trinityboringsolutions.com

Bynum Texas Directional Boring: Chatt Clay, FM 1242 And Bynum Creek

Quick Answer: FM 1242 and Texas State Highway 171 are the main route constraints, and Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Bynum, Texas, beneath roads where the route calls for it. From Harrel Avenue, our Yukon, Oklahoma main office is 273 road miles away, so distance matters when planning a service run. Chatt soil covers 94 percent of mapped land, and its clay can cling to the reamer and grip pipe. Staged reaming and a same day pull help manage that ground near White Avenue.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Bynum bores at a glance

  • Incorporated city in Hill County, Texas. Population 179 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 273 miles, about 5.3 hours of driving.
  • Ground: Chatt soil is mapped on 94 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 1242 and Texas State Highway 171. State permit office: TxDOT Waco District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Does anyone provide directional boring in Bynum along FM 1242?

We take directional boring work in Bynum, an incorporated town in Hill County with a population of 179, according to the Census Bureau Vintage 2024 estimate. Along streets such as Harrel Avenue and Toliver Avenue, we install water, sewer, gas, electric conduit and fiber lines by bore when the route and site allow. A bore keeps the surface intact where an open cut is not wanted.

Our main office is in Yukon, Oklahoma, and Bynum work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa, Oklahoma. A typical service bore near FM 1242 is much shorter. We are a family business started in 1965, with directional boring work since 1982.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

How does Chatt soil affect boring in Bynum?

The USDA soil survey maps Chatt soil across 94 percent of Bynum and Venus loam across 6 percent. Chatt clay, with 1 to 3 percent slopes, is the dominant mapped soil. Clay makes up 94 percent of the mapped surface texture, and at about 40 inches the survey maps clay across 94 percent of the area. Its average clay content at that depth is 42 percent. These are mapped soil patterns, not test borings, so a site check along Akin Avenue still matters.

USDA soil survey, inside the Bynum city limitsWhat is mapped
Soil series mappedChatt 94 percent and Venus 6 percent
Texture at the surfaceclay 94 percent and loam 6 percent
Texture about 40 inches downclay 94 percent and clay loam 6 percent
Engineering class about 40 inches downlean clay (CL) 99 percent
Average clay content about 40 inches down42 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel94 percent of the area

The soil survey does not map bedrock in the top five feet, a finding that does not rule out deeper rock. Seasonal water table and flood prone soils are not mapped in Bynum, but crews still watch conditions near Bynum Creek. High steel corrosion risk is mapped across 94 percent of the area, so the line owner should consider casing and tracer wire materials; HDPE is not affected by soil corrosion, a consideration as we plan boring through Bynum’s clay surface soil. The geologic map identifies Austin Chalk, a Late Cretaceous unit, but the map is not a bore alignment test.

How do crews bore through clay in Bynum?

Chatt clay is the main mapped ground in Bynum. We plan the bore around how that sticky soil handles drilling fluid, the nearby pavement and the line route along streets such as White Avenue.

  1. With Chatt clay mapped across most of Bynum, we use thinner drilling fluid and polymer, then ream in stages to reduce sticky buildup on the reamer.
  2. Because heavy clay covers 94 percent of mapped land, we monitor fluid returns near FM 1242 pavement and manage pressure to avoid lifting the surface.
  3. Before drilling near marked lines on Harrel Avenue, we use hydrovac potholing to expose them; surface paint shows position, not depth.
  4. As the bore advances beneath White Avenue, a walkover locator tracks the drill head and we log depth and pitch at each rod.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Where might a Bynum line pass beneath Bynum Creek or roads?

FM 1242 and Texas State Highway 171 each have mapped roadway within Bynum, so a route under either highway needs a plan that protects the pavement. Harrel Avenue is the longest named street at 0.58 miles in town. Toliver Avenue measures 0.49 miles, and White Avenue measures 0.48 miles. A bore can keep a line beneath those surfaces without cutting them. The street route and the highway right of way determine where pits and the drill path can fit.

CrossingTypeMapped extentWho has a say
FM 1242State highway0.5 roadway miles insideState highway office
Texas State Highway 171State highway0.5 roadway miles insideState highway office
Bynum CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Ash CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped within Bynum or within one mile outside its limits, so a local track crossing is not indicated. Bynum Creek lies 0.4 miles from the town limits, and Ash Creek lies 0.5 miles away; neither is mapped inside town. No mapped street crosses a named stream in Bynum, and no lakes or ponds are mapped within one mile. If a proposed route reaches Bynum Creek, the crossing plan needs a jurisdiction check during planning.

Who approves a Bynum bore on Hill County roads?

Bynum city streets belong to the town, while FM 1242 and Texas State Highway 171 are state highways. Work in their right of way needs a TxDOT utility permit, reviewed by the TxDOT Waco District. The utility that owns the line submits the application through TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. Existing highway pavement is bored or tunneled beneath, with the required cover depending on the line type and permit. A route near Bynum Creek also gets checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Bynum, Hill County?

The water provider for an address on White Avenue or elsewhere in Bynum has to be confirmed with the town, Hill County or the local water district before a bore is planned. Electric service reported in Hill County includes Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative. Those reports do not identify the provider at every address, so we confirm the line owner before planning an electric conduit bore. Hydrovac potholing helps expose marked water and electric lines before drilling near them.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric CooperativeElectric utilities reporting service in Hill CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

We use Bynum’s 1965 median housing year as context when planning underground work along Harrel Avenue. We factor Bynum’s housing age estimates into underground planning: 50 percent of homes built before 1960, 43 percent from 1960 to 1999, and 7 percent in 2000 or later. That mix can mean a replacement bore along Toliver Avenue has older buried lines to work around, while a newer service still needs a clear path. We pothole marked utilities before the drill gets near them; paint shows position, not depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

How far is Bynum from Abbott and the Yukon yard?

Bynum is in Hill County, at an elevation of 651 feet, and covers 0.13 square miles. Its ZIP code is 76631. Hillsboro is 7.1 miles west and is both the nearest larger city and county seat. Abbott is 7.1 miles southwest, Malone is 7.3 miles southeast, Carl’s Corner is 8.5 miles north and Mertens is 8.9 miles northeast. The Yukon, Oklahoma main office is 273 road miles away, a drive of 5.3 hours, which affects planning for work around FM 1242.

Places near Bynum

Which jobs call for a bore along Harrel Avenue in Bynum?

  • Highway crossing: A route beneath FM 1242 or Texas State Highway 171 needs a bore plan that protects pavement and fits the state right of way.
  • Water service: A service bore along Harrel Avenue can keep a new line beneath the street surface, after the address water provider is confirmed.
  • Fiber drop: Fiber conduit along White Avenue can be installed by bore, with marked utilities exposed before the drill approaches them.
  • Sewer line: A sewer route near Toliver Avenue can use staged reaming through the mapped Chatt clay and avoid an open cut across pavement.
  • Creek crossing: If a proposed route reaches Bynum Creek outside town, the plan accounts for the channel and checks jurisdiction during planning.
  • Electric conduit: A conduit route near Akin Avenue starts with confirming the line owner, since several utilities report electric service in Hill County.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Bynum bore near Akin Avenue?

For a bore near Akin Avenue, give us the street address or a map pin first. Tell us what will go underground, then the pipe or conduit size and the footage. A sketch or plans help show how the route meets the street, nearby utilities and any pavement. Those details let us assess the actual bore path rather than estimate from the street name alone.

We base price on job details for crossings of Texas State Highway 171, including the work requested and site conditions. Ground conditions matter: Chatt clay can cling to the reamer and grip pipe. Crossings matter too, especially a route beneath FM 1242 or concrete and pavement near White Avenue. We also account for exposed utilities, pits, excavator time and sand backfill when needed. Distance from the Yukon office adds mobilization planning for Bynum, 273 road miles away. Emergency work near Bynum Creek can also change our scope, just as high profile work can.

Questions people ask about boring in Bynum

Does Trinity take directional boring work in Bynum and Hill County, and who staffs it?

Yes. We take Bynum work with our own crews and from satellite yards run by partner drilling contractors we have vetted. Our main office is in Yukon, Oklahoma, and you work with Trinity through the bore log regardless of which crew is on site. We serve routes around FM 1242 and throughout Texas.

Who controls White Avenue in Bynum, and can a bore avoid cutting it?

Bynum is incorporated, so its city streets belong to the town itself. A bore along White Avenue can pass beneath the street without an open cut when the site and route allow. We still need to locate and expose marked utilities along the planned path before drilling near them.

Do older homes near Toliver Avenue in Bynum make replacement bores harder?

The American Community Survey 2019 to 2023 estimates put the median housing year at 1965, with 50 percent of homes built before 1960. Older lines may be present near Toliver Avenue, but records do not identify each buried service. We pothole marked utilities along the proposed route before drilling close to them.

Does Chatt soil in Bynum create a corrosion concern, and what pipe can be used?

The USDA soil survey maps high steel corrosion risk across 94 percent of Bynum, so the line owner should consider steel casing and tracer wire materials. HDPE is not affected by soil corrosion, a consideration as we plan boring through Bynum’s clay surface soil. The appropriate pipe and any coating depend on the line owner’s design for the route near FM 1242 or a local street.

What ground does a bore pass through in Bynum’s Chatt soil?

Chatt soil is mapped across 94 percent of Bynum, and the USDA survey maps clay across 94 percent of the area at about 40 inches. Average clay content at that depth is 42 percent. Clay can stick to the reamer and grip pipe, so staged reaming and a same day pull help manage a bore near Harrel Avenue.

Will we hit rock on a bore in Bynum where the Chatt soil series occurs?

Bedrock is not mapped in the top five feet of Bynum, but that does not rule out deeper rock along a specific route. The geologic map identifies Austin Chalk, a Late Cretaceous unit. We assess the actual bore alignment rather than treat the map as a site test, including for work near Texas State Highway 171.

Does Trinity cover Hillsboro and rural sites outside Bynum?

We take work across Texas, including Bynum, Hillsboro and rural routes outside town. Hillsboro is 7.1 miles west and is the county seat, while Abbott is 7.1 miles southwest. Each route still needs its own address or map pin, line scope and access details before we can plan a bore.

How much Texas811 notice does a bore on Harrel Avenue in Bynum need?

The person arranging the work requests a Texas811 locate for the planned bore path, such as a route along Harrel Avenue. Texas law requires notice at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For the TxDOT Waco District, if our start slips more than 14 days past the original notice, we make a new request. Before continuing work near Toliver Avenue, we refresh any worn or moved marks.

What affects the price of directional boring near FM 1242 in Bynum?

The scope drives the price: bore length, pipe size, Chatt clay, pavement, utility crossings and the pits or equipment needed all matter. A route under FM 1242 also involves state right of way planning. Bynum is 273 road miles from the Yukon office, so mobilization is another job factor. We need the route details to assess the work.

Where the Bynum facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Bynum

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Bynum, Texas

Type the address of your job in Bynum. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Bynum

Same county: Whitney · Itasca · Hubbard · Blum · Mount Calm · Covington · Penelope · Aquilla. All counties: Texas county list.