Mound Texas Directional Boring: Bastsil Soil, FM 1829 and Leon River
Quick Answer: Mound is an unincorporated community in Coryell County, so County Road 318 and its other local streets fall under county authority, not a city government. We do directional boring, also called horizontal directional drilling (HDD), for lines beneath FM 1829 and local roads. Mound is 337 road miles from our Yukon, Oklahoma main office, with County Road 318 among its mapped routes. Bastsil soil covers 62 percent of the mapped area, and its clayey layer can grip pipe if the bore stays open too long.
Mound bores at a glance
- Unincorporated community in Coryell County, Texas. Population 174 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 337 miles, about 6.6 hours of driving.
- Ground: Bastsil soil is mapped on 62 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 1829. State permit office: TxDOT Waco District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Leon River.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring along FM 1829 in Mound?
Mound is an unincorporated community in Coryell County, so its streets are not managed by a city government. The Census Bureau counted 174 residents in 2020; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber lines, including beneath FM 1829 and County Road 318 where open trenching would disrupt the road.
Our main office is in Yukon, Oklahoma, and Mound work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a small service line under County Road 320 or a large casing bore near FM 1829, our range runs from 3/4 inch to 48 inch. Our Yukon main office is 337 road miles from Mound; our family business began in 1965 and we have done directional boring since 1982.

How does Bastsil soil affect a bore in Mound?
The USDA soil survey maps Bastsil fine sandy loam across 62 percent of Mound, with Minwells fine sandy loam across 23 percent. At about 40 inches below the surface, sandy clay loam covers 62 percent of the mapped area, while sandy clay covers 23 percent. Across that depth, the mapped soil is mostly CL, with some SC and CH. The survey maps no sandy area at that depth. These are mapped soil patterns, not test borings, so the actual ground along County Road 318 still needs to be checked as the bore is planned.
| USDA soil survey, inside the Mound mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Bastsil 62 percent, Minwells 23 percent, Krum 11 percent and Bosque 3 percent |
| Texture at the surface | fine sandy loam 85 percent, silty clay 13 percent and clay loam 3 percent |
| Texture about 40 inches down | sandy clay loam 62 percent, sandy clay 23 percent and silty clay 11 percent |
| Engineering class about 40 inches down | lean clay (CL) 64 percent, clayey sand (SC) 23 percent and fat clay (CH) 13 percent |
| Average clay content about 40 inches down | 32 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 13 percent of the area |
Bedrock is not mapped in the top five feet in Mound, including around FM 1829, though that does not rule out deeper rock. The USDA soil survey maps no seasonal water table within 60 inches, and flood prone soils cover 4 percent of the area. High steel corrosion risk is mapped in 13 percent. The geologic map shows Pleistocene alluvial clay, silt, sand and gravel, with Early Cretaceous chalk, limestone, mud and sandstone also mapped. Clay can hold a hole open but may grip pipe; the mapped alluvium makes site checks important before choosing the drilling approach.
How do we bore Mound’s sandy clay loam description in areas mapped with Bastsil soils and a fine sandy loam surface texture?
The USDA soil survey maps sandy clay loam at about 40 inches across much of Mound. We plan the bore for clay that may cling to the reamer, and verify marked lines before drilling near County Road 318.
- Clay control: Bastsil soil and the sandy clay loam mapped at about 40 inches can cling to the reamer, so we use a thinner fluid and staged reaming.
- Line exposure: Before drilling near a marked utility along County Road 318, we hydrovac pothole it because surface paint does not show its depth.
- Steering checks: The mapped alluvial clay, silt, sand and gravel around the Leon River call for depth and pitch checks as each drill rod advances.
- Creek planning: For a proposed Leon River crossing, we plan the bore beneath the channel and check the crossing for federal jurisdiction during planning.

What is in the way of a new line in Mound near County Road 318?
FM 1829 runs through Mound, with 0.5 mapped roadway miles inside the community boundary. Texas State Highway 36 is 0.9 miles outside it. County Road 318 is the longest named local street, at 0.95 miles, followed by County Road 317 at 0.29 miles and County Road 320 at 0.2 miles. A bore near these roads has to account for the road surface and right of way. Boring keeps the roadway intact, with entry and exit pits set in the dirt.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 1829 | State highway | 0.5 roadway miles inside | State highway office |
| Texas State Highway 36 | Highway nearby | 0.9 miles outside | State highway office |
| Leon River | Stream | 0.31 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Henson Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Mound or within one mile of the community boundary, and no street and rail crossings are mapped. The Leon River runs for 0.31 channel miles inside Mound, but no street crossing of a named stream is mapped. Henson Creek is 0.6 miles outside the boundary. Because no lakes or ponds are mapped within one mile of Mound, we review the Leon River separately when planning a bore near the river. A proposed bore at the Leon River still needs its water crossing checked during planning.
Who approves a bore in Mound and Coryell County?
Mound has no city government, so County Road 318 and other local streets are under county authority rather than a city street department. FM 1829 is a state highway, and any work in its right of way needs a TxDOT utility permit reviewed by the Waco District. The utility that owns the line files through TxDOT’s RULIS system; we prepare the bore plan and profile and work under the permit issued to that utility. The same state process applies to Texas State Highway 36. A Leon River crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines in Mound and Coryell County?
Before planning a bore near County Road 318, we confirm the address’s water provider with Coryell County or the local water district. EPA drinking water records do not tie systems to towns, and no provider could be matched to Mound. Utilities reporting electric service in Coryell County include Oncor Electric Delivery Company, Texas-New Mexico Power, Hamilton County Electric Cooperative Association, Heart of Texas Electric Cooperative and United Electric Cooperative Service. Confirm the line owner before planning an electric conduit bore near FM 1829.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, Texas-New Mexico Power, Hamilton County Electric Cooperative Association, Heart of Texas Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Coryell County | EIA Form 861 | Confirm the line owner by address |
For underground work in Mound, we treat the 1992 median housing year from the American Community Survey 2019 to 2023 five year estimates as context, not a utility record. The survey estimates that 78 percent of housing was built from 1960 to 1999 and 22 percent in 2000 or later. That mix can mean replacement lines as well as new service runs near County Road 318. Before the drill approaches a marked utility, we hydrovac pothole it to expose its depth; paint alone shows position, not depth.

How far is Mound from Flat and our Yukon office?
Mound is an unincorporated community in Coryell County, with a mapped land area of 0.72 square miles and an elevation of 687 feet. Its ZIP code is 76528. Flat is 3.1 miles south, while South Mountain is 6.5 miles north. Gatesville, the county seat and nearest larger city, is 8.6 miles northwest. Oglesby is 9.1 miles northeast and McGregor is 13.7 miles east. Our Yukon, Oklahoma main office is 337 road miles away, a drive of 6.6 hours, which is part of the mobilization plan for work near FM 1829.
Places near Mound
- Directional boring in Flat: 3.1 miles south
- Directional boring in South Mountain: 6.5 miles north
- Directional boring in Gatesville: 8.6 miles northwest
- Directional boring in Oglesby: 9.1 miles northeast
- Directional boring in McGregor: 13.7 miles east
What would we bore near the Leon River in Mound?
- Highway crossing: A line beneath FM 1829 needs a bore plan that accounts for the state highway right of way and roadway.
- Road service: A water or sewer service beneath County Road 318 can avoid cutting the longest named street in Mound.
- Fiber route: Fiber conduit along County Road 317 can be bored around marked utilities, with each line exposed before the drill approaches.
- Creek crossing: A proposed line beneath the Leon River needs a planned channel crossing and a jurisdiction check.
- Electric conduit: Before a conduit bore near FM 1829, we confirm the line owner and expose marked utilities along the route.
- Acreage service: A longer service near the Mound community boundary can use the 48 inch end of our casing range when the project calls for it.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Mound bore near FM 1829?
For a bore near FM 1829, start with the address or a map pin, then tell us what is going in the ground. Give the pipe or conduit size and the footage. A sketch or plans help show the route and nearby roads such as County Road 318, so we can understand where access and bore pits may fit.
At FM 1829, our price follows the job scope, including any applicable requirements from the TxDOT Waco District. In Mound, Bastsil soil and the sandy clay loam mapped below the surface affect drilling time and fluid planning. Crossings of FM 1829 or the Leon River add planning and exposure work. Pipe size, bore length, utilities to expose, pavement, pits, excavator time and sand backfill also matter. Mobilization is part of the scope because Mound is 337 road miles from Yukon; high profile or emergency work can add planning needs.
Questions people ask about boring in Mound
Does Trinity take directional boring jobs in Mound, Coryell County, and who staffs them?
Yes. We take directional boring work in Mound, and the job is handled by our own crews or crews from satellite yards run by partner contractors we have vetted. We remain your contact from the first call through the bore log regardless of field crew, including when project plans involve Henson Creek. County Road 318 is one example of a local route where a bore may be planned.
Will a bore in Mound hit rock below Bastsil soil?
The soil survey does not map bedrock in Mound’s top five feet, but deeper rock is still possible. The geologic map shows Pleistocene alluvial clay, silt, sand and gravel, along with Early Cretaceous sedimentary material that includes chalk and limestone. We assess the route near FM 1829 rather than treating the map as a site specific test.
Who approves a bore under FM 1829 in Mound, and which TxDOT office reviews it?
TxDOT reviews work in the FM 1829 right of way through its Waco District. The utility that owns the line submits the application in TxDOT’s RULIS system. We provide the bore plan and profile and work under the permit issued to the utility. This is the state process for the highway, not a city permit in unincorporated Mound.
Can a line be bored under the Leon River in Mound?
A bore under the Leon River can be planned, but the route and channel conditions need review. The river runs for 0.31 channel miles inside Mound, and the proposed crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. We would need the location and line details to assess the bore path.
Who owns the electric lines in Mound, Coryell County, and who confirms conduit specs?
The specific line owner must be confirmed for the Mound address before planning an electric conduit bore. Oncor Electric Delivery Company, Texas-New Mexico Power, Hamilton County Electric Cooperative Association, Heart of Texas Electric Cooperative and United Electric Cooperative Service report service in Coryell County, but that does not identify the provider at every address. The line owner confirms conduit requirements.
Does Coryell County or a city control County Road 320 in Mound, and must it be cut?
Mound is unincorporated and has no city government, so County Road 320 is under county authority. A directional bore can place a line beneath the road without cutting the pavement. The entry and exit pits sit off the roadway where access permits, and the route must account for any marked utilities.
What bore sizes and lengths can Trinity handle for a job near County Road 319 in Mound?
Our work ranges from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A route near County Road 319 would be scoped from the proposed line, size and footage rather than the road name alone. A sketch or plans can help show the alignment.
How much notice does Texas811 need for a bore near County Road 318 in Mound, and what if marks move?
For a bore near County Road 318, make the Texas811 request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a planned start near Redken Road moves more than 14 days past the original notice, we make a new request before work begins. If marks along County Road 317 are worn or moved, we have them refreshed through Texas811 before continuing work.
What affects the cost of a directional bore under FM 1829 in Mound?
The price depends on the route and scope, not just the footage. Near FM 1829, factors include the sandy clay loam mapped in Mound, pipe or conduit size, bore length, pavement, utilities to expose and any creek crossing. Pits, excavator time, backfill and mobilization from Yukon also affect the work plan.
Where the Mound facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Mound
- U.S. Census Bureau, TIGER/Line 2024: Mound boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Mound population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Mound housing units and year built
- Macrostrat geologic map compilation: map units under Mound
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Coryell County
- U.S. Geological Survey, Elevation Point Query Service: Mound elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Mound
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Mound
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Mound, Texas
Type the address of your job in Mound. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Mound
Same county: Copperas Cove · Fort Hood · Evant. All counties: Texas county list.
