trinityboringsolutions.com

Calvert Texas Directional Boring: Bremond Soil, Tidwell Creek, Union Pacific

Quick Answer: Calvert is 351 road miles from our Yukon, Oklahoma main office, and our own crews and vetted partner crews cover routes near FM 979. We take directional boring, also called horizontal directional drilling (HDD), for crossings of Tidwell Creek and Union Pacific track. Bremond soil is the dominant mapped series, and clay at about 40 inches can grip a reamer or pipe. A bore near Main Street needs a route plan that accounts for marked utilities and nearby street crossings.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Calvert bores at a glance

  • Incorporated city in Robertson County, Texas. Population 991 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 351 miles, about 6.7 hours of driving.
  • Ground: Bremond soil is mapped on 54 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 979, Texas State Highway 6 and FM 1644. State permit office: TxDOT Bryan District.
  • Railroad track inside the boundary: Union Pacific, with 7 mapped street and rail crossings.
  • Named streams inside the boundary: Tidwell Creek and Sandy Creek.
  • Public water: City of Calvert, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Tidwell Creek in Calvert?

Trinity Boring Solutions takes directional boring work in Calvert, Robertson County, including water, sewer, gas, electric conduit and fiber routes along Main Street, FM 979 and other local corridors. The Census Bureau Vintage 2024 estimate puts Calvert at 991 residents. From our Yukon, Oklahoma main office, the drive is 351 road miles, so we plan staffing for the route and scope.

Our main office is in Yukon, Oklahoma, and Calvert work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet of 48 inch pipe beneath the Arkansas River in Tulsa; beside that, a Calvert job near Main Street is typically a shorter service or utility crossing. Our family business began in 1965, and we have done directional boring since 1982, including planning for Calvert work.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

How does Bremond soil affect drilling in Calvert?

The USDA soil survey maps Bremond as Calvert’s leading soil series, covering 54 percent of the city, so a route can encounter clay below a finer surface layer. Fine sandy loam makes up 67 percent of the mapped surface texture, while clay is mapped under 65 percent of the area at about 40 inches. We use the 36 percent average clay content at that depth when considering underground work in Calvert. Those are mapped patterns, not test borings, so the exact ground along a Main Street bore still needs to be checked as work advances.

USDA soil survey, inside the Calvert city limitsWhat is mapped
Soil series mappedBremond 54 percent, Silstid 12 percent, Tabor 8 percent, Robco 8 percent and Rader 4 percent
Texture at the surfacefine sandy loam 67 percent, loamy fine sand 21 percent and loam 10 percent
Texture about 40 inches downclay 65 percent, sandy clay loam 21 percent and sandy clay 4 percent
Engineering class about 40 inches downfat clay (CH) 66 percent, lean clay (CL) 22 percent and clayey sand (SC) 12 percent
Average clay content about 40 inches down36 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches28 percent of the area
Flood prone soils9 percent of the area
High corrosion risk for uncoated steel81 percent of the area

The USDA soil survey maps no bedrock in Calvert’s top five feet, though the Calvert Bluff Formation below includes mudstone, sandstone and lignite and is dated Ypresian. Seasonal water tables are mapped within 60 inches across 28 percent of the area, and flood prone soils cover 9 percent, so Tidwell Creek pits need a wet ground plan. High steel corrosion risk is mapped across 81 percent of the area; the line owner should consider casing and tracer wire materials, while HDPE does not share that steel concern.

How is a bore run through Calvert clay?

Calvert’s clay at about 40 inches can stick to a reamer and grip pipe, so we size the fluid and reaming plan to the route. Tidwell Creek and Main Street crossings also shape pit placement.

  1. Clay control: Bremond soil can make the reamer sticky, so we use a thinner drilling fluid, open the hole in stages and have pipe ready for the pull.
  2. Creek pits: Seasonal water tables mapped near Tidwell Creek can fill pits, so we plan compact pits and pumping where the route needs them.
  3. Utility exposure: Along Main Street or FM 979, we hydrovac marked lines on the bore path before drilling near them because surface paint does not show depth.
  4. Tracking: At a Wharton Street crossing, we follow the drill head from the surface and log depth and pitch as it advances. The bore leaves the pavement uncut.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

What could a new Calvert line cross near Union Pacific track?

Calvert has Texas State Highway 6, FM 979 and FM 1644 inside its limits, so a route on any of those roads needs a plan that protects the existing pavement. Main Street runs 3.2 miles in the city, Hanna Street 2.52 miles and Browning Street 2.26 miles. Wharton Street adds another named route to check. Boring can keep pavement and driveways uncut, with entry and exit pits placed off the roadway where the site allows.

CrossingTypeMapped extentWho has a say
FM 979State highway3.8 roadway miles insideState highway office
Texas State Highway 6State highway3.1 roadway miles insideState highway office
FM 1644State highway2.7 roadway miles insideState highway office
Union PacificRailroad2.31 track miles insideThe railroad
Tidwell CreekStream2.62 channel miles insideChecked for Corps of Engineers jurisdiction
Sandy CreekStream2.45 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 2.31 track miles inside Calvert on its Ennis Subdivision, and public mapping shows 7 street and rail crossings. A crossing of that track needs an agreement from Union Pacific, which sets the crossing conditions. Tidwell Creek runs 2.62 channel miles in the city and Sandy Creek 2.45; mapped streets cross named streams at 9 locations. Creek routes need depth planning below the channel, and the crossing is checked for federal jurisdiction during planning.

Who approves a Calvert bore in Robertson County?

For work in FM 979, FM 1644 or Texas State Highway 6 right of way in Robertson County, TxDOT’s Bryan District reviews the utility permit. The utility that owns the line files through TxDOT’s RULIS system; we prepare the bore plan and profile for that application and work under the owner’s permit. Because Calvert is incorporated, we plan street work around the city’s ownership of its streets. A route under Union Pacific track also needs an agreement from the railroad, and a Tidwell Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near the City of Calvert water system?

The City of Calvert public water system uses groundwater wells and reports 549 service connections serving 962 people. That makes the water line owner an important check before a new service or crossing is laid out near Main Street. Robertson County electric service is reported by Entergy Texas, Texas-New Mexico Power, City of Bryan and Navasota Valley Electric Cooperative. Before planning an electric conduit bore in Calvert, we confirm the line owner for the specific address.

Line ownerWhat it isSourceSize
City of CalvertPublic water systemGroundwater wells549 connections, 962 people served
Entergy Texas, Texas-New Mexico Power, City of Bryan and Navasota Valley Electric CooperativeElectric utilities reporting service in Robertson CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Calvert’s median housing year at 1970; 32 percent of housing was built before 1960, 53 percent from 1960 to 1999 and 15 percent in 2000 or later. That mix can mean work for replacement lines as well as new services along streets such as Wharton Street. Before drilling near a marked water or electric line, we use hydrovac potholing to expose it; paint gives position, not depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

Where is Calvert in relation to Hearne and the Yukon yard?

Calvert is in Robertson County, at elevation 334 feet, and covers 3.89 square miles in ZIP code 77837. Hearne is 8.4 miles southeast, while Franklin, the county seat, is 11.4 miles east. Bremond lies 12.9 miles north, and Cameron is 19.8 miles southwest. The route from our Yukon, Oklahoma main office is 351 road miles and about 6.7 drive hours, which is part of planning crew and equipment mobilization for a Calvert job.

Places near Calvert

Which jobs call for a bore near Main Street in Calvert?

  • Highway crossing: A bore beneath FM 979 keeps the existing roadway intact, with its limits planned around the TxDOT right of way.
  • Water service: A new service near Main Street needs the City of Calvert water line located and exposed before the drill approaches it.
  • Creek crossing: A route under Tidwell Creek needs a depth plan that stays below the channel and accounts for water in the pits.
  • Rail crossing: A line under Union Pacific track needs the railroad’s agreement and a route plan for its 2.31 track miles in Calvert.
  • Fiber route: A fiber conduit along Wharton Street can pass beneath pavement and driveways without opening a trench across them.
  • Electric conduit: Before a conduit bore near Texas State Highway 6, we confirm the electric line owner for that address.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Calvert bore quote near Wharton Street?

For a Calvert quote, send the address or map pin, what is going in the ground, the pipe or conduit size and footage; a sketch or plans help us check the route near Wharton Street. If the path is close to FM 979 or Tidwell Creek, include that in the location notes so we can identify the crossing constraints.

The largest price drivers are the ground and the crossings. Bremond clay can call for staged reaming and careful fluid control, while Tidwell Creek adds channel and pit planning. A route under Union Pacific track needs railroad coordination, and pavement near FM 979 affects the bore plan. Pipe size, total length, marked utilities to expose, concrete, pit work, backfill, emergency timing and mobilization from Yukon also shape the job.

Questions people ask about boring in Calvert

Does Trinity take directional boring work in Calvert and Robertson County?

Yes. We take directional boring work in Calvert, and the job can be staffed by our own crews or vetted partner crews. The customer works with Trinity from the first call through the bore log, including when a crew is working near Robertson County roads such as FM 979.

Could groundwater or flooding near Tidwell Creek affect a Calvert bore pit?

It can affect pit planning. The USDA soil survey maps seasonal water tables within 60 inches across 28 percent of Calvert, and Tidwell Creek runs through the city. We can plan smaller pits and pumping where needed, and check creek depth and jurisdiction as the route is developed.

Does Bremond soil in Calvert corrode steel, and what pipe can go in the bore?

The USDA soil survey maps high steel corrosion risk across 81 percent of Calvert, including areas with Bremond soil. The line owner should weigh casing and tracer wire materials for the site. HDPE is not affected by soil corrosion, but the owner selects the material and any coating for steel.

What ground is under Calvert, especially in Bremond soil?

Bremond is mapped across 54 percent of Calvert, with fine sandy loam common at the surface and clay mapped under 65 percent of the area at about 40 inches. We use the 36 percent average clay content at that depth when considering underground work in Calvert. These are USDA soil survey patterns, not test borings, so a route near Main Street may differ.

Could a directional bore in Calvert hit rock below the top five feet?

In Calvert, we account for the possibility of deeper rock because bedrock is not mapped in the top five feet. The geologic map shows the Calvert Bluff Formation, with mudstone, sandstone and lignite, below. A bore near FM 1644 still needs to be planned for the ground found along its actual route.

Who approves a bore under FM 979 in Calvert?

TxDOT’s Bryan District reviews a utility permit for work in FM 979 right of way. The utility that owns the line submits the application through RULIS, with our bore plan and profile supplied for it. Work under Union Pacific track also requires an agreement with the railroad.

What bore sizes and lengths can Trinity handle for a Calvert job near Wharton Street?

For Calvert projects, we handle 3/4 inch service lines through 48 inch casing and bore lengths from 10 feet to 5,000 feet. A Wharton Street route is sized around what the line must pass under, such as pavement, marked utilities or a driveway, rather than the street name alone.

How much notice does Texas811 need for a Calvert bore near Main Street?

For a Main Street start, place the Texas811 locate request at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before excavation. The ticket has a 20 day life; a start slipping more than 14 days past the original notice needs a new request. On Calvert work, we refresh worn or moved marks through Texas811 before boring continues.

What affects the cost of directional boring in Calvert near FM 979?

The route and scope determine the price, with Bremond clay and the number of crossings often driving the plan first. A bore near FM 979 may involve pavement and TxDOT coordination; Union Pacific track or Tidwell Creek adds crossing work. Length, pipe size, utility potholing, pits, backfill, equipment time, emergency timing and the 351 road miles from Yukon also matter.

Where the Calvert facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Calvert

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Calvert, Texas

Type the address of your job in Calvert. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Calvert

All counties: Texas county list.