Chester Texas Directional Boring: Redco Clay, US 287 and Dry Creek
Quick Answer: On Main Street or beneath US 287, Trinity Boring Solutions provides directional boring, also called horizontal directional drilling (HDD), in Chester, Texas. Chester is 427 road miles from our Yukon, Oklahoma main office, and Yellow Jacket Drive is one of the town’s named streets. USDA maps show clay at 40 inches under 58 percent of the area, so sticky ground can load a reamer and grip pipe. Dry Creek crossings and the Main Street route are planned around marked utilities and access pits.
Chester bores at a glance
- Incorporated city in Tyler County, Texas. Population 273 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 427 miles, about 8.7 hours of driving.
- Ground: Woodville soil is mapped on 17 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 10 percent of the area.
- Highways inside the boundary: US 287, FM 1745 and FM 2097. State permit office: TxDOT Beaumont District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Dry Creek, Clear Creek and Russell Creek.
- Public water: Chester Water Supply Corporation, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring on Chester Main Street?
Trinity Boring Solutions takes directional boring work in Chester, where Main Street is the longest named street and US 287 runs through town. Main Street spans 4.34 miles, with Camden Road and Yellow Jacket Drive among the named routes in 14.62 public road miles. The Census Bureau Vintage 2024 estimate puts the town’s population at 273 in Tyler County. Water, sewer, gas, electric conduit and fiber can run along Main Street or beneath US 287.
Our main office is in Yukon, Oklahoma, and Chester work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. For a Main Street service or a crossing near Dry Creek, our work ranges from 3/4 inch service lines to 48 inch casing, with bores from 10 feet to 5,000 feet.

What ground should we expect near Woodville soil in Chester?
Woodville, Redco and Burkeville soils are among the mapped series in Chester, each covering 17 percent, 17 percent and 13 percent of the area. The USDA soil survey maps clay at 40 inches under 58 percent of Chester, with an average clay content of 43 percent at that depth. At the surface, clay and very fine sandy loam each cover 31 percent, while loamy sand covers 26 percent. These are mapped soil patterns, not readings from a specific bore route, so the exact alignment still needs field checks.
| USDA soil survey, inside the Chester city limits | What is mapped |
|---|---|
| Soil series mapped | Woodville 17 percent, Redco 17 percent, Burkeville 13 percent, Laneville 10 percent and Choates 9 percent |
| Texture at the surface | clay 31 percent, very fine sandy loam 31 percent and loamy sand 26 percent |
| Texture about 40 inches down | clay 58 percent, sandy clay loam 31 percent and loam 5 percent |
| Engineering class about 40 inches down | fat clay (CH) 38 percent, lean clay (CL) 30 percent and clayey sand (SC) 13 percent |
| Average clay content about 40 inches down | 43 percent |
| Bedrock mapped within 60 inches | 10 percent of the area (0 percent hard rock, 10 percent weathered rock) |
| Seasonal water table within 60 inches | 28 percent of the area |
| Flood prone soils | 17 percent of the area |
| High corrosion risk for uncoated steel | 77 percent of the area |
The USDA soil survey maps bedrock within 60 inches on 10 percent of Chester, identified as weathered bedrock; hard bedrock is not mapped in that depth range. Seasonal water tables are mapped within 60 inches on 28 percent, and flood prone soils cover 17 percent, so pits near Dry Creek may need water management and a depth plan below the channel. High steel corrosion risk is mapped on 77 percent. The Miocene Fleming Formation includes clay and sandstone, which can mean changing drilling conditions along a route.
How do we bore Chester clay soils?
We plan each Chester bore around the mapped clay, sandy loam and wet ground, rather than assuming one drilling setup suits every route. A path near Dry Creek also calls for attention to channel depth and access.
- In Chester’s mapped heavy clay, we use a thinner drilling fluid with polymer and open the hole in stages to limit sticky buildup on the reamer.
- Where Redco clay is heavy, we watch fluid returns along the bore so pressure does not lift pavement on a Main Street crossing.
- On Chester’s mapped loamy sand, we use staged reaming and prepare the pipe before the final pass so the hole is not left open unnecessarily.
- Near Dry Creek, where seasonal water tables and flood prone soils are mapped, we plan compact pits and pumping, and track depth and pitch as the bore advances.

Which roads and creeks, including Dry Creek, shape bores in Chester?
US 287 has 4.3 mapped roadway miles inside Chester, while FM 1745 has 1.2 and FM 2097 has 0.3. Those state routes can involve TxDOT right of way, so the route and road owner matter before setting pits. Main Street is the longest named street at 4.34 miles; Camden Road runs 0.56 miles and Yellow Jacket Drive 0.42 miles within town. A bore can pass beneath a road without cutting its pavement, with the planned route checked against marked utilities and available pit space.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 287 | US highway | 4.3 roadway miles inside | State highway office |
| FM 1745 | State highway | 1.2 roadway miles inside | State highway office |
| FM 2097 | State highway | 0.3 roadway miles inside | State highway office |
| Dry Creek | Stream | 0.56 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Clear Creek | Stream | 0.46 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Russell Creek | Stream | 0.28 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Vincent Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad track is mapped within Chester or within one mile outside its limits, so there is no mapped track crossing to plan for. Dry Creek has 0.56 channel miles in town, Clear Creek 0.46 and Russell Creek 0.28; four mapped street crossings intersect named streams. Vincent Creek is 0.2 miles outside the limits, and 0.73 miles of unnamed drainage are mapped in town. Creek crossings need channel depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
Who permits Chester bores near US 287?
In Chester, the city governs city streets such as Main Street, while TxDOT handles work in the US 287 right of way. US 287, FM 1745 and FM 2097 are state routes, and the TxDOT Beaumont District reviews utility permits for Tyler County. The utility owner, not the drilling contractor, submits the application through TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. TxDOT requires boring or tunneling beneath existing highway pavement, with casing and required cover set by the applicable rules or permit. A Dry Creek crossing also needs a jurisdiction check during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What utilities are in the ground in Chester, Tyler County?
Chester Water Supply Corporation is a groundwater based public water system with 472 service connections and a reported population served of 1,237. Entergy Texas and Sam Houston Electric Cooperative report electric service in Tyler County, but that does not establish which company owns a line at a particular Main Street address. Before an electric conduit bore, we confirm the line owner and conduit requirements for that location. Hydrovac potholing can expose marked water and electric lines before drilling near them.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Chester Water Supply Corporation | Public water system | Groundwater wells | 472 connections, 1,237 people served |
| Entergy Texas and Sam Houston Electric Cooperative | Electric utilities reporting service in Tyler County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Chester’s median housing year at 1969; 39 percent of homes were built before 1960, 53 percent from 1960 to 1999 and 8 percent in 2000 or later. Those ages make replacement routes along Camden Road worth checking, but they do not establish the age of any buried line. We pothole marked utilities before drilling near them because locate marks show position, not depth.

Do you cover Chester and nearby Pleasant Hill?
We serve Chester in Tyler County, where the town covers 1.57 square miles at an elevation of 252 feet and uses ZIP code 75936. Colmesneil is 10.6 miles east, Pleasant Hill is 12.7 miles northwest, and Corrigan is 14.5 miles west. Woodville, the county seat, is 14.6 miles southeast; Diboll, the nearest larger city, is 21.4 miles northwest. Chester is 427 road miles and an 8.7 hour drive from our Yukon, Oklahoma main office, which can affect mobilization for a job near US 287.
Places near Chester
- Directional boring in Colmesneil: 10.6 miles east
- Directional boring in Pleasant Hill: 12.7 miles northwest
- Directional boring in Corrigan: 14.5 miles west
- Directional boring in Woodville: 14.6 miles southeast
- Directional boring in Seven Oaks: 16 miles west
- Directional boring in Diboll: 21.4 miles northwest
What bores could serve Chester near Yellow Jacket Drive?
- Highway crossing: A conduit or water line beneath US 287 needs a route and pit plan that fits the TxDOT right of way.
- Water service: A service near Main Street can connect into a route coordinated with Chester Water Supply Corporation and its groundwater system.
- Fiber route: Fiber near Yellow Jacket Drive can be placed by bore to avoid opening the street surface along the planned alignment.
- Creek crossing: A bore beneath Dry Creek needs a channel depth plan and a check for U.S. Army Corps of Engineers jurisdiction.
- Street replacement: A sewer or water replacement along Camden Road can use a bore to pass beneath pavement while marked lines are exposed first.
- Drainage crossing: A route near Clear Creek or unnamed drainage needs pit placement and drilling depth planned around wet ground.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Chester quote near Main Street?
A map pin matters on Main Street because a route near Dry Creek or US 287 can change the crossing and access plan. Send the Chester address or pin, what will go in the ground, pipe or conduit size and footage. A sketch or plans help us check the path, nearby utilities and pit locations.
A short service route on Main Street with clear access is simpler to plan than a longer crossing near US 287 or Dry Creek. The price depends on footage, pipe or conduit size, Chester’s clay or sandstone conditions, utilities to expose, pavement, creek or drainage crossings, and pit or excavator needs. At 427 road miles from Yukon main office, we plan mobilization carefully for boring work in Chester. Near Dry Creek, emergency boring work can add planning demands, so we coordinate the schedule carefully.
Questions people ask about boring in Chester
Does Trinity take directional boring jobs in Chester, Tyler County, and how is the work staffed?
Yes, Trinity takes directional boring work in Chester and across Texas. Our main office is in Yukon, and Chester jobs are handled by our crews or crews from satellite yards run by drilling contractor partners we have vetted. You work with Trinity from the initial call through the bore log, including on a route near US 287.
Who owns electric lines in Chester, Tyler County, and who confirms conduit specifications?
Entergy Texas and Sam Houston Electric Cooperative report electric service in Tyler County, but the owner of a line at a Main Street address must be confirmed. We check the specific line owner and conduit requirements before planning an electric conduit bore. Chester Water Supply Corporation is a separate groundwater system, so its water lines also need to be located along the planned route.
Who controls Chester streets such as Yellow Jacket Drive, and does a bore require cutting one?
Yellow Jacket Drive is a city street because Chester is incorporated. A directional bore can pass beneath its pavement without an open cut, with pits placed off the travel surface where the site allows. If the route involves US 287 instead, TxDOT right of way rules and permit review apply.
Do Chester homes near Camden Road have older buried lines that may need replacement bores?
The American Community Survey 2019 to 2023 estimates give Chester a median housing year of 1969, with 39 percent of homes built before 1960. That does not date a particular water or sewer line, but it can make replacement work worth evaluating. Along Camden Road, we expose marked utilities before drilling near them.
Can groundwater or flood prone ground affect bore pits near Dry Creek in Chester?
It can. The USDA soil survey maps seasonal water tables within 60 inches on 28 percent of Chester and flood prone soils on 17 percent. Near Dry Creek, we plan pit placement and pumping for wet ground, and set a bore depth that stays below the channel where the crossing design calls for it.
Does Woodville soil in Chester corrode steel, and what pipe should a bore use?
The USDA soil survey maps high steel corrosion risk across 77 percent of Chester, including areas with Woodville soil. The line owner chooses suitable coatings for steel casing or tracer wire. HDPE is not affected by soil corrosion, but the pipe material for a Main Street bore depends on the line’s design and owner requirements.
How early should I request a Chester bore locate on Main Street, and what if marks change?
For a Main Street bore, Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For a US 287 boring, if the start slips more than 14 days past the original notice, we submit a new request. Before continuing a Main Street bore, we have worn or moved marks refreshed through Texas811.
How far is Chester from Yukon, and does nearby Diboll change mobilization?
Chester is 427 road miles and an 8.7 hour drive from our Yukon, Oklahoma main office. Diboll is 21.4 miles northwest of Chester, but the job’s distance from Yukon still affects mobilization. The route to a site near Diboll or US 287, along with access and equipment needs, helps shape the field plan.
What affects the price of a directional bore in Chester under US 287?
The work scope sets the price, including bore length, pipe or conduit size, clay or sandstone conditions, marked utilities to expose, pavement, pits and equipment time. A crossing beneath US 287 may involve TxDOT permit planning, while Dry Creek adds drainage and channel considerations. The distance from Yukon also affects mobilization; no single route factor determines the price.
Where the Chester facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Chester
- U.S. Census Bureau, TIGER/Line 2024: Chester boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Chester
- U.S. Census Bureau, American Community Survey 2019 to 2023: Chester housing units and year built
- Macrostrat geologic map compilation: map units under Chester
- U.S. EPA Safe Drinking Water Information System: public water systems serving Chester
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Tyler County
- U.S. Geological Survey, Elevation Point Query Service: Chester elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Chester
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Chester
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Chester, Texas
Type the address of your job in Chester. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Chester
Same county: Ivanhoe · Wildwood · Warren. All counties: Texas county list.
