Post Texas Directional Boring: Olton Clay Loam, US 84 and Sand Creek
Quick Answer: Can your line pass under Sand Creek or a Post road without cutting the surface? Yes, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for crossings in Post, Texas. Post is 357 road miles from our Yukon, Oklahoma main office, so a US 84 crossing also needs mobilization planned around the distance. The USDA soil survey maps Olton clay loam across much of town, and sticky clay can load the reamer and grip pipe. In Olton clay loam, staged reaming and a same day pull help keep the hole from gripping the pipe.
Post bores at a glance
- County seat of Garza County, Texas. Population 3,594 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 357 miles, about 7.2 hours of driving.
- Ground: Olton soil is mapped on 54 percent of the area, with clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 10 percent of the area.
- Highways inside the boundary: US 84, US 380, Texas State Highway 207, FM 122 and FM 651. State permit office: TxDOT Lubbock District.
- Railroad track inside the boundary: BNSF Railway, with 8 mapped street and rail crossings.
- Named streams inside the boundary: Sand Creek.
- Public water: City of Post, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can bore beneath Sand Creek in Post?
Can a line cross beneath Sand Creek or a Post street without opening the surface? Yes. We take directional boring work in Post, Garza County, where the Census Bureau Vintage 2024 estimate lists 3,594 residents. Water, sewer, gas, electric conduit and fiber can be routed beneath Main Street or 8th Street when the plan and clearances fit.
Our main office is in Yukon, Oklahoma, and Post work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. From a 3/4 inch service line beneath Avenue F to 48 inch casing for a larger US 84 crossing, our equipment covers a wide range. For a Post crossing, our family business dates to 1965, and we have done directional boring since 1982.

What is Olton soil like to bore in Post?
The USDA soil survey maps Olton soil across 54 percent of Post, including Olton clay loam on 47 percent of the mapped area. At about 40 inches below the surface, clay loam is mapped across 57 percent, and fine sandy loam across 16 percent. For underground work in Post, the average clay content at that depth is 34 percent, a factor in planning the bore. Before planning a bore in Post, we treat these as mapped soil patterns, not test borings. For a bore near Main Street, clay can stay packed around the reamer and grip the pipe, while the sandy portions may need support to keep the hole open.
| USDA soil survey, inside the Post city limits | What is mapped |
|---|---|
| Soil series mapped | Olton 54 percent, Mobeetie 16 percent, Miles 12 percent, Vernon 10 percent and Bippus 3 percent |
| Texture at the surface | clay loam 66 percent, fine sandy loam 28 percent and loam 3 percent |
| Texture about 40 inches down | clay loam 57 percent, fine sandy loam 16 percent and sandy clay loam 15 percent |
| Engineering class about 40 inches down | lean clay (CL) 61 percent, silty clayey sand (SC SM) 17 percent and clayey sand (SC) 12 percent |
| Average clay content about 40 inches down | 34 percent |
| Bedrock mapped within 60 inches | 10 percent of the area (0 percent hard rock, 10 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 67 percent of the area |
Bedrock is mapped within 60 inches in 10 percent of Post, and the typical mapped depth is 28 inches; the mapped bedrock is weathered, with hard bedrock not mapped in that depth. Seasonal water table and flood prone soils are not mapped, but Sand Creek still needs site planning. High steel corrosion risk is mapped across 67 percent of the area, so the line owner should consider casing and tracer wire materials; HDPE avoids that steel concern. The Lingos Formation is Cenozoic and includes sand, gravel, clay and silt, while Triassic sedimentary rock is also mapped.
How do we bore Post clay loam?
Olton clay loam covers much of Post, so we plan the bore to manage sticky cuttings and avoid loading the hole with excess fluid. A route beneath Avenue F or near Sand Creek also needs utility checks and a suitable path.
- In Olton clay loam, we use a thinner drilling fluid and polymer, then open the hole in stages to manage sticky cuttings.
- Because Post soils include heavy clay, we watch fluid returns near Main Street so pressure does not lift pavement.
- Where the USDA soil survey maps fine sandy loam, we support the hole and have the pipe ready before the final ream.
- Before a bore near Sand Creek or 8th Street, we pothole marked utilities and track the drill head to log depth and pitch.

What could a bore cross near Main Street in Post?
US 84, US 380, Texas State Highway 207, FM 122, FM 651 and FM 669 run within Post, and highway right of way work needs a TxDOT utility permit. TxDOT Lubbock District reviews the application. Main Street is the longest named street at 2.02 miles, followed closely by Avenue F at 2.0 miles and 8th Street at 1.78 miles. A bore beneath one of these roads can keep pavement intact, subject to the applicable permit and crossing plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 84 | US highway | 4.1 roadway miles inside | State highway office |
| US 380 | US highway | 2.4 roadway miles inside | State highway office |
| Texas State Highway 207 | State highway | 1.2 roadway miles inside | State highway office |
| FM 122 | State highway | 1 roadway miles inside | State highway office |
| FM 651 | State highway | 1 roadway miles inside | State highway office |
| FM 669 | State highway | 0.9 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 3.94 track miles inside | The railroad |
| Sand Creek | Stream | 2.47 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Stink Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Two Draw Lake | Lake or pond | 10 acres, nearby | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 3.94 track miles inside Post on the Slaton Subdivision, and public records map 8 street and rail crossings. A route crossing the track needs an agreement with BNSF that sets crossing conditions. Sand Creek runs 2.47 channel miles through town, with 2 mapped street crossings of named streams. Two Draw Lake is within one mile outside city limits; creek and lake crossings are checked for federal water jurisdiction during planning.
Whose approval does a Post bore in Garza County need?
For Post street bores, we treat incorporated city streets as belonging to the city itself. For work in the right of way of US 84, US 380, Texas State Highway 207, or one of the FM roads, the line owner files the utility permit in TxDOT’s online RULIS system; TxDOT Lubbock District reviews it. We prepare the bore plan and profile for the owner’s application and work under the permit issued to that owner. Under highway crossings, electric and communication lines need 60 inches of cover, water needs 60 inches, and pressurized sewer needs 60 inches. BNSF sets crossing terms for its Post track, and Sand Creek is checked for Corps jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns lines near the City of Post water system?
The City of Post public water system is locally owned and uses purchased surface water. It reports 1,549 service connections and serves 5,471 people, so a proposed water bore near Main Street should be planned with the line owner identified. Electric service reported in Garza County includes Southwestern Public Service, Big Country Electric Cooperative, Lyntegar Electric Cooperative and South Plains Electric Cooperative. We confirm the owner for the specific address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Post | Public water system | Surface water bought from another system | 1,549 connections, 5,471 people served |
| Southwestern Public Service, Big Country Electric Cooperative, Lyntegar Electric Cooperative and South Plains Electric Cooperative | Electric utilities reporting service in Garza County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Post’s median housing year at 1970; 32 percent of homes were built before 1960, while 14 percent date to 2000 or later. Older housing along Avenue F can mean an existing line is being replaced, while a newer service may need a different route. Before drilling near marked utilities, we hydrovac pothole them to check their depth and position.

How far is Post from Slaton and our Yukon office?
Post is the Garza County seat, sits at 2,612 feet elevation, and covers 3.74 square miles. The city’s ZIP code is 79356. Wilson is 21.9 miles northwest, Slaton is 23.5 miles northwest, and Tahoka is 24.0 miles west. Lubbock, the nearest larger city, is 38.9 miles northwest. From our Yukon, Oklahoma main office, Post is 357 road miles away and a 7.2 hour drive, which can affect mobilization for a bore near US 84.
Places near Post
- Directional boring in Wilson: 21.9 miles northwest
- Directional boring in Slaton: 23.5 miles northwest
- Directional boring in Tahoka: 24 miles west
- Directional boring in Fluvanna: 25.4 miles southeast
- Directional boring in Ransom Canyon: 29.3 miles northwest
- Directional boring in Lubbock: 38.9 miles northwest
What kinds of bores might come up near 8th Street in Post?
- Highway crossing: A bore beneath US 84 can avoid cutting the existing pavement, with the route and cover set through the TxDOT permit.
- Water service: A route near the City of Post system needs the line owner identified before planning a bore beneath Main Street.
- Fiber conduit: A bore beneath 8th Street can carry conduit while keeping the street surface intact.
- Creek crossing: A Sand Creek route needs depth planning beneath the channel and a check for Corps jurisdiction.
- Rail crossing: A bore beneath the BNSF Railway track on the Slaton Subdivision needs the railroad’s crossing agreement.
- Street replacement: A bore along Avenue F can route a replacement service beneath the street rather than opening its surface.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Post bore under US 84?
A map pin matters for a US 84 crossing because the exact route determines the road right of way, nearby utilities and where the bore pits can sit. For a Post bore, send us the address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us check a route beneath US 84, Main Street or Sand Creek.
Price follows the ground, crossings and logistics for the specific Post route. Olton clay loam can affect drilling and reaming; pipe size, footage and any rock also matter. A US 84 crossing, BNSF track or Sand Creek adds crossing planning, and marked utilities may need exposure. Pits, pavement, excavator time and sand backfill affect the work. Post is 357 road miles from Yukon, so mobilization, high profile work or an emergency response can change the job scope.
Questions people ask about boring in Post
Does Trinity Boring Solutions take jobs in Post and Garza County?
Yes. We take directional boring work in Post, and Trinity manages the job whether it is handled by our own crew or a vetted partner contractor. You work with us from the first call through the bore log. That applies to a route beneath Sand Creek as well as a service line along a Post street.
Who is responsible for 8th Street in Post, and does it have to be cut?
Post is incorporated, so the city itself is responsible for its city streets, including 8th Street. A directional bore can pass beneath the street without opening the pavement when the route and clearances allow. Work in a state highway right of way, such as US 84, follows a separate TxDOT utility permit process.
How old are houses and buried lines near Avenue F in Post?
The American Community Survey 2019 to 2023 five year estimates put Post’s median housing year at 1970, with 32 percent built before 1960. That does not establish the age of a buried line near Avenue F. For a replacement, potholing marked utilities helps check actual depth and position before the drill approaches.
Does Olton soil in Post corrode steel, and what pipe can we use?
The soil survey maps high steel corrosion risk across 67 percent of Post, so the line owner should consider casing and tracer wire materials for an Olton soil route. For Post installations, HDPE does not share that steel corrosion concern, which can inform our material planning. The appropriate pipe and any coatings depend on the line owner’s project requirements.
What ground does a bore pass through in Olton soil in Post?
Olton is the most common mapped soil series, covering 54 percent of Post. At about 40 inches below the surface, the USDA soil survey maps clay loam across 57 percent and fine sandy loam across 16 percent. Clay can cling to the reamer, while sandy ground may need fluid support to keep the hole open.
Is there rock near the surface on a Post bore route?
The soil survey maps bedrock within five feet in 10 percent of Post, with a typical mapped depth of 28 inches. Weathered bedrock is mapped in 10 percent, while hard bedrock is not mapped within that depth. A route near Sand Creek still needs site specific planning because the map does not describe every bore path.
How much notice does Texas811 need for a Post bore near Main Street?
Count back at least 48 hours from the planned start, excluding Saturdays, Sundays and legal holidays, before digging near Main Street. The request cannot be made more than 14 days before work starts. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
How far is Post from Yukon, and does Lubbock change the job?
From Yukon, Oklahoma, Post is 357 road miles and a 7.2 hour drive from our main office, shaping mobilization planning. Lubbock is 38.9 miles northwest of Post, but that does not change the Yukon distance. The travel distance can affect mobilization for a bore beneath US 84 or a service route near Slaton.
What affects the cost of a directional bore under US 84 in Post when we plan the crossing?
The job’s length and pipe size, Olton clay loam or rock, exposed utilities, pavement, pits and backfill all affect the scope. A US 84 crossing needs highway planning, while a Sand Creek route adds water crossing review. Mobilization planning for Post also reflects the 357 road miles from Yukon, so we account for that travel distance. We price the work from those job details, not from the street name alone.
Where the Post facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Post
- U.S. Census Bureau, TIGER/Line 2024: Post boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Post
- U.S. Census Bureau, American Community Survey 2019 to 2023: Post housing units and year built
- Macrostrat geologic map compilation: map units under Post
- U.S. EPA Safe Drinking Water Information System: public water systems serving Post
- U.S. Department of Transportation, North American Rail Network: track owners in Garza County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Garza County
- U.S. Geological Survey, Elevation Point Query Service: Post elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Post
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Post
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Post, Texas
Type the address of your job in Post. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Post
All counties: Texas county list.
