Yukon office, and does Levelland make a difference?

Bledsoe is 409 road miles from our Yukon, Oklahoma main office, and Levelland is 37.7 miles east of Bledsoe. The distance affects mobilization planning for work near Filmore Street or Texas State Highway 125. The bore scope, access and materials also shape the schedule and price.

What affects the cost of a Bledsoe bore under Texas State Highway 125?

For a crossing on Texas State Highway 125, we set the price from the defined boring scope and its work requirements. Length, pipe or conduit size, Amarillo soil conditions, utilities that need potholing, pavement, pits and equipment time all matter. A Texas State Highway 125 crossing also needs permit planning, and the 409 road miles from Yukon affect mobilization. We need the route details to assess those factors.

Where the Bledsoe facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Bledsoe

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Bledsoe, Texas

Type the address of your job in Bledsoe. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Bledsoe

All counties: Texas county list.