Hillsboro Texas Directional Boring: Houston Black Clay, Interstate 35 and Union Pacific Track
Quick Answer: We take directional boring, also called horizontal directional drilling (HDD), in Hillsboro for routes that cross Interstate 35 and other local roads. Hillsboro is 268 road miles from our Yukon, Oklahoma main office, and we staff work with our crews and vetted partner yards near routes such as Elm Street. Houston Black clay is common here and can grip pipe, so the reaming and pullback need care. Pecan Creek and Union Pacific tracks can also shape the route.
Hillsboro bores at a glance
- County seat of Hill County, Texas. Population 8,878 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 268 miles, about 5.2 hours of driving.
- Ground: Houston Black soil is mapped on 35 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 20 percent of the area.
- Highways inside the boundary: Interstate 35, US 77, Texas State Highway 81, Texas State Highway 171 and Texas State Highway 22. State permit office: TxDOT Waco District.
- Railroad track inside the boundary: Union Pacific, with 17 mapped street and rail crossings.
- Named streams inside the boundary: Pecan Creek, Hackberry Creek and Little Hackberry Creek.
- Public water: City of Hillsboro, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Hillsboro’s Elm Street?
We take directional boring work in Hillsboro, Hill County, where the Census Bureau Vintage 2024 estimate puts the population at 8,878. On Elm Street and Abbott Avenue, we can install water, sewer, gas, electric conduit and fiber lines by bore when the route and access fit. Our work ranges from short service connections to larger casing, with the plan built around the actual street and utility path.
Our main office is in Yukon, Oklahoma, and Hillsboro work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We began directional boring in 1982, after starting as a family business in 1965. More than four decades of boring helps us plan for Hillsboro’s Houston Black clay, which can stick to the reamer and hold tightly around pipe.

What does the soil survey show around Hillsboro and Houston Black soil?
The USDA soil survey maps Houston Black as 35 percent of Hillsboro’s soil series, with Heiden at 19 percent and Ferris at 18 percent. Houston Black clay, 1 to 3 percent slopes, accounts for 15 percent of mapped area. About 40 inches down, the survey maps clay across 89 percent of the area, and the average clay content at that depth is 50 percent. In Hillsboro, we read mapped soil patterns as general mapping, not as test borings for a specific bore path. The thick clay can ball up on a reamer and grip the product pipe.
| USDA soil survey, inside the Hillsboro city limits | What is mapped |
|---|---|
| Soil series mapped | Houston Black 35 percent, Heiden 19 percent, Ferris 18 percent, Chatt 10 percent and Tinn 9 percent |
| Texture at the surface | clay 89 percent, clay loam 4 percent and silty clay 4 percent |
| Texture about 40 inches down | clay 89 percent, silty clay 4 percent and clay loam 4 percent |
| Engineering class about 40 inches down | fat clay (CH) 80 percent and lean clay (CL) 18 percent |
| Average clay content about 40 inches down | 50 percent |
| Bedrock mapped within 60 inches | 20 percent of the area (0 percent hard rock, 20 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 9 percent of the area |
| High corrosion risk for uncoated steel | 94 percent of the area |
The survey maps bedrock within 60 inches across 20 percent of Hillsboro, with weathered bedrock accounting for that mapped area; hard bedrock is not mapped in that depth range. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 9 percent. High steel corrosion risk is mapped across 94 percent, so the line owner should weigh casing and tracer wire materials; HDPE has no steel corrosion concern. The mapped Eagle Ford Formation is Late Cretaceous shale, siltstone and limestone, so the bore plan still needs to allow for changing material.
How do crews bore through Hillsboro clay?
Houston Black clay covers much of Hillsboro, and the survey maps mostly clay at about 40 inches down. We adjust the fluid, reaming sequence and pullback to keep the hole workable without pushing pressure against streets or pavement.
- Houston Black clay can stick to the reamer, so we use thinner drilling fluid with polymer, ream in stages and pull pipe the day the hole is opened.
- With heavy clay mapped across Hillsboro, we watch returns and fluid pressure near Elm Street pavement to avoid lifting the surface.
- Before a drill approaches any marked line on an Abbott Avenue route, we hydrovac pothole it; paint marks position, not depth.
- For a Pecan Creek crossing, we track the drill head from the surface and log depth and pitch as the bore advances.

Where might a Hillsboro bore pass under Union Pacific?
Interstate 35, US 77, Texas State Highway 81 and Texas State Highway 171 all run within Hillsboro, so a route can involve state right of way as well as city streets. The longest named streets include Elm Street at 2.89 miles, Franklin Street at 2.63 miles and Abbott Avenue at 2.34 miles. A bore beneath existing highway pavement avoids cutting across the surface. The road owner and line owner need the planned route and profile before the crossing is set.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 35 | Interstate | 13.1 roadway miles inside | State highway office |
| US 77 | US highway | 13.3 roadway miles inside | State highway office |
| Texas State Highway 81 | State highway | 9.1 roadway miles inside | State highway office |
| Texas State Highway 171 | State highway | 4.5 roadway miles inside | State highway office |
| Texas State Highway 22 | State highway | 4.2 roadway miles inside | State highway office |
| Spur 579 | State highway | 2 roadway miles inside | State highway office |
| FM 310 | State highway | 1.8 roadway miles inside | State highway office |
| FM 3267 | State highway | 1.2 roadway miles inside | State highway office |
| Texas State Highway 77 | State highway | 0.5 roadway miles inside | State highway office |
| Union Pacific | Railroad | 4.4 track miles inside | The railroad |
| Pecan Creek | Stream | 4.71 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Hackberry Creek | Stream | 0.63 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Little Hackberry Creek | Stream | 0.43 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Katy Lake | Lake or pond | 18 acres, inside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 4.4 track miles inside Hillsboro on its Fort Worth Subdivision, and public mapping shows 17 street and rail crossings in the city. A crossing agreement with Union Pacific sets the crossing conditions. Pecan Creek runs 4.71 channel miles in the city, alongside Hackberry Creek and Little Hackberry Creek; mapping shows 8 street crossings of named streams. Katy Lake is also inside city limits, so creek or lake routes need crossing review during planning.
Who signs off on a Hillsboro bore under Interstate 35?
For electric and communication lines crossing Interstate 35, TxDOT rules set at least 60 inches of cover below the lowest point of the crossed grade; water crossings also need 60 inches, and pressurized sewer crossings need 60 inches. The utility owner, not our crew, applies through TxDOT’s RULIS system, and the Waco District reviews the request. We prepare the bore plan and profile and work under the utility owner’s permit. TxDOT requires boring or tunneling beneath existing highway pavement, with encasement for crossings and a bore extending under all travel lanes on rural highways. On Hillsboro city streets, we recognize that the streets belong to the city. Union Pacific track crossings need its agreement, and Pecan Creek routes are checked for federal waterway jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Hillsboro system?
The City of Hillsboro public water system uses purchased surface water and lists 3,245 service connections serving 8,867 people. That network means a planned bore near Elm Street or Interstate 35 has to be checked against existing water lines. Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative report electric service in Hill County. We confirm the line owner for the specific route before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Hillsboro | Public water system | Surface water bought from another system | 3,245 connections, 8,867 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative | Electric utilities reporting service in Hill County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Hillsboro’s median housing year at 1970; 39 percent of homes were built before 1960, 51 percent from 1960 to 1999 and 10 percent in 2000 or later. That mix can mean replacement work as well as new service along streets such as Walnut Street. Along a Hillsboro bore path, we hydrovac pothole every marked utility before drilling near it. For example, a Walnut Street crossing needs each marked line exposed because paint gives position, not depth.

Do you cover Hillsboro, Carl’s Corner and nearby areas?
Hillsboro is the incorporated county seat of Hill County, covers 10.98 square miles and sits at an elevation of 628 feet. Its ZIP code is 76645. Carl’s Corner is 6.4 miles northeast, Bynum is 7.1 miles east and Abbott is 8.8 miles south. Cleburne, the nearest larger city listed, is 29.6 miles northwest. From our Yukon, Oklahoma main office, Hillsboro is 268 road miles away, or a 5.2 hour drive. We take work in Hillsboro, nearby towns and rural areas beyond the city limits.
Places near Hillsboro
- Directional boring in Carl’s Corner: 6.4 miles northeast
- Directional boring in Bynum: 7.1 miles east
- Directional boring in Abbott: 8.8 miles south
- Directional boring in Itasca: 10.6 miles north
- Directional boring in Aquilla: 12.3 miles southwest
- Directional boring in Cleburne: 29.6 miles northwest
What would we bore near Hillsboro’s Abbott Avenue?
- Highway crossing: An Interstate 35 utility route is bored beneath the pavement, with the crossing depth and casing planned for the line.
- Water service: A service connection near the City of Hillsboro system can be routed beneath Elm Street without cutting the street surface.
- Fiber conduit: A fiber route along Abbott Avenue can use a bore to avoid opening pavement and driveways.
- Creek crossing: A route under Pecan Creek needs a depth plan that stays below the channel and a jurisdiction check during planning.
- Rail crossing: A bore beneath the Union Pacific Fort Worth Subdivision follows the railroad crossing agreement for casing, depth and flagging.
- Park connection: A service route near Wallace Park can be planned around the site access and any marked utilities along the bore path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote work near Hillsboro’s Walnut Street?
For a Walnut Street quote, send the address or map pin, what is going in the ground, pipe or conduit size and footage; a sketch or plans help. The local route matters as much as the length. A line near Interstate 35 or Union Pacific track needs a different crossing plan from a service run along a city street.
A short, accessible run along Walnut Street with a clear route is simpler to plan. Houston Black clay can make reaming and pullback more demanding, while a Union Pacific or Interstate 35 crossing adds coordination and depth planning. Length, pipe size, soil and rock, marked utilities to expose, pavement, creek crossings, pits, excavator time and backfill all affect the scope. The 268 road miles from Yukon can also affect mobilization.
Questions people ask about boring in Hillsboro
Does Trinity take directional boring jobs in Hillsboro and Hill County?
Yes. We take directional boring jobs in Hillsboro and across Hill County, with our own crews and vetted partner drilling contractors available to staff the work. From the first call through the bore log, we handle Trinity communication, whichever crew is on site. An Elm Street route is scoped around the line, size and crossing conditions.
Can Houston Black soil in Hillsboro corrode steel casing?
The mapped soil conditions call for attention to steel: Hillsboro has high steel corrosion risk across 94 percent of its area. For Hillsboro steel casing, we leave coating and tracer wire choices to the line owner. HDPE has no steel corrosion concern, but the material choice depends on the line and crossing, including routes near Houston Black clay.
What ground does a Hillsboro bore pass through around Houston Black soil?
Hillsboro’s USDA soil survey maps Houston Black as 35 percent of its soil series and clay across 89 percent of the area at about 40 inches down. The average clay content there is 50 percent. That mapped clay can cling to the reamer and grip the pipe, so staged reaming and a timely pullback help manage the hole.
Is there rock on a Hillsboro bore route, and how much is mapped within five feet?
The survey maps bedrock within five feet across 20 percent of Hillsboro, and that mapped bedrock is weathered; hard bedrock is not mapped in that depth range. The Eagle Ford Formation includes shale, siltstone and limestone. A route near Pecan Creek still needs its own depth plan because soil mapping is not a test of the actual bore path.
Who approves a Hillsboro bore beneath Interstate 35?
TxDOT reviews utility work in Interstate 35 right of way through its Waco District. The utility owner submits the application in RULIS, while we prepare the bore plan and profile and work under the owner’s permit. The required cover depends on the line type and crossing; Hillsboro routes beneath existing highway pavement are bored or tunneled.
What does a Hillsboro bore beneath Union Pacific track require?
A crossing beneath the Union Pacific Fort Worth Subdivision needs an agreement from Union Pacific. That agreement sets crossing details such as casing, depth and flagging. Since 4.4 track miles lie within Hillsboro, the exact crossing location matters; where the line also occupies highway right of way, TxDOT asks for a copy of the railroad agreement.
Does Trinity cover Carl’s Corner and rural sites outside Hillsboro?
Yes. We take work in Carl’s Corner, 6.4 miles northeast of Hillsboro, and on rural routes beyond the city limits. Bynum is 7.1 miles east and Abbott is 8.8 miles south, so the address and access help us plan the crew and route. Hillsboro is 268 road miles from our Yukon main office.
How far ahead should I call Texas811 for a Hillsboro bore on Elm Street?
For an Elm Street start, place the Texas811 locate request at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before excavation. The ticket has a 20 day life; if the start slips more than 14 days past the original notice, make a new request. If marks are worn or moved in Hillsboro, we have them refreshed through Texas811 before work continues.
What affects the cost of a Hillsboro directional bore near Interstate 35?
The scope drives the price: length, pipe or conduit size, ground, utilities to expose, pavement, creek crossings, pits and equipment time all matter. Houston Black clay can affect the drilling plan, and an Interstate 35 or Union Pacific crossing adds coordination. Mobilization also reflects the 268 road miles from Yukon, while emergency or high profile work can change the requirements.
Where the Hillsboro facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Hillsboro
- U.S. Census Bureau, TIGER/Line 2024: Hillsboro boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Hillsboro
- U.S. Census Bureau, American Community Survey 2019 to 2023: Hillsboro housing units and year built
- Macrostrat geologic map compilation: map units under Hillsboro
- U.S. EPA Safe Drinking Water Information System: public water systems serving Hillsboro
- U.S. Department of Transportation, North American Rail Network: track owners in Hill County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hill County
- U.S. Geological Survey, Elevation Point Query Service: Hillsboro elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Hillsboro
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Hillsboro
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Hillsboro, Texas
Type the address of your job in Hillsboro. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Hillsboro
Same county: Whitney · Hubbard · Blum · Mount Calm · Covington · Malone · Penelope · Mertens. All counties: Texas county list.
