Whiteface Texas Directional Boring: Amarillo Soil, FM 1780, Railway Track
Quick Answer: Amarillo fine sandy loam is the main mapped soil around Whiteface, and its clayier layer can grip a reamer. Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work for lines crossing 2nd Street and other Whiteface routes. The Yukon main office is 401 road miles away, with FM 1780 marking a local route to plan around. At about 40 inches, the mapped soil is sandy clay loam, so staged reaming and a ready pipe help manage a sticky hole.
Whiteface bores at a glance
- Incorporated city in Cochran County, Texas. Population 378 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 401 miles, about 7.7 hours of driving.
- Ground: Amarillo soil is mapped on 98 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 1780, Texas State Highway 114, RM 169 and Texas State Highway 125. State permit office: TxDOT Lubbock District.
- Railroad track inside the boundary: Lubbock and Western Railway, with 5 mapped street and rail crossings.
- Public water: City of Whiteface, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in Whiteface and Cochran County?
Amarillo fine sandy loam is the main mapped soil in Whiteface, and its clayier layer can hold a hole open while sticking to the reamer. The Census Bureau Vintage 2024 estimate puts the town at 378 people. We install water, sewer, gas, electric conduit and fiber, including routes along 1st Street or connections near FM 1780; the line and its path determine the bore plan.
Our main office is in Yukon, Oklahoma, and Whiteface work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that began in 1965 and has done directional boring since 1982. We have gone more than 25 years without a utility strike, a record that matters around the City of Whiteface water lines and buried electric conduit.

What does the soil survey show beneath Whiteface and Amarillo soil?
The USDA soil survey maps Amarillo soil across 98 percent of Whiteface. Fine sandy loam is the mapped surface texture across 98 percent, while the layer at about 40 inches is sandy clay loam across 98 percent. The mapped clay share at that depth averages 25 percent, and none of the area is mapped as sandy at that depth. We treat these mapped patterns as planning references, not test borings, when assessing underground work in Whiteface. Along FM 1780, actual conditions still need to be checked as the bore advances.
| USDA soil survey, inside the Whiteface city limits | What is mapped |
|---|---|
| Soil series mapped | Amarillo 98 percent |
| Texture at the surface | fine sandy loam 98 percent |
| Texture about 40 inches down | sandy clay loam 98 percent |
| Engineering class about 40 inches down | lean clay (CL) 100 percent |
| Average clay content about 40 inches down | 25 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
Bedrock is not mapped within the top five feet of Whiteface, though that does not describe deeper conditions. Seasonal water table soils, flood prone soils and high steel corrosion risk are also not mapped. The Blackwater Draw Formation is Cenozoic and includes fine to medium quartz sand with silt and local clay, up to 25 feet thick where present. That mix can shift between easier cutting and sticky reaming, so we adjust the drilling fluid and reamer stages to the ground encountered near 2nd Street.
How do we drill Whiteface’s sandy clay loam?
The sandy clay loam mapped below Whiteface can hold its shape but may cling to the reamer. Near 1st Street, we plan the fluid, reaming stages and pipe setup around the ground actually encountered.
- Because Amarillo fine sandy loam can turn sticky with depth, we use thinner drilling fluid and polymer, then ream in stages to limit buildup.
- At 2nd Street, we plan the pipe to be ready before the final reaming pass, so the open hole is not left waiting.
- Every marked utility along a Whiteface bore path is hydrovac pothole exposed before the drill approaches; a mark beside Fillmore Street does not show depth.
- We follow the drill head from the surface and log depth and pitch as it advances, including beneath routes such as FM 1780.

What might a new Whiteface line cross near 2nd Street?
FM 1780, Texas State Highway 114, RM 169 and Texas State Highway 125 pass within Whiteface, so a route can involve state highway right of way. TxDOT maps 0.9 roadway miles of FM 1780 inside town limits. Among local streets, 2nd Street runs 0.82 miles, 1st Street 0.72 miles and Fillmore Street 0.71 miles. Those paved routes shape where entry and exit pits can fit. A bore can pass beneath pavement instead of cutting across a street, subject to the applicable owner’s approval.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 1780 | State highway | 0.9 roadway miles inside | State highway office |
| Texas State Highway 114 | State highway | 0.7 roadway miles inside | State highway office |
| RM 169 | State highway | 0.3 roadway miles inside | State highway office |
| Texas State Highway 125 | State highway | 0.3 roadway miles inside | State highway office |
| Lubbock and Western Railway | Railroad | 1.11 track miles inside | The railroad |
The Lubbock and Western Railway has 1.11 track miles inside Whiteface, and public mapping shows 5 street and rail crossings in town. A bore beneath that track needs an agreement from the railroad owner, with its terms guiding the crossing design. No named streams are mapped inside town, and none are mapped within one mile outside it. There are also no mapped lakes or ponds within one mile, so a mapped creek crossing is not part of the local route picture.
Who approves Whiteface bores near the Lubbock and Western Railway?
FM 1780, Texas State Highway 114, RM 169 and Texas State Highway 125 are state routes, so work in their right of way needs a TxDOT utility permit. The TxDOT Lubbock District reviews it. The utility owner, not Trinity, files through TxDOT’s online RULIS system; we prepare the bore plan and profile for work under the owner’s permit. A crossing of the Lubbock and Western Railway also needs an agreement from the railroad owner. Because Whiteface is incorporated, we account for city ownership of its streets when planning boring work. No named streams are mapped in or near town.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Whiteface through the City of Whiteface system?
The City of Whiteface public water system uses groundwater wells and serves 375 people through 217 service connections. That makes the water owner a key contact when planning a connection near Fillmore Street. No city owned electric system is identified in the records. Utilities reporting electric service in Cochran County include Southwestern Public Service, Bailey County Electric Cooperative Association, Lamb County Electric Cooperative and Lea County Electric Cooperative. The line owner must be confirmed before conduit plans are set for a Whiteface address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Whiteface | Public water system | Groundwater wells | 217 connections, 375 people served |
| Southwestern Public Service, Bailey County Electric Cooperative Association, Lamb County Electric Cooperative and Lea County Electric Cooperative | Electric utilities reporting service in Cochran County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Whiteface’s median housing year at 1978; 16 percent of housing was built before 1960, and 11 percent in 2000 or later. That mix can mean a replacement bore along 1st Street follows older buried service, while a new connection may take another route. We hydrovac pothole each marked utility on the bore path before drilling near it. For example, a marked line beneath Fillmore Street must be exposed because paint shows location, not depth.

Where is Whiteface in relation to Sundown?
Whiteface is an incorporated town in Cochran County, at an elevation of 3,680 feet and covering 0.59 square miles. Its ZIP code is 79379. Morton, the county seat, is 12.1 miles northwest; Sundown is 12.1 miles southeast; and Levelland is 14.4 miles east and is the nearest larger city listed. Whitharral is 19.0 miles northeast. The Yukon, Oklahoma main office is 401 road miles away, a drive of 7.7 hours, so distance is part of planning a bore mobilization to FM 1780.
Places near Whiteface
- Directional boring in Morton: 12.1 miles northwest
- Directional boring in Sundown: 12.1 miles southeast
- Directional boring in Levelland: 14.4 miles east
- Directional boring in Opdyke West: 18 miles east
- Directional boring in Whitharral: 19 miles northeast
What boring work could come up along Whiteface’s 1st Street?
- Water service: A replacement or new connection to the City of Whiteface system may follow a route near Fillmore Street.
- Highway crossing: A line crossing FM 1780 can be bored beneath the roadway, with TxDOT right of way requirements addressed.
- Rail crossing: A proposed line beneath the Lubbock and Western Railway needs the railroad owner’s agreement and crossing conditions.
- Fiber conduit: A conduit route along 1st Street can pass below pavement, with marked utilities exposed before drilling.
- Street crossing: A bore beneath 2nd Street can avoid an open cut across the paved route, subject to approvals.
- Electric conduit: The serving line owner is confirmed before planning a conduit route near Texas State Highway 114.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for Whiteface work near FM 1780?
Start with the address or map pin, such as a route near FM 1780. Tell us what goes underground, whether it is water, fiber or another line, then give the pipe or conduit size and footage. A sketch or plans help show the route past 2nd Street and any pavement, rail or utility crossings.
The Whiteface scope sets the price. Soil and reaming needs come first because the sandy clay loam mapped near 40 inches can cling to tooling. Length and pipe size matter, as do utilities that must be exposed and crossings at the Lubbock and Western Railway or FM 1780. Pavement, entry pits, excavator time and sand backfill affect the work plan. Mobilization also reflects the 401 road miles from Yukon.
Questions people ask about boring in Whiteface
Does Trinity Boring Solutions take jobs in Whiteface and Cochran County?
Yes. We take directional boring work in Whiteface, with staffing through our own crews and vetted partner drilling contractors rather than a local office. From our main office in Yukon, Oklahoma, we plan work with Whiteface conditions in mind. For a route near 1st Street, we stay involved from the first call through the bore log, regardless of which crew is on site.
Who owns the Whiteface track on the Lubbock and Western Railway, and what does a bore need?
The Lubbock and Western Railway owns the track mapped through Whiteface, with 1.11 track miles inside town. A bore below it needs an agreement from the railroad owner. The agreement sets crossing conditions such as casing, depth and flagging, so its requirements shape the plan before work near a street and track crossing proceeds.
For our underground crossing plans, who runs Whiteface’s public water system, and where does its water come from?
The City of Whiteface runs the public water system, which draws from groundwater wells. The system serves 375 people through 217 service connections, figures we consider when planning underground work in Whiteface. For a proposed water bore near Fillmore Street, the system owner and connection point help establish the route and the utility marks that need to be checked.
Which electric company serves Whiteface and Cochran County conduit projects?
County records list Southwestern Public Service, Bailey County Electric Cooperative Association, Lamb County Electric Cooperative and Lea County Electric Cooperative as reporting electric service in Cochran County. They do not establish which company serves every Whiteface address. Confirm the owner at the specific 1st Street or FM 1780 site before setting conduit specifications.
Does Whiteface control Fillmore Street, and does a bore have to cut it?
Because Whiteface is incorporated, we account for city ownership of its streets when planning boring work. A bore under Fillmore Street can pass beneath the pavement rather than use an open cut, subject to the needed approval and site conditions. We expose marked utilities on the bore path before the drill gets near them.
Do Whiteface housing and buried lines near 1st Street affect replacement bores?
They can. The American Community Survey 2019 to 2023 five year estimates give Whiteface a median housing year of 1978, with 16 percent of units built before 1960. An older service near 1st Street may need replacement routing around existing lines, so marks and potholes help establish what is underground before drilling.
Can I reach Trinity after hours about an urgent Whiteface bore near Fillmore Street?
Yes. A person answers Trinity’s phone at (405) 409-7423 around the clock, including for urgent work near Fillmore Street. We provide 24 hour emergency response, but the route, line type and access still determine the work needed at the Whiteface site.
How early should I call Texas811 for a Whiteface bore near 2nd Street?
Submit the locate request at least 48 hours before excavation, not counting Saturdays, Sundays or legal holidays, and no earlier than 14 days before the start. Texas811 describes this as at least two working days. If a 2nd Street start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of a Whiteface bore crossing FM 1780?
The job’s length, line size and ground conditions matter, along with utilities to expose, pavement, pits and equipment time. At FM 1780, highway crossing requirements can affect the plan; the Lubbock and Western Railway may add a separate crossing agreement. The 401 road miles from Yukon shape our mobilization planning for boring work in Whiteface. A map pin and route sketch help define the scope.
Where the Whiteface facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Whiteface
- U.S. Census Bureau, TIGER/Line 2024: Whiteface boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Whiteface
- U.S. Census Bureau, American Community Survey 2019 to 2023: Whiteface housing units and year built
- Macrostrat geologic map compilation: map units under Whiteface
- U.S. EPA Safe Drinking Water Information System: public water systems serving Whiteface
- U.S. Department of Transportation, North American Rail Network: track owners in Cochran County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Cochran County
- U.S. Geological Survey, Elevation Point Query Service: Whiteface elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Whiteface
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Whiteface
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Whiteface, Texas
Type the address of your job in Whiteface. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.