trinityboringsolutions.com

Jonestown Texas Directional Boring: Brackett Soil, Glen Rose Limestone and Big Sandy Creek

Quick Answer: Can your line pass under Big Sandy Creek or a Jonestown street without cutting the surface? We plan directional boring, also called horizontal directional drilling (HDD), for road and creek routes in Jonestown, Texas. Jonestown is 395 road miles from our Yukon, Oklahoma main office, so mobilization matters for work near RM 1431. Brackett and Eckrant soils are common here, while shallow mapped bedrock can slow a bore and call for rock tooling.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Jonestown bores at a glance

  • Incorporated city in Travis County, Texas. Population 2,615 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 395 miles, about 7.7 hours of driving.
  • Ground: Brackett soil is mapped on 45 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 83 percent of the area.
  • Highways inside the boundary: RM 1431. State permit office: TxDOT Austin District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Big Sandy Creek, Collier Hollow and Lime Creek.
  • Public water: Jonestown Water Supply Corporation, surface water.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring along Reed Parks Road in Jonestown?

Trinity Boring Solutions takes directional boring work in Jonestown, Travis County, including routes along Reed Parks Road. Can you get a water, sewer, gas, electric conduit or fiber line beneath a Jonestown street without cutting the pavement? The Census Bureau Vintage 2024 estimate puts Jonestown at 2,615 people. Those lines can run along Reed Parks Road or other local streets, with a bore planned around the route and marked utilities.

Our main office is in Yukon, Oklahoma, and Jonestown work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have drilled directionally since 1982. On routes near Jonestown Water Supply Corporation mains and Reed Parks Road, our record stands at more than 25 years without a utility strike.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does Brackett soil mean for boring in Jonestown?

The USDA soil survey maps Brackett soil across 45 percent of Jonestown and Eckrant across 38 percent, so the route can change from one ground type to another. Gravelly clay loam covers 45 percent of the mapped area, while very stony clay accounts for 38 percent. At about 40 inches below the surface, bedrock is mapped across 83 percent of the area; silty clay is mapped across 3 percent. Brackett and Eckrant soil maps help us plan boring, but they are not test borings. Clay can stick to the reamer and grip pipe, so the ground along Reed Parks Road needs a plan for staged reaming and fluid control.

USDA soil survey, inside the Jonestown city limitsWhat is mapped
Soil series mappedBrackett 45 percent and Eckrant 38 percent
Texture at the surfacegravelly clay loam 45 percent and very stony clay 38 percent
Texture about 40 inches downbedrock 83 percent and silty clay 3 percent
Average clay content about 40 inches down32 percent
Bedrock mapped within 60 inches83 percent of the area (38 percent hard rock, 45 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils1 percent of the area
High corrosion risk for uncoated steel41 percent of the area

The USDA survey maps bedrock within 40 inches across 83 percent of Jonestown, including hard bedrock across 38 percent of the area within 60 inches. A drill may need rock tooling, and the soil to rock change can push the head off line. The survey maps no seasonal water table within 60 inches, but flood prone soils cover 1 percent of the area, a detail to check near Big Sandy Creek. High steel corrosion risk is mapped across 41 percent, so the line owner should consider casing and tracer wire materials; HDPE is unaffected by soil corrosion. The mapped geologic unit is Glen Rose Limestone of Albian age.

How do we bore through Jonestown bedrock?

For a Jonestown route where bedrock is mapped close to the surface, we match the bit and drilling plan to the ground along that specific path. Brackett and Eckrant soil patterns are a starting point, not a substitute for checking the actual bore route.

  1. Because bedrock is mapped within 40 inches across much of Jonestown, we select tooling for the route and check depth and pitch as the head advances.
  2. Brackett and Eckrant ground can vary along Reed Parks Road, so we adjust the drilling fluid and ream in stages rather than assume one soil condition.
  3. Before a bore near Big Sandy Creek, we plan to stay beneath the channel and check whether the water crossing falls under Corps jurisdiction.
  4. For a route near Jonestown Water Supply Corporation lines or reported electric service, we hydrovac expose marked utilities before drilling close to them.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

What does a bore have to cross in Jonestown near Big Sandy Creek?

RM 1431 is the state highway inside Jonestown, with 4.8 mapped roadway miles in the city, so a route beneath it needs highway planning. Reed Parks Road is the longest named local street at 4.62 miles, followed by Old Burnet Road at 2.94 miles and Reed Park Road at 1.67 miles. A bore can keep pavement and driveways uncut, but the route, pits and marked utilities still need to fit the street corridor. No other highway is listed within 1.5 miles outside the city limits.

CrossingTypeMapped extentWho has a say
RM 1431State highway4.8 roadway miles insideState highway office
Big Sandy CreekStream1.11 channel miles insideChecked for Corps of Engineers jurisdiction
Collier HollowStream0.44 channel miles insideChecked for Corps of Engineers jurisdiction
Lime CreekStream0.31 channel miles insideChecked for Corps of Engineers jurisdiction
Fisher HollowStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Lake TravisLake or pond13,432 acres, insideChecked for Corps of Engineers jurisdiction
Sandy Creek ArmLake or pond309 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Jonestown or within 1 mile outside its limits, and no mapped street and rail crossing appears in the city. Big Sandy Creek runs 1.11 channel miles inside Jonestown; Collier Hollow and Lime Creek are also mapped streams. Public records show 3 street crossings of named streams, so a route near those channels needs careful depth planning. Lake Travis and Sandy Creek Arm are inside the limits, and water crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

Who permits a Jonestown bore in Travis County?

Jonestown is incorporated, so its city streets belong to the city; RM 1431 is state highway right of way reviewed by the TxDOT Austin District. For work in that right of way, the utility owner files through TxDOT’s online RULIS system, and we prepare the bore plan and profile for its application. TxDOT cover rules set different depths by line type and crossing: electric and communication lines need 60 inches below the lowest crossed grade, water lines need 60 inches, and pressurized sewer lines need 60 inches. The district may set another depth in the permit. A Big Sandy Creek route is checked for Corps jurisdiction, and no railroad is mapped here. For a bore along Reed Parks Road, the caller requests Texas811 locates at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. A delayed start beyond 14 days after the original notice requires a new request; worn or moved marks must be refreshed through Texas811.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near Jonestown Water Supply Corporation?

Jonestown Water Supply Corporation is a local government owned public water system using surface water; it serves 7,902 people through 2,634 service connections. For electric service in Travis County, Oncor Electric Delivery Company, Austin Energy, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative report service. Those county reports do not identify the provider at every Reed Parks Road address, so we confirm the line owner before planning an electric conduit bore.

Line ownerWhat it isSourceSize
Jonestown Water Supply CorporationPublic water systemSurface water2,634 connections, 7,902 people served
Oncor Electric Delivery Company, Austin Energy, Bluebonnet Electric Cooperative and Pedernales Electric CooperativeElectric utilities reporting service in Travis CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Jonestown’s median housing year at 2002; 59 percent of homes date to 2000 or later, 39 percent to 1960 through 1999, and 2 percent to before 1960. That mix can mean either replacement work or a newer service connection, so age alone does not establish what is buried. Near Jonestown Water Supply Corporation lines or reported electric routes, hydrovac potholing exposes each marked utility before drilling close to it; surface marks show position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

Do you cover Jonestown and nearby Lago Vista?

Jonestown is an incorporated city in Travis County at an elevation of 737 feet, covering 6.53 square miles. Jonestown ZIP codes are 78645 and 78641, so we confirm underground work locations within Travis County before planning. Volente is 2.9 miles southeast, Lago Vista is 4.0 miles southwest, and Hudson Bend is 4.6 miles south. Lago Vista is the nearest larger city, while Austin, the county seat, is 16.5 miles southeast. Our Yukon yard is 395 road miles away, a 7.7 hour drive, which is part of planning mobilization for work near RM 1431 or Big Sandy Creek.

Places near Jonestown

What boring work comes up along Old Burnet Road in Jonestown?

  • Highway crossing: A bore beneath RM 1431 needs a route and cover plan suited to state highway pavement and the TxDOT Austin District review.
  • Water service: A connection near Jonestown Water Supply Corporation lines needs the owner and existing service locations confirmed before the new route is set.
  • Creek crossing: A route beneath Big Sandy Creek needs channel depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
  • Street bore: A line along Reed Parks Road can pass beneath pavement and driveways, with pits placed in dirt where the route allows.
  • Replacement line: Work near Old Burnet Road can replace an aging service or carry a new line, depending on what the marked route reveals.
  • Lake area conduit: A route near Lake Travis needs careful planning around the water edge, access and any utilities marked along the bore path.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of directional boring near RM 1431 in Jonestown?

For a Jonestown quote near RM 1431, send the address or map pin, what is going in the ground, pipe or conduit size and footage; a sketch or plans help. The route matters as much as the endpoints. A map showing Reed Parks Road, nearby utilities and any creek or drainage crossing helps us understand where pits and access could fit.

A straightforward route along Old Burnet Road with few marked utilities and no creek crossing is simpler to plan than a path through Brackett soil and shallow bedrock. Length, pipe size, soil and rock, utility exposures, pavement, drainage crossings, pits, excavator time and sand backfill all affect the work. A route beneath RM 1431 brings highway requirements into the plan, while Jonestown’s 395 road miles from Yukon can affect mobilization. High profile or emergency work near RM 1431 can change boring scope and affect coordination with the TxDOT Austin District.

Questions people ask about boring in Jonestown

Does Trinity Boring Solutions take directional boring jobs in Jonestown, Travis County, and how are crews assigned?

Yes, we take directional boring work in Jonestown, Travis County, and staff it with our own crews or crews from vetted partner contractors operating from satellite yards. You work with Trinity from the first call through the bore log, including for a route along Reed Parks Road.

Who owns electric lines in Jonestown, Travis County, and who confirms conduit specifications?

Electric service reported in Travis County includes Oncor Electric Delivery Company, Austin Energy, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative. We confirm which line owner applies at the specific Jonestown address before planning a conduit bore, then verify conduit specifications with that owner.

Does the city or county control Reed Park Road in Jonestown, and can a bore avoid cutting it?

Jonestown is incorporated, so Reed Park Road is a city street rather than a county street. Directional boring can place a line beneath the roadway without opening the pavement, subject to the route and utility locations. We expose marked lines before the drill approaches them.

Are buried lines old along Old Burnet Road in Jonestown, and does that affect replacement bores?

The American Community Survey 2019 to 2023 estimates give Jonestown a median housing year of 2002, with 39 percent of homes built from 1960 through 1999 and 59 percent in 2000 or later. Housing age does not date a buried line, so a replacement bore along Old Burnet Road needs locates and potholing.

Can Brackett soil in Jonestown corrode steel, and what pipe should a bore use?

The USDA soil survey maps high steel corrosion risk across 41 percent of Jonestown, including areas with Brackett soil. The line owner chooses the pipe and any coating for steel casing or tracer wire; HDPE is unaffected by soil corrosion. The soil map is not a test of a specific bore route.

What ground will a bore encounter in Jonestown Brackett soil at about 40 inches?

The USDA soil survey maps Brackett across 45 percent of Jonestown and bedrock at about 40 inches across 83 percent of the area. Gravelly clay loam is mapped across 45 percent, while very stony clay covers 38 percent. Those changes can affect tooling, reaming and steering along the route.

What bore sizes and lengths can Trinity handle near Lantern View Drive in Jonestown?

For crossings near Big Sandy Creek, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A job near Lantern View Drive still depends on the specific route, ground and access, including whether the mapped shallow bedrock affects tooling or bore length.

How early should I call Texas811 for a Jonestown bore along Reed Parks Road, and what if marks move?

For a Reed Parks Road bore, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days past the original notice, make a new request; have worn or moved marks refreshed through Texas811 before work continues.

What affects the cost of directional boring near RM 1431 in Jonestown?

The scope near RM 1431 depends on length, pipe or conduit size, Brackett soil and bedrock, marked utility crossings, pavement, creek or drainage crossings, pits and backfill. State highway planning and the 395 road miles from Yukon can also affect mobilization. We need the route details to assess the work.

Where the Jonestown facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Jonestown

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Jonestown, Texas

Type the address of your job in Jonestown. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Jonestown

Same county: Austin · Pflugerville · Manor · Lakeway · Wells Branch · Bee Cave · Hornsby Bend · Shady Hollow · West Lake Hills · Barton Creek · Briarcliff · The Hills. All counties: Texas county list.