Colmesneil Texas Directional Boring: Doucette Loamy Sand, US 69 And Mill Branch
Quick Answer: The City of Colmesneil owns its groundwater well system, and Entergy Texas and Sam Houston Electric Cooperative report county electric service; we verify the line owner before a bore beside US 69. We take directional boring, also called horizontal directional drilling (HDD), for routes under Mill Branch and Colmesneil streets. The Yukon main office is 428 road miles away, a mobilization factor for a route from Wheeler Avenue toward Woodville. Doucette soil is the largest mapped unit at 45 percent, and its loamy sand can cave behind the bit.
Colmesneil bores at a glance
- Incorporated city in Tyler County, Texas. Population 553 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 428 miles, about 8.7 hours of driving.
- Ground: Doucette soil is mapped on 45 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 29 percent of the area.
- Highways inside the boundary: US 69, FM 256, FM 3065 and FM 1745. State permit office: TxDOT Beaumont District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Mill Branch and Lively Branch.
- Public water: City of Colmesneil, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in Colmesneil and Tyler County?
The City of Colmesneil owns its groundwater well system, while Entergy Texas and Sam Houston Electric Cooperative report electric service in Tyler County, so we verify the line owner before planning a bore beside US 69. Trinity Boring Solutions takes directional boring work in Colmesneil, where the Census Bureau Vintage 2024 estimate is 553 residents. Along Wheeler Avenue or Pitzer Street, our crews can install water, sewer, gas, electric conduit or fiber without opening the full street.
Our main office is in Yukon, Oklahoma, and Colmesneil work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of boring have taught us to plan for loose loamy sand that can cave behind a reamer, a useful consideration in the Doucette map unit covering Colmesneil. Our family business dates to 1965, and we stay involved from the first call through the bore log.

What is Colmesneil’s Doucette soil like to bore?
Doucette loamy sand is the leading mapped soil in Colmesneil, covering 45 percent of the area, with Hillister loamy sand mapped across another 29 percent. The USDA soil survey maps loamy sand across 99 percent of the surface, but at about 40 inches below ground, sandy clay loam is mapped under 82 percent of the area. Loamy sand is mapped there under 17 percent, and the average clay content at that depth is 23 percent. These are mapped soil patterns, not test borings; loose sand can fall in behind the bit, so the drilling plan must keep the hole supported.
| USDA soil survey, inside the Colmesneil city limits | What is mapped |
|---|---|
| Soil series mapped | Doucette 45 percent, Hillister 29 percent, Shankler 17 percent, Choates 6 percent and Boykin 3 percent |
| Texture at the surface | loamy sand 99 percent |
| Texture about 40 inches down | sandy clay loam 82 percent and loamy sand 17 percent |
| Engineering class about 40 inches down | clayey sand (SC) 47 percent, lean clay (CL) 29 percent and silty sand (SM) 23 percent |
| Average clay content about 40 inches down | 23 percent |
| Bedrock mapped within 60 inches | 29 percent of the area (0 percent hard rock, 29 percent weathered rock) |
| Seasonal water table within 60 inches | 6 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 6 percent of the area |
Weathered bedrock is mapped within 60 inches across 29 percent of Colmesneil, while hard bedrock is not mapped at that depth. A seasonal water table within 60 inches is mapped across 6 percent, so pits in those areas may need pumping. Near Mill Branch, we plan Colmesneil boring depths knowing flood prone soils are not mapped. When planning a US 69 crossing in Colmesneil, we advise line owners to consider casing and tracer wire materials; high steel corrosion risk is mapped across 6 percent. The Cenozoic massive clay decomposition residuum includes clay and fine quartz sand; the Miocene Fleming Formation includes clay and sandstone. Weathered material may slow a bore compared with soil.
How do we drill Colmesneil’s sandy clay loam?
In Colmesneil, the USDA map shows sandy clay loam at about 40 inches under 82 percent of the area, with loamy sand across most of the surface. We match fluid, reaming and pipe timing to that mix rather than assume the ground will hold open.
- On Colmesneil’s loamy sand surface, we use drilling fluid to support the hole, ream in stages and have the pipe ready before the final pass.
- Where the mapped sandy clay loam lies about 40 inches down, we adjust the drilling fluid and reaming to keep the hole stable around the line.
- Near the 6 percent of mapped area with a seasonal water table within 60 inches, we keep pits small and plan to pump if water collects.
- At a route crossing Mill Branch or a street, we expose marked utilities with hydrovac before drilling near them and track the head from the surface.

Which roads or creeks might a Colmesneil bore cross near Mill Branch?
US 69 has 3.0 mapped roadway miles inside Colmesneil, alongside FM 256 with 1.7 miles, FM 3065 with 0.5 miles and FM 1745 with 0.4 miles. No highways are listed within 1.5 miles outside the city limits. Wheeler Avenue is the longest named street at 3.0 miles, followed by Elder Street at 1.57 miles and Pitzer Street at 1.15 miles. These routes can put a bore near both pavement and existing utilities, so the planned path and crossing points matter.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 69 | US highway | 3 roadway miles inside | State highway office |
| FM 256 | State highway | 1.7 roadway miles inside | State highway office |
| FM 3065 | State highway | 0.5 roadway miles inside | State highway office |
| FM 1745 | State highway | 0.4 roadway miles inside | State highway office |
| Mill Branch | Stream | 1.28 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Lively Branch | Stream | 0.22 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Wilson Branch | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| One Mile Branch | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Wolf Creek | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
| Goodwater Branch | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Lake Amanda | Lake or pond | 110 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Frog Pond | Lake or pond | 88 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Lake Tejas | Lake or pond | 18 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Colmesneil or within 1 mile outside its limits, and no street and rail crossing is mapped. Mill Branch runs for 1.28 channel miles inside the city, while Lively Branch runs for 0.22 miles; seven mapped street crossings intersect named streams. Lake Amanda, Frog Pond, Lake Tejas, Freemans Lake and Rileys Lake are within 1 mile but outside city limits. A creek route needs a jurisdiction check during planning, and a bore can avoid cutting the channel or street surface.
Who approves a Colmesneil bore under US 69?
At a US 69 crossing, the cover depth sets how far below the road the bore must run: electric and communication lines need 60 inches, and water lines need 60 inches; pressurized sewer lines also need 60 inches. TxDOT Utility Accommodation Rules give different cover for lines running along the right of way, and the Beaumont District reviews the permit. The utility owner files through TxDOT’s online RULIS system, with our bore plan and profile supporting its application. Existing highway pavement is bored or tunneled beneath, with crossings encased and the bore extending under all rural highway travel lanes. Colmesneil city streets belong to the city, and a stream crossing near Mill Branch is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns lines near the City of Colmesneil system?
The City of Colmesneil owns the public water system, which draws from groundwater wells and serves 1,404 people through 536 service connections. Entergy Texas and Sam Houston Electric Cooperative report electric service in Tyler County, but that does not identify the electric line owner at every address. Before a conduit bore near Wheeler Avenue or the city water system, we confirm the owner and the required conduit specifications for that location.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Colmesneil | Public water system | Groundwater wells | 536 connections, 1,404 people served |
| Entergy Texas and Sam Houston Electric Cooperative | Electric utilities reporting service in Tyler County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Colmesneil’s median housing year at 1981; 30 percent of homes were built before 1960, 46 percent from 1960 to 1999 and 24 percent in 2000 or later. That mix can mean a route serves either replacement work or a newer connection along Pitzer Street. We hydrovac expose marked water and electric lines on the bore path before drilling near them, since surface marks do not show depth.

How far is Colmesneil from Jasper and the Yukon yard?
Colmesneil is an incorporated city in Tyler County, with an elevation of 275 feet and a land area of 2.0 square miles. ZIP code 75938 covers the city. Woodville, the county seat, is 9.3 miles south; Chester is 10.6 miles west, Ivanhoe is 15.9 miles south and Zavalla is 17.2 miles north. Jasper, the nearest larger city, is 25.4 miles east. The Yukon yard is 428 road miles away, an 8.7 hour drive, which affects mobilization for work near US 69 or Mill Branch.
Places near Colmesneil
- Directional boring in Woodville: 9.3 miles south
- Directional boring in Chester: 10.6 miles west
- Directional boring in Ivanhoe: 15.9 miles south
- Directional boring in Zavalla: 17.2 miles north
- Directional boring in Warren: 20.5 miles south
- Directional boring in Jasper: 25.4 miles east
Which jobs call for a bore in Colmesneil near Pitzer Street?
- US 69 crossing: A utility route beneath the highway needs a planned bore profile, required cover and an encased crossing under the travel lanes.
- Creek crossing: A route beneath Mill Branch avoids cutting its channel, with jurisdiction checked during planning.
- Water service: A connection near the City of Colmesneil groundwater system needs the water line owner and existing service route confirmed.
- Fiber route: A fiber bore along Wheeler Avenue can pass beneath the street surface rather than open cutting the full route.
- Street connection: A service bore near Pitzer Street needs marked utilities exposed before the drill approaches them.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Colmesneil bore near Wheeler Avenue?
For a Wheeler Avenue or Mill Branch estimate, give us the address or map pin, what is going in the ground, pipe or conduit size, footage, and any sketch or plans, so we can match the proposed line and crossing to the actual Colmesneil route before setting the drilling approach.
The price follows the work involved, with Colmesneil’s Doucette loamy sand and sandy clay loam affecting ground conditions and reaming. Crossings of US 69, Mill Branch or marked utilities can call for more planning, exposure work or equipment. Pavement, concrete, pits, excavator time and sand backfill also affect the scope. Logistics matter too: a job 428 road miles from Yukon has different mobilization needs than a short route near the main office. High profile or emergency timing can change the plan as well.
Questions people ask about boring in Colmesneil
Does Trinity take directional boring jobs in Colmesneil and Tyler County?
Yes. We take directional boring work in Colmesneil, and our own crews and vetted partner contractor crews handle the field work from satellite yards. You work with Trinity from the first call through the bore log, whether the route is near US 69 or on a local street.
Is rock mapped near the surface in Colmesneil?
Weathered bedrock is mapped within five feet across 29 percent of Colmesneil, but hard bedrock is not mapped at that depth. A route could encounter weathered material that slows drilling compared with soil. The USDA soil survey is a regional map, so the ground at a particular Wheeler Avenue address still needs site planning.
Who permits a directional bore beneath US 69 in Colmesneil?
TxDOT reviews a US 69 utility crossing through its Beaumont District. The utility owner submits the application in TxDOT’s online RULIS system, with our bore plan and profile for the proposed crossing. Required cover depends on the line type, and TxDOT may set a different depth in the permit.
Can a utility be bored beneath Mill Branch in Colmesneil?
A bore beneath Mill Branch can avoid cutting the stream channel, but the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Mill Branch runs 1.28 channel miles within Colmesneil, and the route also needs to account for marked utilities and suitable entry and exit areas.
Who runs Colmesneil’s public water system in Tyler County, and where does it get its water?
The City of Colmesneil owns the public water system, which uses groundwater wells. With 536 service connections and 1,404 people served, we plan Colmesneil underground work around existing service lines. For a bore near Wheeler Avenue, the water system’s known lines need to be located and exposed before the drill approaches.
Who owns electric lines in Colmesneil and Tyler County?
Entergy Texas and Sam Houston Electric Cooperative report electric service in Tyler County, but that does not establish the owner at a specific Colmesneil address. We confirm the line owner and conduit specifications for the route, then expose marked lines near streets such as Pitzer Street before drilling close to them.
How early should I call 811 for a bore on Wheeler Avenue in Colmesneil?
The person arranging a Wheeler Avenue bore should request locates through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For Colmesneil excavation in the TxDOT Beaumont District, we allow the Texas811 notice period of at least two working days. If marks wear off or move, request refreshed marks before work continues.
Does Colmesneil’s distance from Jasper change a directional boring job?
Jasper is 25.4 miles east of Colmesneil, while Trinity’s Yukon main office is 428 road miles away. That distance can affect mobilization for a job near US 69 or Mill Branch. The route, equipment, ground and crossing requirements still determine the work plan.
What affects the price of a directional bore under US 69 in Colmesneil?
The scope under US 69 depends on bore length, pipe or conduit size, ground conditions and required cover. Marked utilities that need exposure, pavement, pits and excavator time can also affect the work. A Mill Branch crossing or mobilization from Yukon adds different planning needs than a short bore on Pitzer Street.
Where the Colmesneil facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Colmesneil
- U.S. Census Bureau, TIGER/Line 2024: Colmesneil boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Colmesneil
- U.S. Census Bureau, American Community Survey 2019 to 2023: Colmesneil housing units and year built
- Macrostrat geologic map compilation: map units under Colmesneil
- U.S. EPA Safe Drinking Water Information System: public water systems serving Colmesneil
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Tyler County
- U.S. Geological Survey, Elevation Point Query Service: Colmesneil elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Colmesneil
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Colmesneil
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Colmesneil, Texas
Type the address of your job in Colmesneil. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Colmesneil
Same county: Wildwood. All counties: Texas county list.
