trinityboringsolutions.com

Magnolia Beach Texas Directional Boring: Livia Clay Loam, FM 2760 and Old Town Lake

Quick Answer: Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for routes beneath FM 2760 and other Magnolia Beach roads. At 536 road miles from our Yukon, Oklahoma main office, a route near Margie Tewmey Road needs mobilization built into the plan. USDA maps Livia clay loam across much of the community, and sticky clay can load a reamer and grip pipe. We stage reaming and manage fluid for a bore under FM 2760 to limit pressure while keeping the road surface intact.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Magnolia Beach bores at a glance

  • Unincorporated community in Calhoun County, Texas. Population 217 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 536 miles, about 10.9 hours of driving.
  • Ground: Livia soil is mapped on 83 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 2760. State permit office: TxDOT Yoakum District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can bore beneath FM 2760 in Magnolia Beach?

We take directional boring work in Magnolia Beach, an unincorporated community in Calhoun County with 217 people in the 2020 Census count. A water, sewer, gas, electric conduit or fiber line can be routed beneath a road such as FM 2760 or a local street. Since there is no city government, the road authority depends on whether the route is on a county street or a state highway.

Our main office is in Yukon, Oklahoma, and Magnolia Beach work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa; a service bore near FM 2760 is a different scale of job, with Livia clay loam shaping the drill plan.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What is the ground like to bore in Magnolia Beach Livia soil?

The USDA soil survey maps Livia across 83% of Magnolia Beach. At about 40 inches below the surface, clay loam makes up 46% of the mapped area, while 40% is silty clay loam and 7% is silty clay. The average clay content at that depth is 37%, and heavy clay is mapped across 93%. These are mapped soil patterns, not test borings. The clay can stick to a reamer and grip pipe, so the bore plan needs staged reaming and fluid suited to the soil.

USDA soil survey, inside the Magnolia Beach mapped community boundaryWhat is mapped
Soil series mappedLivia 83 percent, Placedo 10 percent and Matagorda 3 percent
Texture at the surfacesilt loam 47 percent, clay loam 36 percent and silty clay 10 percent
Texture about 40 inches downclay loam 46 percent, silty clay loam 40 percent and silty clay 7 percent
Engineering class about 40 inches downfat clay (CH) 83 percent and lean clay (CL) 14 percent
Average clay content about 40 inches down37 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches99 percent of the area
Flood prone soils16 percent of the area
High corrosion risk for uncoated steel96 percent of the area

For Magnolia Beach, soil mapping shows no bedrock within the top five feet; the geologic map identifies Delta Sand and Silt of Late Pleistocene age instead. That unit includes sand, silt, clay and gravel, so conditions can change along a route. A seasonal water table is mapped within 40 inches across 99% of the area, which can fill pits. Flood prone soils cover 16%, and high steel corrosion risk covers 96%; the line owner should account for that risk when specifying steel casing or tracer wire.

What does it take to bore Magnolia Beach clay loam?

Livia clay loam and a shallow seasonal water table call for controlled fluid and a ready work area. For a Magnolia Beach bore, we match the reaming sequence and pit plan to the street and the mapped ground.

  1. With the mapped Livia clay loam, we use fluid and staged reaming suited to sticky ground, then plan to pull the pipe while the opened hole is ready.
  2. The 47% silt loam surface share can soften when wet, so near Margie Tewmey Road we keep fluid pressure controlled beneath pavement.
  3. Because seasonal water is mapped within 40 inches across 99% of Magnolia Beach, we plan manageable pits and pump them if water collects.
  4. Before the drill approaches a marked utility on a route near FM 2760, we hydrovac pothole it; paint marks location, not depth.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

What does a bore have to cross in Magnolia Beach near FM 2760?

FM 2760 runs through the mapped Magnolia Beach community, with about 1.0 roadway mile inside it. Texas State Highway 316 touches the boundary, and FM 2117 is 0.8 miles away. A route along Margie Tewmey Road, Morris Avenue or La Lucia Street has different access and utility exposure to plan around. Boring can place a line beneath these paved routes without cutting the street surface, with the entry and exit pits set off the road where the work area allows.

CrossingTypeMapped extentWho has a say
FM 2760State highway1 roadway miles insideState highway office
Texas State Highway 316Highway nearbyRuns along or touches the city limitsState highway office
FM 2117Highway nearby0.8 miles outsideState highway office
Old Town LakeLake or pond104 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The mapped inventory shows no railroad inside Magnolia Beach or within 1 mile, so no local rail crossing is identified. It also shows no named streams inside or within 1 mile. The community does have 2.83 miles of unnamed drainage and Old Town Lake, mapped at 104 acres inside the boundary. A proposed route near the lake or drainage needs its crossing conditions checked during planning, including whether the lake falls under U.S. Army Corps of Engineers jurisdiction.

Who approves a Magnolia Beach bore in Calhoun County?

Magnolia Beach has no city government, so street authority rests with Calhoun County or the state, depending on the road. For work in the FM 2760 right of way, the line owner, not the driller, files the utility application in TxDOT’s RULIS system; TxDOT’s Yoakum District reviews it. We give the utility owner the bore plan and profile and work under its permit. At a highway crossing, electric and communication lines need 60 inches of cover below the lowest crossed grade; water needs 60 inches and pressurized sewer needs 60 inches. TxDOT requires boring or tunneling beneath an existing highway.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Magnolia Beach, Calhoun County?

The water provider for a particular Magnolia Beach address has to be confirmed with Calhoun County or the local water district before a bore is planned. EPA drinking water records do not tie a system to this community by name, so the address needs a direct provider check. AEP Texas Central, Jackson Electric Cooperative and Victoria Electric Cooperative report electric service in Calhoun County. We confirm the owner of the specific line before planning a conduit bore near FM 2760.

Line ownerWhat it isSourceSize
AEP Texas Central, Jackson Electric Cooperative and Victoria Electric CooperativeElectric utilities reporting service in Calhoun CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Magnolia Beach’s median housing year at 2012; 66% of units were built in 2000 or later and 34% from 1960 to 1999. That mix can mean either a replacement line or a new service needs a path beneath a developed street. Before drilling near a marked utility, we expose each marked line on the bore path to verify its depth. For a proposed conduit route under La Lucia Street, that means potholing the marked utilities there first.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

Do you cover Magnolia Beach and nearby Port Lavaca?

Magnolia Beach is in Calhoun County on 1.02 square miles of mapped land, at an elevation of 8 feet, and its ZIP code is 77979. Alamo Beach is 1.2 miles northwest; Port Lavaca, the county seat and nearest larger city, is 6.2 miles northwest. Point Comfort is 7.5 miles north, Port O’Connor is 11.1 miles southeast and Seadrift is 14.4 miles southwest. Our Yukon, Oklahoma yard is 536 road miles away, a 10.9 hour drive. We take work in Magnolia Beach, Port Lavaca and rural areas outside the mapped community.

Places near Magnolia Beach

What boring work comes up on Magnolia Beach’s Morris Avenue?

  • Highway crossing: A proposed water or conduit bore beneath FM 2760 needs a route plan that accounts for the state highway right of way.
  • Water service: A service run near Margie Tewmey Road needs its address specific water provider confirmed before we set the bore plan.
  • Electric conduit: Near Morris Avenue, we first confirm which Calhoun County reporting utility owns the line that the new conduit will serve.
  • Drainage crossing: A proposed route near the 2.83 miles of unnamed drainage needs a path that accounts for the mapped wet ground.
  • Lake approach: If a Magnolia Beach route meets Old Town Lake, we check crossing conditions and whether Corps jurisdiction applies during planning.
  • Street conduit: For a planned conduit beneath La Lucia Street, we expose marked utilities before the drill approaches their mapped locations.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Magnolia Beach bore near Margie Tewmey Road?

For a Magnolia Beach quote, start with the address or map pin, such as a spot on Margie Tewmey Road. Tell us what goes in the ground, the pipe or conduit size, and the footage. A sketch or plans help us see how a route near FM 2760 meets the road and existing utilities before we build the scope.

A Magnolia Beach bore is simpler to plan when the route is clear, the line size and footage are set, and there are few utilities or paved areas to work around. Length, pipe size, Livia clay loam, exposed utilities, pavement, drainage crossings, pits, excavator time and sand backfill all affect the scope. Work beneath FM 2760 adds highway planning, while a 536 road mile mobilization from Yukon also matters. High profile or emergency work can require more planning.

Questions people ask about boring in Magnolia Beach

Does Trinity take directional boring work in Magnolia Beach, Calhoun County?

Yes. We take directional boring work in Magnolia Beach, and crews are assigned from our own team or vetted partner contractor yards. You work with Trinity from the first call through the bore log, whether the route is near FM 2760 or on a local street.

What ground should I expect for a Magnolia Beach bore through Livia soil?

The USDA soil survey maps Livia across 83% of Magnolia Beach. At about 40 inches down, clay loam covers 46% of the mapped area and silty clay loam covers 40%. That clay can stick to the reamer and grip pipe, so we plan staged reaming and manage drilling fluid.

Will a bore in Magnolia Beach hit rock?

The soil mapping shows no bedrock within the top five feet of Magnolia Beach, but that does not rule out deeper rock. The geologic map identifies Delta Sand and Silt of Late Pleistocene age, a mix of sand, silt, clay and gravel. The planned route still needs site specific evaluation.

Who approves a Magnolia Beach bore under FM 2760?

For work in the FM 2760 right of way, the utility line owner files the permit application through TxDOT’s RULIS system, not the drilling contractor. TxDOT’s Yoakum District reviews it. We provide the bore plan and profile for the utility owner to use with its application.

Who owns electric lines in Magnolia Beach, Calhoun County, and who sets conduit specs?

AEP Texas Central, Jackson Electric Cooperative and Victoria Electric Cooperative report electric service in Calhoun County, but that does not identify the owner at every Magnolia Beach address. Confirm the line owner for the specific route; that owner sets the conduit requirements before a bore is planned near Morris Avenue.

Does Magnolia Beach control La Lucia Street, and does a bore require cutting it?

Magnolia Beach is unincorporated and has no city government, so public street authority rests with the county or state. A bore beneath La Lucia Street can leave the pavement uncut, with pits placed in the dirt beside the route where access allows. The road authority depends on the street’s status.

Does Trinity cover Alamo Beach and rural sites outside Magnolia Beach?

Yes. We take work in Alamo Beach, 1.2 miles northwest, as well as Magnolia Beach and rural sites outside its mapped boundary. A route near Port Lavaca can also be discussed with us; it is 6.2 miles northwest and the Calhoun County seat.

How early should I call Texas811 for a Magnolia Beach bore near Margie Tewmey Road?

Paint near Margie Tewmey Road shows utility position, not depth. Texas law requires a Texas811 request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days past the original notice, make a new request; refresh worn or moved marks before work continues.

What affects the cost of a directional bore under FM 2760 in Magnolia Beach?

The scope sets the price. Length, pipe or conduit size, Livia clay loam, utility exposures, pavement, drainage crossings and pit or excavator work all matter. A route beneath FM 2760 requires highway planning, and mobilization from the Yukon yard matters because Magnolia Beach is 536 road miles away.

Where the Magnolia Beach facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Magnolia Beach

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Magnolia Beach, Texas

Type the address of your job in Magnolia Beach. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Magnolia Beach

All counties: Texas county list.