Point Comfort Texas Directional Boring: Dacosta Clay, Highway 35 and Cox Creek
Quick Answer: Need a line routed beneath Fannin Street, the Point Comfort and Northern Railway or Cox Creek without opening the surface? Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), across Point Comfort and Texas for those crossings. The Yukon, Oklahoma main office is 534 road miles away, a factor for work near Texas State Highway 35. Dacosta soil and heavy clay mapped below can cling to tooling, so staged reaming and fluid control matter.
Point Comfort bores at a glance
- Incorporated city in Calhoun County, Texas. Population 562 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 534 miles, about 10.8 hours of driving.
- Ground: Dacosta soil is mapped on 49 percent of the area, with clay about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Texas State Highway 35 and FM 1593. State permit office: TxDOT Yoakum District.
- Railroad track inside the boundary: Point Comfort and Northern Railway, with 3 mapped street and rail crossings.
- Public water: City of Point Comfort, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in Point Comfort near Cox Creek?
Need a line beneath Fannin Street or the Point Comfort and Northern Railway without cutting across it? We take directional boring work in Point Comfort, Calhoun County, where the Census Bureau Vintage 2024 estimate is 562 residents. We can route water, sewer, gas, electric conduit or fiber beneath Alamo Street or other marked paths, with the line type and route guiding the bore plan.
Our main office is in Yukon, Oklahoma, and Point Comfort work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have had no utility strike in over 25 years, a record we bring to planning around the City of Point Comfort water system and electric lines reported in Calhoun County. Our family business began in 1965, and we have done directional boring since 1982; that experience informs our Point Comfort planning.

What does Dacosta soil mean for boring in Point Comfort?
The USDA soil survey maps Dacosta soil across 49% of Point Comfort and Laewest across 42%. At the surface, clay is mapped across 43% and sandy clay loam across 42%. About 40 inches down, clay is mapped across 91% of the area, with an average clay content of 46%. These are mapped soil patterns, not results from a drill test at your address. Heavy clay can stick to a reamer and grip pipe, so the crew may need staged reaming and a fluid mix suited to the ground.
| USDA soil survey, inside the Point Comfort city limits | What is mapped |
|---|---|
| Soil series mapped | Dacosta 49 percent, Laewest 42 percent, Edna 4 percent and Telferner 3 percent |
| Texture at the surface | clay 43 percent, sandy clay loam 42 percent and clay loam 7 percent |
| Texture about 40 inches down | clay 91 percent and sandy clay 7 percent |
| Engineering class about 40 inches down | fat clay (CH) 91 percent and lean clay (CL) 9 percent |
| Average clay content about 40 inches down | 46 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 9 percent of the area |
| Flood prone soils | 2 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
Bedrock is not mapped in the top five feet of the Point Comfort survey area, which does not rule out deeper rock. Seasonal water table conditions are mapped within 60 inches across 9%, so pits near Alamo Street may need pumping. Flood prone soils cover 2%. High steel corrosion risk is mapped throughout the area, a concern for uncoated casing or tracer wire that the line owner should address. The Late Pleistocene Delta sand and silt unit includes clayey deposits, so actual ground can vary along a bore.
How do we drill through Point Comfort clay?
At about 40 inches, Point Comfort is mapped as heavy clay across most of its area. We plan the bore around the Dacosta and Laewest ground and adjust the drilling sequence as the soil and returns show what the hole is doing.
- Because clay is mapped across 91% of Point Comfort at about 40 inches, we use staged reaming and manage sticky cuttings before pulling pipe.
- Heavy clay can build pressure under pavement near Fannin Street, so the crew watches fluid returns and avoids pushing fluid hard against the surface.
- The seasonal water table is mapped within 60 inches across 9% of the area; small pits and pumping can help where Alamo Street ground is wet.
- Before drilling near the City of Point Comfort water system or electric lines reported in Calhoun County, we hydrovac marked utilities and track the head from the surface.

Where might a Point Comfort line pass beneath Fannin Street?
Texas State Highway 35 runs 3.1 mapped roadway miles inside Point Comfort, and FM 1593 adds 1.0 mile. A line crossing either road needs a different plan from a service bore along a local street. Fannin Street is the longest named street at 0.93 miles; Alamo Street runs 0.67 miles, while Lamar Street and Wood Street each run 0.59 miles. Those routes can put pavement, driveways or nearby utilities in the bore path, so the entry and exit pits need to fit the actual site.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 35 | State highway | 3.1 roadway miles inside | State highway office |
| FM 1593 | State highway | 1 roadway miles inside | State highway office |
| Point Comfort and Northern Railway | Railroad | 2.01 track miles inside | The railroad |
| Union Pacific | Railroad nearby | 0.1 miles outside | The railroad |
| Cox Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Cox Creek Lake | Lake or pond | 312 acres, nearby | Checked for Corps of Engineers jurisdiction |
The Point Comfort and Northern Railway has 2.01 track miles inside city limits, and public mapping shows 3 street and rail crossings. Union Pacific track lies 0.1 miles outside the limits. No named streams are mapped inside Point Comfort; Cox Creek is 0.9 miles outside, and Cox Creek Lake is also outside the limits. The city has 0.55 miles of unnamed drainage, so a proposed route near drainage needs a site check rather than an assumed creek crossing.
For a bore beneath Texas State Highway 35 in Point Comfort, which authority should we contact for approval?
Texas State Highway 35 and FM 1593 are state roads, so TxDOT handles work in their right of way through the Yoakum District. The utility owner, not our drilling crew, submits the utility permit application in TxDOT’s RULIS system; we prepare the bore plan and profile for the work under that permit. TxDOT requires utility lines beneath an existing highway to be bored or tunneled, with casing at crossings. For a line crossing the Point Comfort and Northern Railway, the railroad that owns the track sets the crossing agreement terms. A proposed Cox Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Point Comfort near the City of Point Comfort system?
The City of Point Comfort public water system uses surface water and reports 253 service connections serving 759 people. For electric service in Calhoun County, AEP Texas Central, Jackson Electric Cooperative and Victoria Electric Cooperative report service. That does not identify the provider at every address near Fannin Street. Before planning an electric conduit bore, we confirm the line owner and its conduit specifications for the exact route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Point Comfort | Public water system | Surface water | 253 connections, 759 people served |
| AEP Texas Central, Jackson Electric Cooperative and Victoria Electric Cooperative | Electric utilities reporting service in Calhoun County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put the median home year in Point Comfort at 1959. The estimates show 55% of homes built before 1960 and 6% built in 2000 or later. An older service near Alamo Street may call for a replacement bore, while a newer connection may need a different route. Before drilling near a marked water or electric line, we hydrovac pothole to check its depth; paint alone does not show how deep it sits.

Do you cover Point Comfort and nearby Port Lavaca?
Point Comfort is an incorporated city in Calhoun County, with an area of 1.31 square miles and an elevation of 20 feet. For Point Comfort projects, we check that ZIP codes 77979 and 77978 identify the intended service location. Port Lavaca, the county seat and nearest larger city, is 5.6 miles southwest. Alamo Beach is 6.7 miles south, Magnolia Beach is 7.5 miles south, Vanderbilt is 11.0 miles north and Lolita is 11.4 miles north. From our Yukon, Oklahoma main office, the road distance is 534 miles and the drive is 10.8 hours, which affects mobilization for work near Texas State Highway 35.
Places near Point Comfort
- Directional boring in Port Lavaca: 5.6 miles southwest
- Directional boring in Alamo Beach: 6.7 miles south
- Directional boring in Magnolia Beach: 7.5 miles south
- Directional boring in Vanderbilt: 11 miles north
- Directional boring in Lolita: 11.4 miles north
Which jobs call for a bore near Lamar Street in Point Comfort?
- Highway crossing: A bore beneath Texas State Highway 35 keeps the line below the road surface, with the permit and profile set for the route.
- Water service: A service connection near Alamo Street can run beneath pavement instead of cutting across the street.
- Fiber conduit: A route along Fannin Street can use a bore to pass beneath driveways and marked utilities.
- Rail crossing: A line crossing the Point Comfort and Northern Railway needs a plan coordinated with the railroad that owns the track.
- Drainage crossing: A proposed route near Cox Creek needs its channel conditions checked and the crossing reviewed for federal jurisdiction.
- Water main work: A replacement route near the City of Point Comfort system can avoid open cuts where marked utilities and access allow.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to price a Point Comfort and Northern Railway bore?
Send an address or map pin for the proposed route. A pin near Fannin Street or the Point Comfort and Northern Railway matters because it shows which pavement, track or drainage features sit in the way. For Point Comfort work, we need the material going underground, plus the pipe or conduit size and footage. A sketch or plans help us check pits, access and crossings before we scope the bore.
A short service route along Lamar Street with no track or highway crossing is simpler to plan than a route beneath Texas State Highway 35 or the Point Comfort and Northern Railway. Cost depends on length, pipe or conduit size, the Dacosta heavy clay, and how many utilities need to be exposed. Pavement, pits, excavator time, sand backfill and drainage crossings can add work. With 534 road miles from Yukon, we factor the trip into mobilization planning for Point Comfort boring work.
Questions people ask about boring in Point Comfort
Does Trinity take directional boring jobs in Point Comfort, Calhoun County, and how are crews assigned?
Yes. We take directional boring work in Point Comfort, Calhoun County, and coordinate it through our Yukon main office. Our own crews and vetted partner drilling contractors staff the work from satellite yards. You work with Trinity from the first call through the bore log, whether the route is near Fannin Street or the Point Comfort and Northern Railway.
Can you bore beneath Cox Creek near Point Comfort?
A bore beneath Cox Creek can be considered if the route and ground conditions suit the crossing. The creek is mapped 0.9 miles outside Point Comfort, so the precise location matters. We check the channel route and assess U.S. Army Corps of Engineers jurisdiction during planning before setting the bore approach.
Who runs the Point Comfort water system, and where does its water come from?
Because the City of Point Comfort owns the public water system and uses surface water, we plan around local water infrastructure. The system’s 253 service connections serve 759 people, figures we consider when coordinating underground work in Point Comfort. For a bore near the system, the planned route still needs utility locating and potholing so the crew can confirm the marked line depth.
Which electric companies report service in Point Comfort, Calhoun County, and who confirms conduit specs?
In Calhoun County, we account for service reported by AEP Texas Central, Jackson Electric Cooperative and Victoria Electric Cooperative when planning utility coordination. They are not necessarily the provider at every Point Comfort address. We confirm the owner of the line and its conduit specifications for a proposed route, such as one near Alamo Street.
Who is responsible for Point Comfort streets, and can a bore under Lamar Street avoid a cut?
Since Point Comfort is incorporated, we coordinate street work with the city because its streets belong to the city itself. A directional bore beneath Lamar Street can avoid cutting the road when the route, access and ground allow it. Utility marks and potholes help locate the existing lines before drilling near them.
How old are homes and buried lines near Alamo Street in Point Comfort, and what does that mean for a replacement bore?
The American Community Survey 2019 to 2023 estimates give Point Comfort a median home year of 1959, with 55% of homes built before 1960. That can make a replacement service route near Alamo Street worth considering, but home age does not establish buried line age. We locate and expose marked utilities before choosing the bore path.
What bore sizes and lengths can Trinity handle in Point Comfort near Wood Street?
We handle lines from 3/4 inch service size up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The actual fit for a route near Wood Street depends on the line, soil, access and crossings. A map pin and plans help us scope the equipment and bore.
How much notice does Texas811 need for a Point Comfort bore near Fannin Street, and what if marks move?
Make the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a Fannin Street start slips more than 14 days past the original notice, submit a new request. Before continuing a Point Comfort bore, we have worn or moved marks refreshed through Texas811.
What affects the cost of directional boring in Point Comfort near Texas State Highway 35?
For Point Comfort work, we base cost on the job scope and the boring requirements it describes. Length, pipe or conduit size, Dacosta clay, utility crossings, pavement, pits and drainage work all matter. A route under Texas State Highway 35 needs more planning than a short service bore along a local street, and mobilization from Yukon is another factor.
Where the Point Comfort facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Point Comfort
- U.S. Census Bureau, TIGER/Line 2024: Point Comfort boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Point Comfort
- U.S. Census Bureau, American Community Survey 2019 to 2023: Point Comfort housing units and year built
- Macrostrat geologic map compilation: map units under Point Comfort
- U.S. EPA Safe Drinking Water Information System: public water systems serving Point Comfort
- U.S. Department of Transportation, North American Rail Network: track owners in Calhoun County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Calhoun County
- U.S. Geological Survey, Elevation Point Query Service: Point Comfort elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Point Comfort
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Point Comfort
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Point Comfort, Texas
Type the address of your job in Point Comfort. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Point Comfort
Same county: Port O'Connor · Seadrift. All counties: Texas county list.
