Roby Texas Directional Boring: Miles Soil, US 180 and Cottonwood Creek
Quick Answer: Can you get a new line beneath a Roby street without cutting the pavement? We take directional boring jobs in Texas, also called horizontal directional drilling (HDD), including crossings near 1st Street. Roby is 299 road miles from our Yukon, Oklahoma main office, with US 180 running through town. The USDA soil survey maps Miles soil across most of Roby, with sandy clay loam below the surface that can grip the pipe. We manage that ground with staged reaming and a planned pullback.
Roby bores at a glance
- County seat of Fisher County, Texas. Population 588 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 299 miles, about 6 hours of driving.
- Ground: Miles soil is mapped on 94 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 180, Texas State Highway 70 and FM 419. State permit office: TxDOT Abilene District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Cottonwood Creek.
- Public water: City of Roby, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in Roby and Fisher County?
Can you get a line beneath a Roby street without opening the pavement? We take directional boring work in Roby and Fisher County, where the Census Bureau Vintage 2024 estimate puts the population at 588. A water, sewer, gas, electric conduit or fiber line can be routed beneath 1st Street or another street to avoid cutting its surface.
Our main office is in Yukon, Oklahoma, and Roby work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that began in 1965, with directional boring work dating to 1982. For a Roby service line or a longer crossing near US 180, our equipment handles sizes from 3/4 inch service lines up to 48 inch casing.

What is Roby ground like to bore through Miles soil?
The USDA soil survey maps Miles soil across 94 percent of Roby, with Miles fine sandy loam on 79 percent of the mapped area and another mapped texture at the surface on 96 percent. About 40 inches down, sandy clay loam is mapped across 97 percent of the area, with an average clay content of 27 percent. Miles and Paducah soil patterns help us frame planning, but they are not substitutes for test borings. For a bore near 1st Street, that cohesive lower layer can hold the hole but may cling to the reamer and pipe.
| USDA soil survey, inside the Roby city limits | What is mapped |
|---|---|
| Soil series mapped | Miles 94 percent and Paducah 3 percent |
| Texture at the surface | fine sandy loam 96 percent and loam 3 percent |
| Texture about 40 inches down | sandy clay loam 97 percent |
| Engineering class about 40 inches down | clayey sand (SC) 94 percent and lean clay (CL) 4 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
Bedrock is not mapped within the top five feet in Roby, though the geologic map shows Quaternary deposits, undivided, and Guadalupian sedimentary rock of Permian age. That does not rule out deeper rock, so a bore near Cottonwood Creek still needs depth and steering checks. The map shows no seasonal water table within 60 inches and no high steel corrosion risk. Flood prone soils cover 3 percent of the mapped area, a reason to plan channel depth carefully near the creek.
How do crews bore Roby sandy clay loam?
Roby’s mapped sandy clay loam can hold a hole and grip the pipe, so the reamer and fluid plan matter. For a route near 1st Street or Cottonwood Creek, we track the head and prepare the line for the pull.
- Roby’s sandy clay loam can cling to a reamer, so we use staged enlargement and plan to pull the line soon after the final pass.
- Near 1st Street, we expose each marked utility on the planned path with hydrovac before the drill approaches; surface paint does not show its depth.
- A walkover locator follows the head beneath Angelo Street, while the crew logs depth and pitch to keep the bore on its planned line.
- At Cottonwood Creek, we plan the bore below the channel and check federal water jurisdiction during planning before setting pits on each bank.

What is in the way of a new line near Roby 1st Street?
US 180, Texas State Highway 70 and FM 419 run inside Roby’s limits, so a route may need to cross a state road as well as local streets. Among the named streets, 1st Street runs 1.78 miles in the city, Angelo Street 1.23 miles and 3rd Street 1.21 miles. A bore under 5th Street or another paved route can keep the surface intact, subject to the road owner’s approval and any highway permit.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 180 | US highway | 1.2 roadway miles inside | State highway office |
| Texas State Highway 70 | State highway | 0.8 roadway miles inside | State highway office |
| FM 419 | State highway | 0.3 roadway miles inside | State highway office |
| Cottonwood Creek | Stream | 0.48 channel miles inside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Roby or within one mile outside its limits, and no street and rail crossing is mapped in town. Cottonwood Creek runs 0.48 channel miles within the city, but public records map no street crossing of a named stream there. We see Cottonwood Creek within Roby’s limits, and no lakes or ponds are mapped within one mile. A creek route still needs depth planning, and the crossing is checked for federal water jurisdiction during planning.
Do I need a permit to bore under Roby US 180?
US 180, Texas State Highway 70 and FM 419 are state routes in Roby, so work in their right of way needs a TxDOT utility permit. The line owner, not the drilling contractor, submits the application through the online RULIS system for review by the TxDOT Abilene District. We prepare the bore plan and profile for the owner’s application. TxDOT cover rules call for 60 inches at highway crossings for electric and communication lines and water lines, and 60 inches for pressurized sewer crossings; the permit may set another depth.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns lines near the City of Roby water system?
The City of Roby public water system uses purchased surface water and reports 673 service connections serving 1,147 people. That network may be near a proposed water or sewer route, so its lines need to be located before a bore near 1st Street. Electric service reported in Fisher County includes AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative and Taylor Electric Cooperative. We confirm the electric line owner for the address before planning a conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Roby | Public water system | Surface water bought from another system | 673 connections, 1,147 people served |
| AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative and Taylor Electric Cooperative | Electric utilities reporting service in Fisher County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Roby’s median housing year at 1959; 51 percent of homes were built before 1960, 42 percent from 1960 to 1999 and 7 percent in 2000 or later. A replacement route near Angelo Street may meet older water or electric lines, while a newer service still needs a clear path. We use hydrovac potholing to expose marked lines before drilling near them, since paint shows position, not depth.

Where is Roby in relation to Rotan?
Roby is in Fisher County and is the county seat. The city covers 0.72 square miles, sits at an elevation of 1,965 feet and uses ZIP code 79543. Rotan is 9.0 miles northwest; Sylvester is 7.7 miles east, and McCaulley is 10.3 miles east. Sweetwater, the nearest larger city, is 19.2 miles south. For a Roby bore, the Yukon, Oklahoma main office is 299 road miles away, about a 6.0 hour drive, which affects mobilization planning.
Places near Roby
- Directional boring in Sylvester: 7.7 miles east
- Directional boring in Rotan: 9 miles northwest
- Directional boring in McCaulley: 10.3 miles east
- Directional boring in Hamlin: 17.4 miles northeast
- Directional boring in Sweetwater: 19.2 miles south
What boring work comes up near Roby’s Cottonwood Creek?
- Street crossing: A route beneath 1st Street can leave the pavement uncut, with pits placed in the dirt on each side.
- Highway crossing: A line beneath US 180 needs the TxDOT permit and bore plan from the line owner before work in the right of way.
- Water service: A new service near the City of Roby system needs its route checked against existing water lines before drilling.
- Creek crossing: A Cottonwood Creek bore needs a planned depth below the channel and a check for federal water jurisdiction.
- Fiber route: A conduit run beneath Angelo Street can avoid opening the street, after marked utilities along the path are exposed.
- State road crossing: A route under Texas State Highway 70 needs TxDOT review when it uses the highway right of way.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Roby bore near 5th Street?
For a Roby quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route near 5th Street may need a different setup than a straight service run, so include the crossing points and surface conditions shown on your plan.
For a route near 5th Street, length and pipe size shape the equipment and reaming plan first. Miles soil’s sandy clay loam can affect fluid and pullback, while pavement or concrete adds setup work. The number of utilities to expose and the presence of a creek crossing also change the scope. Work on US 180 needs its permit details, and the 299 road miles from Yukon affect mobilization.
Questions people ask about boring in Roby
Does Trinity take boring jobs in Roby and Fisher County?
Yes. We take directional boring work in Roby and across Texas, and we keep the customer relationship with Trinity from the first call through the bore log. Our own crews and vetted drilling partners handle the work. For a route beneath 1st Street, we plan the crossing around the street and marked utilities.
Who controls Roby 3rd Street, and can a bore avoid cutting it?
Roby is an incorporated city, so its city streets belong to the city itself. A bore beneath 3rd Street can avoid an open cut, but the street owner must approve work affecting the road. The route and access pits are planned so the crossing stays below the pavement.
Could older buried lines near Roby Angelo Street affect a replacement bore?
They could. The American Community Survey 2019 to 2023 estimates put Roby’s median housing year at 1959, with 51 percent of homes built before 1960. An older service near Angelo Street may have lines in the bore path, so marked utilities are exposed with hydrovac before drilling close to them.
What is Roby Miles soil like for a bore?
The USDA soil survey maps Miles soil across 94 percent of Roby, and sandy clay loam at about 40 inches down across 97 percent. That lower layer can hold an open hole but may cling to the reamer or pipe. We account for it with staged reaming and a planned pullback.
Will we encounter rock beneath the fine sandy loam in Roby during boring work?
Bedrock is not mapped within the top five feet of Roby, but that does not rule out rock deeper down. The geologic map shows Quaternary deposits, undivided, above areas also mapped as Guadalupian sedimentary rock of Permian age. A bore near Cottonwood Creek still needs depth tracking as it advances.
Who approves a Roby bore under US 180?
The line owner applies for the TxDOT utility permit when work uses the US 180 right of way; the contractor does not file it. The TxDOT Abilene District reviews the application in RULIS. We prepare the bore plan and profile for the owner’s submission, with cover requirements set by the permit.
Can Trinity answer after hours about an urgent Roby 3rd Street bore?
Yes. From our Yukon main office, we answer Trinity’s phone 24 hours a day at (405) 409-7423, and Roby is 299 road miles away. For urgent work near 3rd Street, call and describe the line, crossing and access conditions. We also provide 24 hour emergency response, with the job plan depending on the site and scope.
How early should I call Texas811 for a Roby 1st Street bore?
Request a Texas811 locate at least 48 hours before excavation, not counting Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For a bore on 1st Street, the marks show line position, not depth. If they wear off or move, have them refreshed through Texas811 before work continues.
What affects the price of a Roby bore under US 180?
The route length, pipe size and Miles soil conditions matter, along with utilities that must be exposed, pavement, pits and any creek crossing. A US 180 route also involves highway permit planning. The 299 road miles from Yukon affect mobilization. Send the site details so we can assess the actual scope.
Where the Roby facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Roby
- U.S. Census Bureau, TIGER/Line 2024: Roby boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Roby
- U.S. Census Bureau, American Community Survey 2019 to 2023: Roby housing units and year built
- Macrostrat geologic map compilation: map units under Roby
- U.S. EPA Safe Drinking Water Information System: public water systems serving Roby
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Fisher County
- U.S. Geological Survey, Elevation Point Query Service: Roby elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Roby
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Roby
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Roby, Texas
Type the address of your job in Roby. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Roby
All counties: Texas county list.
