East Mountain Texas Directional Boring: Bowie Fine Sandy Loam, FM 1844, Loden Branch
Quick Answer: FM 1844 is a key route to plan around, and Trinity Boring Solutions takes directional boring work in East Mountain, Texas, also called horizontal directional drilling (HDD). Loden Branch and the other mapped streams call for a route that protects the channel and banks. East Mountain is 331 road miles from our Yukon, Oklahoma main office, with Medlin Road among the local routes to consider for access. Bowie fine sandy loam covers 35 percent of the mapped area; deeper sandy clay loam can hold the hole and grip the pipe.
East Mountain bores at a glance
- Incorporated city in Upshur County, Texas. Population 964 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 331 miles, about 6.5 hours of driving.
- Ground: Bowie soil is mapped on 35 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 1 percent of the area.
- Highways inside the boundary: FM 1844, Texas State Highway 300, FM 1845, FM 3358 and FM 726. State permit office: TxDOT Atlanta District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Loden Branch, Bog Creek, Hawkins Creek and Hawkins Branch.
- Public water: City of East Mountain, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Medlin Road in East Mountain?
Trinity Boring Solutions takes directional boring work in East Mountain, including routes along Medlin Road in Upshur County. FM 1844 is a state highway to plan around when setting the bore route. The Census Bureau Vintage 2024 estimate puts the city population at 964. We install water, sewer, gas, electric conduit and fiber where service routes meet local streets or connect to properties.
Our main office is in Yukon, Oklahoma, and East Mountain work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A short 3/4 inch service line near Medlin Road is at the small end of our work; a long bore with 48 inch casing is at the large end. We are a family business started in 1965, with directional boring since 1982, and stay involved from the first call through the bore log.

What is Bowie soil like to bore in East Mountain?
The USDA soil survey maps Bowie fine sandy loam across 35 percent of East Mountain, with Cuthbert fine sandy loam on 23 percent and Kirvin gravelly fine sandy loam on 13 percent. At about 40 inches below the surface, sandy clay loam is mapped under 69 percent of the city; clay loam and clay are also mapped there. Average clay content at that depth is 31 percent. These are mapped soil patterns, not test borings, so the route still needs field checks.
| USDA soil survey, inside the East Mountain city limits | What is mapped |
|---|---|
| Soil series mapped | Bowie 35 percent, Kirvin 26 percent, Cuthbert 24 percent, Lilbert 6 percent and Ruston 3 percent |
| Texture at the surface | fine sandy loam 65 percent, gravelly fine sandy loam 14 percent and very fine sandy loam 12 percent |
| Texture about 40 inches down | sandy clay loam 69 percent, clay loam 15 percent and clay 13 percent |
| Engineering class about 40 inches down | lean clay (CL) 55 percent, clayey sand (SC) 30 percent and fat clay (CH) 13 percent |
| Average clay content about 40 inches down | 31 percent |
| Bedrock mapped within 60 inches | 1 percent of the area (0 percent hard rock, 1 percent weathered rock) |
| Seasonal water table within 60 inches | 37 percent of the area |
| Flood prone soils | 2 percent of the area |
| High corrosion risk for uncoated steel | 48 percent of the area |
Bedrock is mapped in only 1 percent of the area within 60 inches, so it is not mapped in the top five feet across most routes. Seasonal water tables occur within 60 inches in 37 percent of the area, while flood prone soils cover 2 percent. High steel corrosion risk is mapped across 48 percent, a reason to have the line owner consider casing and tracer wire materials. The geologic map includes Quartz Sand Decomposition Residuum of Cenozoic age and Queen City Sand of Eocene age. Wet pits need management, and the line owner chooses steel coatings.
What does it take to bore East Mountain sandy clay loam?
East Mountain has sandy clay loam mapped at about 40 inches and fine sandy loam near the surface. We match the fluid and reaming plan to the route and the soil rather than treating every Medlin Road bore alike.
- At a Medlin Road route, we expose each marked utility with hydrovac before drilling near it, since the locate marks show position but not depth.
- Where sandy clay loam is mapped at about 40 inches, we use thinner fluid with polymer and ream in stages to manage sticky cuttings.
- In the fine sandy loam mapped near the surface, we build a supportive fluid wall and have the pipe ready before the final ream.
- We track the drill head from the surface and log depth and pitch, adjusting the plan for wet ground near Loden Branch.

Which roads, tracks or creeks affect East Mountain bores near Loden Branch?
FM 1844, Texas State Highway 300, FM 1845, FM 3358 and FM 726 run inside East Mountain, so a route may involve state highway right of way as well as city streets. Medlin Road is the longest named street in the city at 2.41 miles. Main Street runs 1.62 miles, while Mountain South and Mountain Road each run 1.59 miles. A bore can pass beneath pavement without cutting it, but the entry and exit pits still need room on the selected route.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 1844 | State highway | 3.5 roadway miles inside | State highway office |
| Texas State Highway 300 | State highway | 3.1 roadway miles inside | State highway office |
| FM 1845 | State highway | 2.8 roadway miles inside | State highway office |
| FM 3358 | State highway | 1.8 roadway miles inside | State highway office |
| FM 726 | State highway | 1 roadway miles inside | State highway office |
| Loden Branch | Stream | 0.49 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Bog Creek | Stream | 0.25 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Hawkins Creek | Stream | 0.21 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Hawkins Branch | Stream | 0.1 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Grace Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Clear Branch | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Moody Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Buckholts Branch | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad tracks are mapped inside East Mountain or within one mile outside the limits, and no mapped street and rail crossings appear in the city. Loden Branch runs 0.49 channel miles inside the limits; Bog Creek, Hawkins Creek and Hawkins Branch are also mapped. Public mapping shows seven street crossings of named streams. With Loden Branch inside city limits, we confirm no lakes or ponds are mapped within one mile before planning a bore. A creek route is checked for federal jurisdiction during planning, and the bore plan must account for the channel and banks.
Who approves an East Mountain bore under FM 1844?
FM 1844 is a state highway, so TxDOT reviews utility work in its right of way through the Atlanta District, which covers Upshur County. The utility that owns the line submits the application through TxDOT’s online RULIS system; we prepare the bore plan and profile and work under the owner’s permit. The same state process applies to Texas State Highway 300, FM 1845, FM 3358 and FM 726. Because East Mountain is incorporated, we treat Main Street as a city street when planning a bore. No railroad crossing is mapped in the city; a Loden Branch crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities should we check in East Mountain and Upshur County?
The City of East Mountain public water system draws from groundwater wells and lists 779 service connections serving 2,331 people. A route near Medlin Road may need to account for those water lines, but the specific line location still needs confirmation. Electric utilities reporting service in Upshur County are Southwestern Electric Power, Upshur Rural Electric Cooperative and Wood County Electric Cooperative. We confirm the line owner for the address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of East Mountain | Public water system | Groundwater wells | 779 connections, 2,331 people served |
| Southwestern Electric Power, Upshur Rural Electric Cooperative and Wood County Electric Cooperative | Electric utilities reporting service in Upshur County | EIA Form 861 | Confirm the line owner by address |
We use East Mountain’s 1994 median housing year as context when planning underground work, then verify site conditions at each crossing. We plan around East Mountain’s housing age mix: 13 percent before 1960, 46 percent from 1960 to 1999 and 41 percent in 2000 or later, while checking underground conditions. A Medlin Road project could involve either replacement work or a newer service, so we hydrovac expose every marked utility on the bore path before drilling near it. Locate paint shows position, not depth.

Do you cover East Mountain and nearby Warren City?
East Mountain is an incorporated city in Upshur County, with 99 percent of its area in that county and an elevation of 401 feet. It covers 2.12 square miles and includes ZIP codes 75645, 75647 and 75604. Union Grove is 3.4 miles west; Warren City is 3.6 miles southwest; White Oak is 3.9 miles south. Gilmer, the county seat, is 11.3 miles northwest. Our Yukon, Oklahoma yard is 331 road miles away, a 6.5 hour drive, which is part of planning crew mobilization for a Medlin Road or FM 1844 project.
Places near East Mountain
- Directional boring in Union Grove: 3.4 miles west
- Directional boring in Warren City: 3.6 miles southwest
- Directional boring in White Oak: 3.9 miles south
- Directional boring in Clarksville City: 4.1 miles southwest
- Directional boring in Gladewater: 6 miles southwest
What kinds of bores come up along East Mountain South?
- Highway crossing: A bore beneath FM 1844 keeps the line below the road surface and is planned for TxDOT right of way.
- Water service: A connection near Medlin Road is routed with the City of East Mountain groundwater system and marked lines in mind.
- Fiber drop: A fiber route along Mountain South can pass beneath pavement while entry and exit pits stay off the traveled surface.
- Creek crossing: A route near Loden Branch is planned around the channel, with federal jurisdiction checked during planning.
- Street connection: A bore near Main Street can link a service without open cutting the street pavement.
- Conduit route: An electric conduit near FM 1845 starts with confirming the line owner and exposing marked utilities.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near East Mountain Mountain Road?
A map pin matters on Mountain Road because the exact lot and route determine whether the bore approaches a street, FM 1844 or a drainage crossing. For a crossing near FM 1844, send us the address or pin, what is going in the ground, pipe or conduit size, and footage. A sketch or plans help us lay out the route and the entry and exit pits.
A short route in Bowie fine sandy loam with clear access is simpler to plan than a long bore through sandy clay loam. Price depends on footage, pipe size, soil, utilities to expose, pavement, drainage crossings and pit or excavator needs. A Loden Branch crossing or work under FM 1844 adds route planning. Mobilization also reflects the 331 road miles from Yukon; emergency or high profile work can add requirements.
Questions people ask about boring in East Mountain
Does Trinity Boring Solutions take East Mountain directional boring jobs in Upshur County?
Yes. We take directional boring and horizontal directional drilling work in East Mountain and staff it with our own crews or crews from vetted partner contractors. Our Yukon main office is 331 road miles away, so crew mobilization is considered for a route near FM 1844. For a Hawkins Creek crossing, we coordinate through the bore log with whichever crew is on site.
Does Bowie soil in East Mountain corrode steel, and what pipe can I use?
The USDA soil survey maps high steel corrosion risk across 48 percent of East Mountain, including mapped Bowie soil areas. The line owner should consider casing and tracer wire materials for the actual route. We account for East Mountain’s fine sandy loam, and HDPE is not subject to that soil corrosion concern. A soil survey is not a site test, so the specific material choice belongs with the line owner.
What ground does a bore pass through in East Mountain Bowie soil?
The USDA soil survey maps Bowie fine sandy loam across 35 percent of East Mountain, with sandy clay loam under 69 percent of the area at about 40 inches. Average clay content at that depth is 31 percent. That clay can stick to the reamer and grip pipe, while the fine sandy surface layer may need fluid support to keep the hole open.
Will a bore in East Mountain hit rock near Loden Branch?
Bedrock is not mapped in the top five feet across most of East Mountain, though the map does not rule out rock at greater depth. The geologic map shows Quartz Sand Decomposition Residuum and Queen City Sand. A route near Loden Branch still needs field observation, since mapped geology does not establish the exact conditions under a particular bore.
Who approves a bore beneath FM 1844 in East Mountain?
TxDOT’s Atlanta District reviews work in FM 1844 right of way because the highway is in Upshur County. The utility that owns the line files the application in TxDOT’s RULIS system. We prepare the bore plan and profile and work under the permit issued to that utility owner. The permit governs the approved crossing details.
Can a line be bored under Loden Branch in East Mountain?
A line can be planned beneath Loden Branch, which has 0.49 channel miles within East Mountain. For crossings near Bog Creek, we check US Army Corps of Engineers jurisdiction during planning. The route and depth must account for the channel and banks, and the ground conditions along the selected crossing need to be checked before drilling.
How far is East Mountain from Yukon if my project is near White Oak?
From our Yukon, Oklahoma main office, we cover 331 road miles to East Mountain, about a 6.5 hour drive. White Oak is 3.9 miles south of East Mountain, so a job near that side of town still needs mobilization planning from Yukon. We can discuss access and the bore route using the address or map pin.
How early should I call Texas811 for a bore near East Mountain Medlin Road?
For a Medlin Road bore, submit the Texas811 locate request at least 48 hours before excavation begins, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days after the original notice, make a new request. On an FM 1845 crossing, we have worn or moved marks refreshed through Texas811 before work continues.
What affects the price of directional boring near East Mountain FM 1844?
The route length, pipe size, soil, marked utilities, pavement, pits and any creek crossing all affect the price. A bore beneath FM 1844 needs right of way planning, while sandy clay loam or Loden Branch can add drilling or crossing demands. Mobilization from the Yukon office also matters because East Mountain is 331 road miles away.
Where the East Mountain facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside East Mountain
- U.S. Census Bureau, TIGER/Line 2024: East Mountain boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: East Mountain
- U.S. Census Bureau, American Community Survey 2019 to 2023: East Mountain housing units and year built
- Macrostrat geologic map compilation: map units under East Mountain
- U.S. EPA Safe Drinking Water Information System: public water systems serving East Mountain
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Upshur County
- U.S. Geological Survey, Elevation Point Query Service: East Mountain elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to East Mountain
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in East Mountain
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in East Mountain, Texas
Type the address of your job in East Mountain. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for East Mountain
Same county: Gilmer · Big Sandy · Ore City. All counties: Texas county list.
