trinityboringsolutions.com

Trinity Boring Solutions crew and directional boring equipment on an underground utility job

Newcastle, Oklahoma · Licensed and Insured · Since 1965

Directional Boring and Road Bore Contractor in Newcastle, Oklahoma

Trinity Boring Solutions Inc. does directional boring, directional drilling and road bores in Newcastle, Oklahoma for water, sewer, natural gas and propane, electric and fiber lines. We are family owned since 1965, in underground construction since 1982, and run our own crews and rigs out of 9102 Northwest Expy, Yukon, OK 73099. The phone at (405) 409-7423 is answered 24 hours a day.

HDD · Trenching · Hydro-Vac Water · Sewer · Gas · Electric · Fiber Residential · Commercial · Municipal 24/7 Emergency Utility Response
HoursOpen 24 hours
Rated5.0 stars (58 reviews)

Where Newcastle Sits and How Our Crews Get There

Newcastle covers about 62.5 square miles in northern McClain County, roughly 16 miles south of downtown Oklahoma City on Interstate 44, according to the City of Newcastle hazard mitigation plan. The Canadian River runs along the north and east sides of the city below bluffs of 50 to 80 feet, and Newcastle borders Oklahoma City, Norman, Goldsby, Blanchard, Bridge Creek and Tuttle.

Interstate 44 crosses the city, and parts of it are the H.E. Bailey Turnpike run by the Oklahoma Turnpike Authority. US 62 and US 277, State Highway 37, State Highway 130 and State Highway 76 carry most other traffic. As of November 2026, the Oklahoma Turnpike Authority has Portland Avenue closed between NW 24th Street and NE 34th Street through late 2027 for the new Toby Keith Expressway interchange at Interstate 44, US 62 and State Highway 37, so plan pit access around that work.

Our crews drive about 27 road miles from 9102 Northwest Expy in Yukon to Newcastle, roughly 40 minutes by way of Interstate 44. That is well inside our four hour range, so a Newcastle job can have a crew the same day.

Need a partner for utility work in Newcastle? Call (405) 409-7423.

How HDD, Trenching and Hydro-Vac Fit Newcastle

  • New and replacement water and sewer lines that must cross streets, driveways, and crowded utility corridors.
  • Fiber and telecom builds: backbone routes, laterals, and business drops across Newcastle neighborhoods and commercial corridors.
  • Primary and secondary electric, site lighting, and light pole circuits for shopping centers, schools, and industrial yards.
  • Irrigation mains and control wire for parks, medians, athletic fields, and large HOA common areas.
  • Long driveway and acreage crossings to shops, barns, and outbuildings without a trench scar across the whole property.

Where the approved plan calls for it, we use HDD under streets, highway right of way and long acreage driveways, trenching for open ground, and hydrovac to pothole existing lines before the drill head gets close.

For a plan that blends directional boring, trenching, and hydrovac on one Newcastle project, call now.

Directional Boring, Trenching and Hydro-Vac Services in Newcastle, OK

Here is how our directional boring contractors in Newcastle, OK and our trenching and hydrovac crews cover everything from one house service to full city and commercial utility builds.

Water and Sewer Lines

HDD and trenching for individual services and large mains: domestic water, fire lines, gravity sewer, force mains, and storm drains that must maintain grade across streets, alleys, and long drives.

Gas, Electric and Site Power

Directional boring and trenching for gas services, primary and secondary electric, generator feeds, and site lighting circuits serving shops, schools, commercial sites, and industrial yards.

Fiber, Telecom and Low Voltage

Multi duct telecom and fiber conduit banks, ISP and municipal fiber backbones, business and school laterals, and low voltage conduits installed via HDD, trenching, and hydrovac as needed.

Hydro-Vac and Slot Trenching

Hydrovac daylighting and potholing to expose existing utilities, soft dig around critical lines, and narrow slot trenching in congested or sensitive areas where a trencher is too risky.

If it involves underground utilities in Newcastle, we can quote a trenchless or mixed approach that fits the approved plan.

Directional Boring Service Area Map: Newcastle, Oklahoma

Newcastle is in McClain County, about 27 road miles from our office at 9102 Northwest Expy, Yukon, OK 73099. The phone is answered 24 hours a day, and crews leave from Yukon for scheduled and emergency work.

What We Need to Quote Any Newcastle Utility Job

  • Newcastle address or closest cross street or section line.
  • Utility type: water, sewer, storm, gas, electric, fiber, irrigation, lighting, or conduit bank.
  • Approximate start and end points, estimated distance, and whether it is services, mains, or both.
  • What we are crossing: city street, driveway, parking lot, easement, creek, or open ground.
  • Your timeline and whether it is 24/7 emergency work or planned construction.
  • Pipe size and material, such as HDPE for water or the PVC your sewer spec calls for.
  • Depth or slope the plan requires, and any rock, groundwater or creek you know about.
  • Room for a pit on each side of the crossing.
  • Plans, plan sheets or photos of both ends of the crossing.
  • Permit status and Okie811 locate status. The customer or general contractor pulls permits and handles traffic control, and we bore to the approved plan.

For a detailed plan, directional boring contractors in Newcastle, OK are a quick call away at (405) 409-7423.

Newcastle Soil and Geology: What It Means for Your Bore

The Oklahoma Geological Survey Oklahoma City South geologic map describes the Hennessey Formation, mapped across much of the ground south of Oklahoma City, as mostly a silty claystone or clayshale, with the Garber Sandstone below it. Along the Canadian River and the creek floodplains, the same map shows alluvium of sand, silt, clay and gravel. Two USDA soil series show the contrast: the Renfrow series is a very deep, well drained soil formed in clayey Permian shale with low saturated hydraulic conductivity, and the Eufaula series is a very deep, somewhat excessively drained sandy soil on stream terraces with rapid permeability. Check the soil mapped on your lot in the USDA NRCS Web Soil Survey.

The city's hazard mitigation plan lists expansive soils as a hazard for the whole planning area and names the creek basins that drain Newcastle, including Pond Creek through the city center and Stinson Creek south of Interstate 44.

How we handle Newcastle's red clay and sandy alluvium

  • Every crossing starts with an Okie811 ticket and hydrovac potholing to expose marked lines where the bore path crosses them.
  • We read the ground at the pits and on the pilot bore, then set tooling and drilling fluid to the soil we actually find rather than to a map.
  • In sandy terrace and floodplain ground near the Canadian River and the creeks, we watch fluid returns closely, because loose sand can let fluid escape and the hole wash out.
  • Under state highways, the ODOT utility permit requires the space around the pipe to be grouted when drilling fluid is used, so we plan for that on any state highway crossing.

Want to know how your specific Newcastle lot will bore? Call (405) 409-7423.

Permits, 811 Locates and Road Crossings in Newcastle, OK

The City of Newcastle has taken permit and contractor license applications through its MyGovernmentOnline (MGO) portal since December 6, 2023, according to the city's permits page. Applications go to the Planning and Community Development Department at 120 NE 2nd St, Newcastle, OK 73065, phone (405) 387-4508. Newcastle Public Works answers at (405) 387-4434, with an after hours line at (405) 387-5525. Newcastle Code Section 93.02 makes it unlawful to obstruct access to city streets and keeps the city's right of entry for its utilities, so confirm right of way requirements with the city before work starts. The customer or general contractor pulls the permits and handles traffic control; Trinity bores to the approved plan.

State highway crossings

Newcastle is served by Interstate 44, US 62 and US 277, State Highway 37, State Highway 130 and State Highway 76. State highway crossings need an ODOT Utility Permit for Federal or State Highways, issued to the utility owner or applicant. It calls for the top of the conduit to be at least 60 inches below the top of pavement and not less than 30 inches below the bottom of the ditches, allows drilling fluid only when the bore is at least 6 feet below the pavement, and does not allow HDPE or PVC lines under the highway without a steel or equivalent conduit. McClain County highways fall under ODOT Field District 3 in Ada. Where Interstate 44 is the H.E. Bailey Turnpike, a separate OTA License for Right of Way Access is required, with pipe at least 48 inches below subgrade and not less than 30 inches below the bottom of the ditches.

OKIE811 locates

Oklahoma law (Title 63, O.S. Section 142.1 et seq.) requires notice to OKIE811 at least 48 hours before digging, excluding the date of notification, Saturdays, Sundays and legal holidays, and the notice expires 14 calendar days from the excavation start date. Submit a request online at okie811.org or dial 811. Trinity calls in an Okie811 ticket on every crossing; see our Oklahoma 811 utility locating guide for what to expect.

Utilities serving Newcastle

Water and sewer belong to the City of Newcastle through Public Works, (405) 387-4434. Electric lines in Newcastle belong to both Oklahoma Electric Cooperative (OEC) and OG&E, so the locate ticket matters on every lot. Natural gas service comes from Oklahoma Natural Gas (ONG). Fiber, phone and cable lines belong to several providers, and OKIE811 notifies its member operators in the dig area. Newcastle counted 10,984 people in the 2020 Census and an estimated 15,198 in July 2025, per Census QuickFacts, and it is the largest city in McClain County (pop. 48,434, +16.3% since 2020), whose county seat is Purcell. The Oklahoma Turnpike Authority is building the Toby Keith Expressway, a new turnpike linking Interstate 44 near Newcastle with Interstate 35 in the Moore and Norman area.

Newcastle, OK Directional Boring and Underground Utility FAQs

Can you bore long driveway crossings on Newcastle acreage?

Yes. A long driveway, shop or barn crossing on acreage is routine directional boring work. We bore under the drive and yard from one pit to another, so the surface stays intact and there is no trench scar across the property. Single shots run from 10 feet to just under 4,000 feet, with longer runs bored in sections.

Do you bore under Interstate 44 and Newcastle arterials?

Yes, once the crossing is permitted. City streets go through Newcastle Planning and Community Development, state highways need an ODOT utility permit, and turnpike sections of Interstate 44 need an Oklahoma Turnpike Authority license. The customer or general contractor pulls those permits and handles traffic control, and we bore to the approved plan, with steel casing where the permit calls for it.

Do you handle commercial and casino district work in Newcastle?

Yes. We bore water, sewer, natural gas, electric, fiber and site lighting conduit for commercial sites in Newcastle, working for the owner, the general contractor or the utility contractor. Send the plan sheets, the crossing lengths and the pipe sizes, and we will price each bore on its own conditions as a lump sum.

Do you offer 24/7 emergency boring in Newcastle?

Yes. The phone at (405) 409-7423 is answered around the clock, and Newcastle is about 27 road miles from our Yukon office, so an emergency crew for a broken water line, a gas line or damaged conduit can reach you the same day. For a problem on a city water or sewer main, call Newcastle Public Works first at (405) 387-4434.

Can you install utilities for new Newcastle subdivisions?

Yes. We bore and trench water, sewer, gas, electric and fiber for new subdivisions. Water goes in HDPE, and sewer goes in the PVC the job spec calls for. Newcastle grew from 10,984 people in the 2020 Census to an estimated 15,198 in 2025, according to the Census Bureau.

How much does directional boring cost per foot in Newcastle, Oklahoma?

There is no flat footage rate. A Newcastle bore is priced on its conditions: soil and rock, pipe size, length, what it crosses, grade, existing utilities, depth and access. Red clay uplands and sandy ground near the Canadian River call for different tooling and drilling fluid. A short driveway crossing is usually priced as one job. Send the details and we will quote a lump sum. Call (405) 409-7423.

What does horizontal boring cost in Newcastle, OK?

Horizontal boring is priced on the job, not on a set rate. Longer shots, larger pipe, road crossings that need steel casing, rock and tight pit space all add work. A lump sum quote needs the address, the utility, pipe size and material, length, depth, what you are crossing, and your permit and locate status. Call (405) 409-7423 to start a quote.

How do I install a water line under my driveway in Newcastle without digging it up?

Directional boring is the usual way. We set a pit on each side, drill a pilot hole under the driveway, ream it to size and pull the new water line back through, usually HDPE, without cutting the concrete or asphalt. Okie811 locates and hydrovac potholing come first so we know where existing lines are. Call (405) 409-7423 to schedule a driveway bore in Newcastle.

Can you repair or replace a water line in Newcastle, OK without digging a trench?

Yes. We bore a new HDPE water line under the yard, driveway or landscaping and connect it at each end, so you avoid a trench across finished surfaces. That matters on Newcastle's clay, since the city lists expansive soils as a hazard across its planning area. City water service questions go to Newcastle Public Works at (405) 387-4434. Call Trinity at (405) 409-7423 to talk through your line.

Do you do trenchless sewer line installation in Newcastle?

Yes. We bore sewer laterals and mains in Newcastle in the PVC the job specifies, holding the slope the plan requires. Gravity sewer needs grade, so depth and fall are set before we drill. City sewer service is handled by Newcastle Public Works at (405) 387-4434, and permits go through the city's MyGovernmentOnline portal, pulled by the owner or contractor. Call (405) 409-7423 for a sewer bore quote.

Do you offer trenchless utility services throughout McClain County, Oklahoma?

Yes. We work across McClain County, including Newcastle, Blanchard, Goldsby, Washington, Wayne and Purcell, the county seat. Tuttle borders Newcastle but sits in Grady County, and we cover it too. McClain County grew about 16 percent from the 2020 Census to an estimated 48,434 residents in 2024. See our McClain County directional boring page or call (405) 409-7423.

Who does directional boring in Newcastle, Oklahoma?

Trinity Boring Solutions Inc. is a family owned directional boring contractor founded in 1965 and in underground construction since 1982, with its own crews and rigs out of Yukon, about 27 road miles from Newcastle. We bore water, sewer, natural gas and propane, electric and fiber lines for homeowners, builders, general contractors and utilities. Call (405) 409-7423, answered 24 hours a day.

How does Newcastle's soil affect directional boring?

Newcastle has two kinds of ground that bore differently. Uplands sit on Hennessey Formation claystone and clayshale with red clay soils such as the Renfrow series, which hold a hole well but are sticky and slow to drain. Floodplains along the Canadian River and the creeks carry sandy alluvium and terrace sand, such as the Eufaula series, where fluid can escape and the hole can wash out. We set tooling and drilling fluid to what the pits show.

How deep does a bore need to be under Interstate 44 or a state highway in Newcastle?

Under ODOT's utility permit for state highways, the top of the conduit should be at least 60 inches below the top of pavement and not less than 30 inches below the bottom of the ditches, and drilling fluid is allowed only 6 feet or more below the pavement. On turnpike sections of Interstate 44, the OTA license calls for pipe at least 48 inches below subgrade. The customer or general contractor pulls these permits, and we bore to the approved plan.

Is an OKIE811 locate required before boring in Newcastle, OK?

Yes. Oklahoma law requires notice to OKIE811 at least 48 hours before boring, not counting the day of notice, weekends or legal holidays, and the notice expires 14 calendar days from the start date. Submit it online at okie811.org or dial 811. Trinity calls in an Okie811 ticket on every crossing and potholes marked lines with hydrovac before drilling. Call (405) 409-7423 with questions.

Do you do gas line installation in Newcastle, OK?

Yes. We bore natural gas and propane lines in Newcastle for plumbers, gas contractors, builders and owners, including service lines to homes, shops and generators. Oklahoma Natural Gas serves Newcastle, so connections to its system follow the utility's own requirements. Gas lines are an emergency category on our phone, answered around the clock at (405) 409-7423. More on our gas line services page.

Who do I call for a water or sewer line problem in Newcastle?

For a city water main, meter or sewer main problem, call Newcastle Public Works at (405) 387-4434, or (405) 387-5525 after hours. If the problem is on your side of the meter or cleanout, a plumber or a bore crew can replace the line without trenching the yard. We bore replacement water and sewer lines in Newcastle; call (405) 409-7423.

How deep are utility lines buried in Newcastle?

There is no single depth. Each utility sets its own depth, grading changes cover over time, and the state highway permit only sets cover for new crossings, such as at least 60 inches below the pavement under the ODOT utility permit. That is why we pothole marked lines with hydrovac to see their real depth before drilling. Our utility depth and potholing guide covers it in more detail.

Do I need a permit to bore under a road in Newcastle?

In most cases, yes. City streets and right of way go through the Newcastle Planning and Community Development Department and its MyGovernmentOnline portal. State highways such as US 62 and State Highway 37 need an ODOT utility permit, and turnpike right of way needs an OTA license. The customer or general contractor pulls the permit and handles traffic control, and Trinity bores to the approved plan. See our road and highway utility work page.

What is jack and bore, and when is it used in Newcastle?

Jack and bore pushes a steel casing under a road or rail line with an auger boring machine while the auger removes the soil inside it. The ODOT utility permit requires HDPE and PVC lines under state highways to be inside steel or equivalent conduit, and when steel casing goes into loose, cohesionless ground it must advance along with the bore. More on our jack and bore page.

Is calling 811 free in Oklahoma?

Yes. A locate request to OKIE811, by dialing 811 or online at okie811.org, costs the person digging nothing, as Oklahoma Natural Gas notes on its safety page. Notice is due at least 48 hours ahead, not counting the day of notice, weekends and legal holidays. If you hire a contractor, the contractor is responsible for contacting OKIE811.

Get a Directional Boring Quote in Newcastle, Oklahoma

Whether you are running one new service to a house, building a fiber route, powering a business park, or helping the city upgrade mains, Trinity Boring Solutions can quote a mix of HDD, trenching and hydrovac that fits your Newcastle project. Call our Yukon base at 9102 Northwest Expy, Yukon, OK 73099 any time, day or night.

Directional Boring in Newcastle, OK HDD · Trenching · Hydro-Vac Residential, Commercial and Municipal 24/7 Emergency Boring

Free Bore Planner

Plan Your Bore in Newcastle, Oklahoma

Type the address of your job in Newcastle. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Quick Answer: Directional boring in Newcastle, OK installs water, sewer, gas, electric and fiber lines under roads, driveways and yards without open cuts. Trinity Boring Solutions sends its own crews from Yukon, about 27 road miles away, for scheduled work and around the clock emergencies. Send plan sheets or site photos for a quote. Call (405) 409-7423.

Directional boring in Newcastle, answered in one paragraph. Trinity Boring Solutions is a family owned horizontal directional drilling contractor based in the Oklahoma City metro since 1965. We install water, sewer, natural gas, electric and fiber lines under roads, driveways, parking lots, creeks and existing utilities across Newcastle and the rest of Oklahoma, with one crew handling Okie811 locates, hydrovac potholing, the bore, pullback and pit restoration. Call (405) 409-7423, answered 24 hours a day.

Trinity Boring Solutions at a glance

  • Serves Newcastle. About 27 road miles and roughly 40 minutes from our office at 9102 Northwest Expy, Yukon, OK 73099, so a Newcastle job can have a crew the same day.
  • Since 1965. Family owned. Dean Rice started the company in 1965 as an irrigation contractor, and it has done underground construction since 1982. Today Trinity is a directional boring contractor serving Oklahoma and Texas.
  • Oklahoma City metro based. Headquartered at 9102 Northwest Expy, Yukon, OK 73099, in the Oklahoma City metro. Crews and rigs cover all 77 Oklahoma counties and all of Texas, from Dallas, Fort Worth and Plano down to Houston. Jobs within about four hours of Yukon can have a crew the same day.
  • Owns its equipment. Vermeer and Ditch Witch HDD rigs, auger boring machines and hydrovac trucks, all owned outright and run by Trinity operators.
  • One crew, whole job. 811 locates and hydrovac potholing, horizontal directional drilling, auger boring with steel casing, trenching, backfill and pit restoration from the same company, so there is no handoff between a locator, a driller and an excavator.
  • Range. 3/4 inch service lines to 48 inch pipe, and bores from 10 feet to just under 4,000 feet in a single shot, with longer runs bored in sections, for water, sewer, natural gas and propane, electric and fiber.
  • Named work. A single shot just under 4,000 feet under the Arkansas River; a 48 inch HDPE water intake line out to the middle of Fort Cobb Lake; a bore beneath the John Kilpatrick Turnpike in Oklahoma City (watch the video); 840 feet of FAA conduit under runways at Will Rogers World Airport; 385 foot sandstone rock bore under creeks, a wetland and a dam in Guthrie; 6 inch PVC sleeve under NE 24th Street and a live water main at the Clara Luper Center; propane line on a hospital campus in Anadarko; emergency water line at a Stillwater sorority house.
  • Pricing. No per foot rate. A bore is priced on its conditions: soil and rock, pipe size, what it crosses, grade, existing utilities, depth and access. How a bore is priced.
  • Safety. An Okie811 ticket in Oklahoma, a Texas811 ticket in Texas, and hydrovac potholing on every crossing.
  • 24 hour phone. (405) 409-7423 is answered around the clock, with emergency crews for gas and water lines.

Newcastle is part of McClain County, Oklahoma, about 27 road miles from our Yukon office. The city counted 10,984 people in the 2020 Census, and its homes, farms and businesses depend on underground utility work that avoids tearing up streets and yards. Trinity Boring Solutions brings drill rigs, locating support and hydrovac trucks to Newcastle year round. Call (405) 409-7423 for a bore quote.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to just under 4,000 feet in a single shot, with longer runs bored in sections, 3/4 inch service line through 48 inch pipe, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Newcastle

State: Oklahoma directional boring. All counties: Oklahoma county list. Oklahoma and Texas: directional boring service area.

Nearby Service Areas in McClain County

Trinity Boring Solutions also provides directional boring and underground utility services near Newcastle in: Blanchard · Dibble · Purcell · Rosedale. Call (405) 409-7423 for a quote.