Quick Answer: State Highway 36 is the main road crossing to plan around, and Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Flat, Texas. The mapped community is 340 road miles from our Yukon, Oklahoma main office, so a bore near FM 931 needs its access and mobilization planned. Eckrant soil is common here, and shallow bedrock can slow the drill. Preachers Creek is 0.8 miles from the community boundary.
Flat bores at a glance
- Unincorporated community in Coryell County, Texas. Population 157 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 340 miles, about 6.7 hours of driving.
- Ground: Eckrant soil is mapped on 29 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 85 percent of the area.
- Highways inside the boundary: Texas State Highway 36 and FM 931. State permit office: TxDOT Waco District.
- Railroad track inside the boundary: none mapped.
- Public water: Flat Water Supply Corporation, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Flat and State Highway 36?
We take directional boring work in Flat, an unincorporated community in Coryell County. The Census Bureau counted 157 people here in 2020; it does not publish yearly estimates for unincorporated places. Along State Highway 36, FM 931 and County Road 334, we can bore water, sewer, gas, electric conduit or fiber routes while leaving the road surface uncut.
Our main office is in Yukon, Oklahoma, and Flat work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that began in 1965 and has done directional boring since 1982. Our record of no utility strike in over 25 years matters around Flat Water Supply Corporation lines and electric service reported in Coryell County.

What is Flat soil like to bore through near Eckrant?
The USDA soil survey maps Eckrant as the leading soil series in Flat, covering 29 percent of the mapped area. Eckrant very cobbly silty clay, on 1 to 5 percent slopes, accounts for 24 percent. At about 40 inches below the surface, the survey maps bedrock across 64 percent of the area and silt loam across 20 percent. Silty clay makes up 37 percent of surface texture, while very cobbly silty clay covers 24 percent. These are mapped patterns, not measurements from a bore site.
| USDA soil survey, inside the Flat mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Eckrant 29 percent, Real 22 percent, Denton 20 percent, Krum 9 percent and Doss 7 percent |
| Texture at the surface | silty clay 37 percent, gravelly clay loam 26 percent and very cobbly silty clay 24 percent |
| Texture about 40 inches down | bedrock 64 percent, silt loam 20 percent and silty clay 15 percent |
| Engineering class about 40 inches down | lean clay (CL) 20 percent and fat clay (CH) 15 percent |
| Average clay content about 40 inches down | 36 percent |
| Bedrock mapped within 60 inches | 85 percent of the area (55 percent hard rock, 30 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 46 percent of the area |
Bedrock is mapped within 60 inches across 85 percent of Flat, including hard bedrock across 55 percent and weathered bedrock across 30 percent. Typical depth is 25 inches, so a route may meet rock early and need slower drilling or rock tooling. The survey maps no seasonal water table within 60 inches and no flood prone soils. High steel corrosion risk covers 46 percent, a concern for uncoated steel casing or tracer wire; HDPE is not subject to that concern. The mapped Stony Calcareous Clay Solution Residuum is Cenozoic, and Walnut Clay is Albian.
How do we drill Flat ground with shallow bedrock?
Eckrant silty clay and shallow mapped bedrock call for a controlled bore, not a rushed pull. On Flat routes, we track the head, watch the returns and adjust when the bit reaches rock.
- With Flat’s silty clay, we use fluid and polymer suited to sticky ground, ream in stages and plan to pull pipe the day the hole opens.
- Where cobbly Eckrant soil may deflect the head, we check depth and pitch at each rod and track the route with a walkover locator.
- Since bedrock is mapped within 60 inches across much of Flat, we slow the approach at soil to rock changes and use rock tooling if needed.
- Along State Highway 36, we control fluid returns beneath pavement and keep pits in the dirt outside the travel lanes.

What does a Flat bore have to cross near Preachers Creek?
Texas State Highway 36 and FM 931 run inside the mapped community boundary, with 2.6 roadway miles of the former and 1.5 of the latter mapped there. A utility crossing beneath either highway needs a bore plan that fits the road and its right of way. The named streets include State Highway 36, County Road 334, County Road 329 and County Road 330. We can place pits off the pavement and steer beneath the road rather than cut across it.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 36 | State highway | 2.6 roadway miles inside | State highway office |
| FM 931 | State highway | 1.5 roadway miles inside | State highway office |
| Preachers Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Flat or within 1 mile outside the community boundary, so no local track crossing is identified in these records. Preachers Creek is 0.8 miles outside the boundary; no named stream is mapped inside, and no street crossing of a named stream is mapped there. Unnamed drainage accounts for 0.82 miles inside the community. No lakes or ponds are mapped within 1 mile. A proposed creek crossing still needs its channel and jurisdiction reviewed during planning.
Who approves a Flat bore in Coryell County?
Flat is unincorporated, so it has no city government to approve its streets; county roads and state highways fall to their respective authorities. For work in the right of way of Texas State Highway 36 or FM 931, TxDOT requires a utility permit. The line owning utility files in TxDOT’s online RULIS system, and the Waco District reviews it. We prepare the bore plan and profile for the utility owner and work under its permit. Under State Highway 36, required cover depends on the line: electric and communication need 60 inches at a crossing, water needs 60 inches, and pressurized sewer needs 60 inches. A Preachers Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near Flat Water Supply Corporation?
Flat Water Supply Corporation serves 180 people through 210 service connections using purchased surface water. That system is a key line owner to identify before planning a water bore near County Road 334. Electric service providers reporting in Coryell County include Oncor Electric Delivery Company, Texas-New Mexico Power, Hamilton County Electric Cooperative Association, Heart of Texas Electric Cooperative and United Electric Cooperative Service. We confirm the line owner before a conduit bore rather than assuming one provider serves every Flat address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Flat Water Supply Corporation | Public water system | Surface water bought from another system | 210 connections, 180 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, Hamilton County Electric Cooperative Association, Heart of Texas Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Coryell County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates put Flat’s median housing year at 1992, with all 100 percent of reported housing units built from 1960 to 1999. That can mean a project replaces an existing service as well as adding a new one. Before the drill nears any marked utility, we expose it with hydrovac potholing because paint shows position, not depth. For a proposed bore along County Road 330, we would pothole marked lines on its path before drilling close to them.

What is near Flat, including Mound?
Flat is an unincorporated community in Coryell County, at an elevation of 845 feet and covering 0.98 square miles. Its ZIP code is 76528. Mound is 3.1 miles north; South Mountain is 9.6 miles north; Oglesby is 10.1 miles northeast; Gatesville is 11.5 miles northwest; and McGregor is 13.9 miles northeast. Gatesville is the county seat and nearest larger city. Flat is 340 road miles and a 6.7 hour drive from our Yukon, Oklahoma main office, which is part of planning crew and equipment mobilization.
Places near Flat
- Directional boring in Mound: 3.1 miles north
- Directional boring in South Mountain: 9.6 miles north
- Directional boring in Oglesby: 10.1 miles northeast
- Directional boring in Gatesville: 11.5 miles northwest
- Directional boring in McGregor: 13.9 miles northeast
What would we bore near Flat County Road 329?
- Highway crossing: A water or conduit bore beneath Texas State Highway 36 keeps the pavement intact and follows the permitted cover plan.
- Water service: A service route near Flat Water Supply Corporation can connect along County Road 334 after the line owner and existing utilities are checked.
- Fiber drop: A fiber conduit bore along FM 931 can avoid an open cut through the road surface.
- Drainage crossing: A proposed bore near Preachers Creek needs a route beneath the channel and a jurisdiction check during planning.
- Roadside service: A bore near County Road 329 can carry water, sewer or conduit between access points without cutting the road.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Flat bore near County Road 330?
Start with a map pin or address; the exact spot matters near County Road 330 and the drainage around Flat. Tell us what will go underground, the pipe or conduit size and the footage. A sketch or plans help us see the route, access and nearby lines before we scope the work.
The job scope sets the price. Flat is 340 road miles from Yukon, so mobilization matters alongside bore length and pipe size. Eckrant cobbles and bedrock can change drilling time; a route under State Highway 36, across drainage or near Preachers Creek adds crossing details. We also account for marked utilities to expose, pavement, pits, excavator time, sand backfill and any high profile or emergency demands.
Questions people ask about boring in Flat
Does Trinity take directional boring jobs in Flat, Coryell County?
Yes. We take directional boring work in Flat, Coryell County, and Trinity stays responsible for the job from the first call through the bore log. Our own crews or partner contractor crews that Trinity has vetted may handle the field work. We install water, sewer, gas, electric conduit and fiber routes near roads such as FM 931.
Does Eckrant soil in Flat create a corrosion issue for steel pipe?
The USDA soil survey maps high steel corrosion risk across 46 percent of Flat, including areas with Eckrant soil. Uncoated steel casing and tracer wire need consideration for that ground. HDPE is not subject to the same soil corrosion concern. The line owner selects any coating for steel components.
What ground does a bore pass through in Flat’s Eckrant soil?
The USDA soil survey maps Eckrant across 29 percent of Flat, with silty clay prominent at the surface. At about 40 inches down, bedrock is mapped across 64 percent of the area and silt loam across 20 percent. Those are survey patterns, not test borings, so the exact route still needs site planning.
How much bedrock is mapped within five feet of the surface in Flat?
Bedrock is mapped within 60 inches across 85 percent of Flat. The survey maps hard bedrock across 55 percent and weathered bedrock across 30 percent, with typical depth at 25 inches. That suggests some routes may meet rock early, but mapping does not tell us the exact material at a proposed bore.
Who approves a bore under Texas State Highway 36 in Flat?
The utility that owns the line applies for the TxDOT utility permit through RULIS, and TxDOT’s Waco District reviews it. We provide the bore plan and profile and work under the utility owner’s permit. A crossing under Texas State Highway 36 needs cover that follows the permit and the line type.
Can a utility line be bored under Preachers Creek near Flat?
A bore can be planned beneath Preachers Creek, which is mapped 0.8 miles outside Flat’s boundary. The route must account for the channel, and creek jurisdiction is checked during planning. There is no named stream mapped inside the community, so the exact proposed location matters.
Does Trinity cover Mound and rural sites outside Flat?
Yes. We take work around Mound, 3.1 miles north of Flat, and at rural sites outside the mapped community boundary. Gatesville is 11.5 miles northwest and McGregor is 13.9 miles northeast. We review each location’s access, route and crossings before setting the work plan.
How much notice does Texas811 need for a Flat bore along State Highway 36?
For a bore along State Highway 36, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days past the original notice, submit a new request. Worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of directional boring in Flat under Texas State Highway 36?
The price depends on the route, not just its length. A bore under Texas State Highway 36 can require permit planning and highway cover; Flat’s shallow mapped bedrock can affect drilling time. Pipe size, footage, utility crossings, pavement, pits, creek or drainage work, equipment time and the 340 road miles from Yukon also affect the scope.
Where the Flat facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Flat
- U.S. Census Bureau, TIGER/Line 2024: Flat boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Flat population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Flat housing units and year built
- Macrostrat geologic map compilation: map units under Flat
- U.S. EPA Safe Drinking Water Information System: public water systems serving Flat
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Coryell County
- U.S. Geological Survey, Elevation Point Query Service: Flat elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Flat
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Flat
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Flat, Texas
Type the address of your job in Flat. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Flat
Same county: Copperas Cove · Fort Hood · Evant. All counties: Texas county list.