Happy Texas Directional Boring: Pullman Clay Loam, Interstate 27 And BNSF Railway
Quick Answer: Happy Municipal Water System owns the local water lines, while Southwestern Public Service and Lighthouse Electric Cooperative report service in Swisher County, so we confirm the line owner before planning a bore. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for crossings of Interstate 27 in Happy. The Yukon yard is 291 road miles away, and Happy Draw is one local route to plan around. Pullman clay loam holds a bore open but can grip pipe, so we control fluid and reaming.
Happy bores at a glance
- Incorporated city in Swisher County and Randall County, Texas. Population 593 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 291 miles, about 5.4 hours of driving.
- Ground: Pullman soil is mapped on 68 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Interstate 27, US 87 and FM 1075. State permit office: TxDOT Lubbock District.
- Railroad track inside the boundary: BNSF Railway, with 4 mapped street and rail crossings.
- Named streams inside the boundary: Happy Draw.
- Public water: Happy Municipal Water System, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Happy Draw in Happy?
Trinity Boring Solutions takes directional boring work in Happy, Texas, including utility routes along Western Avenue and US 87. The Happy Municipal Water System owns local water lines, while electric line ownership needs confirmation before a conduit bore. The Census Bureau Vintage 2024 estimate puts Happy’s population at 593. We install water, sewer, gas, electric conduit and fiber lines along local streets such as Buntin Avenue and 3rd Street.
Our main office is in Yukon, Oklahoma, and Happy work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa; a bore along Happy Draw is a more local scale of work. Our family business started in 1965, and we have done directional boring since 1982.

What does the soil survey show about Pullman soil in Happy?
The USDA soil survey maps Pullman soil across 68 percent of Happy, with Pullman clay loam map units covering 57 percent at 0 to 1 percent slopes and 11 percent at 1 to 3 percent slopes. Clay loam makes up 99 percent of the mapped material at about 40 inches below the surface, with an average clay content of 37 percent at that depth. These are mapped soil patterns, not test borings. The survey maps no sandy area at that depth, so a bore plan should account for cohesive, sticky ground rather than loose sand.
| USDA soil survey, inside the Happy city limits | What is mapped |
|---|---|
| Soil series mapped | Pullman 68 percent, Mansker 16 percent, Bippus 8 percent and Estacado 7 percent |
| Texture at the surface | clay loam 91 percent and loam 8 percent |
| Texture about 40 inches down | clay loam 99 percent |
| Engineering class about 40 inches down | lean clay (CL) 99 percent |
| Average clay content about 40 inches down | 37 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 1 percent of the area |
| Flood prone soils | 8 percent of the area |
| High corrosion risk for uncoated steel | 77 percent of the area |
Bedrock is not mapped in the top five feet of Happy, though the map does not rule out deeper rock. A seasonal water table is mapped within 60 inches in 1 percent of the area, while flood prone soils cover 8 percent, including ground to consider near Happy Draw. High steel corrosion risk is mapped across 77 percent, so the line owner should weigh casing and tracer wire materials; HDPE avoids that steel concern. The map shows Blackwater Draw Formation, Cenozoic sand, silt and locally clayey material, as well as Paleocene Cenozoic sedimentary rocks.
What does it take to bore Happy’s clay loam?
Happy’s clay loam can stay open but cling to a reamer and grip the pipe. Along routes such as Western Avenue, we adjust the fluid and reaming sequence to suit that mapped ground.
- Pullman clay loam is sticky and can grip the pipe, so we use thinner fluid with polymer, ream in stages and pull the line the day the hole is opened.
- The mapped clay content at about 40 inches is 37 percent; we watch fluid returns near Western Avenue so pressure does not lift pavement.
- We expose each marked utility on a Happy bore path before drilling near it; for example, a marked line under Buntin Avenue needs a hydrovac pothole to reveal its depth.
- At Happy Draw, we track the drill head from the surface and log depth and pitch; entry and exit pits sit on the banks so the channel remains uncut.

What is in the way of a new line near Interstate 27 in Happy?
Interstate 27, US 87 and FM 1075 are mapped within Happy, so a route can involve highway right of way as well as city streets. The mapped roadway lengths are 0.1 miles for Interstate 27, 1.4 miles for US 87 and 1.1 miles for FM 1075. Western Avenue is the longest named street at 1.02 miles in town; 3rd Street and Pash Avenue each measure 0.92 miles. A bore can keep pavement and street surfaces uncut, but the route still needs utility exposure and clearance planning.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 27 | Interstate | 0.1 roadway miles inside | State highway office |
| US 87 | US highway | 1.4 roadway miles inside | State highway office |
| FM 1075 | State highway | 1.1 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 1.5 track miles inside | The railroad |
| Happy Draw | Stream | 1.54 channel miles inside | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 1.5 track miles in Happy on its Plainview Subdivision, and public mapping shows 4 street and rail crossings in town. A route under those tracks needs the railroad’s crossing agreement, which sets the conditions for that crossing. Happy Draw runs 1.54 channel miles through town, with 2 mapped street crossings of named streams. Creek work needs a jurisdiction check during planning, and no lakes or ponds are mapped within one mile.
Who has to sign off on a bore in Swisher County near Happy?
Interstate 27 is a state highway, so work in its right of way goes through TxDOT, with the TxDOT Lubbock District reviewing the permit. The utility owner, not the drilling contractor, files in TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. Existing highway pavement is bored or tunneled beneath, and a rural crossing must extend below all travel lanes. BNSF Railway requires its own crossing agreement for track work, and a Happy Draw crossing is checked for Army Corps jurisdiction during planning. For a bore along Western Avenue, the excavator requests a Texas811 locate at least 48 hours before starting, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. A delay of more than 14 days past the original notice calls for a new request; moved or worn marks must be refreshed through Texas811 before work resumes.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near Happy Municipal Water System?
Happy Municipal Water System is locally owned and uses groundwater wells, with 298 service connections serving 712 people. That makes existing water routes a key check before planning a new line near Western Avenue or another street. Southwestern Public Service and Lighthouse Electric Cooperative report electric service in Swisher County, but the line owner for the specific Happy address must be confirmed before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Happy Municipal Water System | Public water system | Groundwater wells | 298 connections, 712 people served |
| Southwestern Public Service and Lighthouse Electric Cooperative | Electric utilities reporting service in Swisher County and Randall County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Happy’s median housing year at 1954; 66 percent of homes were built before 1960, 23 percent from 1960 to 1999 and 11 percent in 2000 or later. That age mix can mean either replacement work on older services or new connections. Near Buntin Avenue, marked utilities on the proposed route need to be exposed before drilling near them.

Where is Happy in relation to Tulia and the surrounding area?
Happy lies in Swisher County and Randall County, with 94 percent of the town in Swisher County, at an elevation of 3,599 feet. Its land area is 1.06 square miles, and its ZIP code is 79042. Tulia is 14.8 miles south and is the county seat; Canyon is 17.5 miles north and is the nearest larger city. Nazareth is 19.6 miles southwest. Happy is 291 road miles and a 5.4 hour drive from the Yukon yard, a distance that affects crew mobilization for work near Interstate 27.
Places near Happy
- Directional boring in Tulia: 14.8 miles south
- Directional boring in Canyon: 17.5 miles north
- Directional boring in Nazareth: 19.6 miles southwest
- Directional boring in Umbarger: 20.6 miles northwest
- Directional boring in Rockwell Place: 20.6 miles north
What boring work comes up near Western Avenue in Happy?
- Highway crossing: A bore beneath Interstate 27 keeps the route below the travel lanes and avoids cutting across the highway pavement.
- Water service: A connection near Happy Municipal Water System needs its path checked against existing groundwater well supply lines.
- Fiber conduit: A route along Western Avenue needs marked utilities exposed before the drill approaches the street corridor.
- Rail crossing: A bore beneath BNSF Railway on the Plainview Subdivision requires a railroad agreement for the track crossing.
- Creek crossing: A Happy Draw bore places pits on either side of the channel and checks jurisdiction during planning.
- Street connection: A sewer or water route near Pash Avenue can pass beneath the street without an open cut.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for work near Buntin Avenue in Happy?
A map pin for a Happy job near Buntin Avenue lets us place the route against nearby streets and marked utilities. Send the address or pin, what is going underground, the pipe or conduit size and the footage. A sketch or plans help us check the proposed path, especially where it approaches Interstate 27 or Happy Draw.
Pullman clay loam is the first price factor because its sticky ground can call for staged reaming and controlled fluid. The number of utilities to expose and any concrete or pavement matter next, especially along Western Avenue or near Interstate 27. Happy Draw adds planning for a creek crossing. Pit work, excavator time, sand backfill, pipe size, bore length and mobilization from the Yukon yard also affect the job’s price.
Questions people ask about boring in Happy
Does Trinity take directional boring work in Swisher County near Happy?
Yes, we take directional boring jobs in Happy and Swisher County. Our Yukon main office coordinates the job, using our own crews and vetted partner drilling contractors for field work. You deal with Trinity from the first call through the bore log, whether the route is near Western Avenue or Interstate 27.
Can Pullman soil in Happy corrode steel, and what pipe should I use?
The USDA soil survey maps high steel corrosion risk across 77 percent of Happy, where Pullman soil is widespread. The line owner should consider material and coating choices for steel casing or tracer wire. HDPE is not subject to that soil corrosion concern, but the owner chooses the line material for the project.
What ground will a bore pass through in Happy’s Pullman clay loam?
Happy is mapped mainly as Pullman soil, and clay loam covers 99 percent of the mapped ground at about 40 inches below the surface. The average clay content there is 37 percent. That cohesive material can cling to the reamer and grip pipe, so a bore near Buntin Avenue may need staged reaming and careful fluid control.
Will a directional bore in Happy hit rock near Happy Draw?
Bedrock is not mapped in Happy’s top five feet, but that does not rule out deeper rock near Happy Draw. The geologic map shows the Blackwater Draw Formation, which includes sand, silt and locally clayey material. Actual conditions along a particular bore route still depend on the ground encountered there.
Who approves a bore under Interstate 27 in Happy?
TxDOT reviews work in the Interstate 27 right of way through its Lubbock District. The utility owner submits the application in TxDOT’s RULIS system, while we prepare the bore plan and profile. The permit governs the crossing details, including the required depth and construction approach.
What does a bore under BNSF Railway in Happy require?
A bore beneath BNSF Railway’s 1.5 track miles in Happy needs an agreement from the railroad that owns the track. That agreement establishes crossing requirements such as casing, depth and flagging. If the route also uses highway right of way near US 87, TxDOT asks for a copy of the railroad agreement.
Can I call Trinity after hours about an urgent bore near Pash Avenue in Happy?
Yes. For an urgent job near Pash Avenue, call (405) 409-7423; a person answers at any hour. Trinity also provides 24 hour emergency response, so you can describe the Happy location and the line or crossing that needs attention.
How early should I call Texas811 for a bore near Western Avenue in Happy?
For a bore along Western Avenue, request a Texas811 locate at least 48 hours before excavation, not counting Saturdays, Sundays and legal holidays. Do not submit it earlier than 14 days before work. If marks move or wear away, have them refreshed through Texas811 before work continues.
What affects the price of directional boring under Interstate 27 in Happy?
The job’s length, pipe or conduit size and Pullman clay loam affect the price, as do utilities that must be exposed. Pavement at Interstate 27, a BNSF Railway crossing or work near Happy Draw can add planning and equipment needs. Pit work, excavator time and mobilization from Yukon also figure into the job.
Where the Happy facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Happy
- U.S. Census Bureau, TIGER/Line 2024: Happy boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Happy
- U.S. Census Bureau, American Community Survey 2019 to 2023: Happy housing units and year built
- Macrostrat geologic map compilation: map units under Happy
- U.S. EPA Safe Drinking Water Information System: public water systems serving Happy
- U.S. Department of Transportation, North American Rail Network: track owners in Swisher County and Randall County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Swisher County and Randall County
- U.S. Geological Survey, Elevation Point Query Service: Happy elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Happy
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Happy
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Happy, Texas
Type the address of your job in Happy. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Happy
County: Randall County directional boring. Same county: Amarillo · Lake Tanglewood · Timbercreek Canyon · Palisades · Bushland · Kress. All counties: Texas county list.