Sylvester Texas Directional Boring: Wichita Loam, FM 1085 and Plum Creek
Quick Answer: The top five feet around Sylvester are mapped chiefly as Wichita loam, with no bedrock mapped there; the geologic map identifies Permian Blaine Formation beneath the soil. At about 40 inches, clay loam is common, so the hole can hold while sticky cuttings grip the reamer and pipe. We take directional boring, also called horizontal directional drilling (HDD), work in Sylvester, including routes beneath FM 1085 or Plum Creek. Sylvester is 293 road miles from our Yukon, Oklahoma main office, and a 3rd Street job includes that mobilization.
Sylvester bores at a glance
- Unincorporated community in Fisher County, Texas. Population 52 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 293 miles, about 5.9 hours of driving.
- Ground: Wichita soil is mapped on 39 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 1085 and FM 57. State permit office: TxDOT Abilene District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Plum Creek and Clear Fork Brazos River.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring on 3rd Street in Sylvester?
At the surface, the USDA soil survey maps Wichita loam across 39 percent of Sylvester, with clay loam common at about 40 inches; the geologic map identifies Blaine Formation below. We take directional boring work in this unincorporated Fisher County community, whose population was 52 in the 2020 Census count. Water, sewer, gas, electric conduit and fiber can run beneath routes such as 3rd Street or FM 57, depending on the planned alignment.
Our main office is in Yukon, Oklahoma, and Sylvester work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and our directional boring work dates to 1982; we have had no utility strike in over 25 years. On routes near FM 57, that history goes with careful attention to the buried line owners before a conduit bore.

What does the Wichita soil survey show beneath Sylvester?
The USDA soil survey maps Wichita soil across 39 percent of Sylvester and Tillman soil across 19 percent. Its mapped surface textures include loam across 39 percent, clay loam across 29 percent and fine sandy loam across 17 percent. About 40 inches below the surface, clay loam is mapped across 49 percent and clay across 19 percent; average clay content at that depth is 32 percent. We treat mapped Wichita, Tillman, Yomont, and Westola soil patterns as planning context, not as substitutes for test borings. For a route near FM 1085, the clay rich profile can make cuttings sticky and increase the need to manage reaming and drilling fluid.
| USDA soil survey, inside the Sylvester mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Wichita 39 percent, Tillman 19 percent, Yomont 12 percent, Westola 11 percent and Bippus 10 percent |
| Texture at the surface | loam 39 percent, clay loam 29 percent and fine sandy loam 17 percent |
| Texture about 40 inches down | clay loam 49 percent, clay 19 percent and very fine sandy loam 12 percent |
| Engineering class about 40 inches down | lean clay (CL) 49 percent, fat clay (CH) 19 percent and silty clayey sand (SC SM) 13 percent |
| Average clay content about 40 inches down | 32 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 34 percent of the area |
| High corrosion risk for uncoated steel | 58 percent of the area |
The USDA soil survey maps no bedrock within 60 inches, so the mapped profile does not show shallow rock, though the geologic map names the Permian Blaine Formation. Seasonal water table is not mapped within 60 inches. Flood prone soils cover 34 percent of the mapped area, so a Plum Creek route needs depth planning beneath the channel. High steel corrosion risk is mapped across 58 percent; the line owner should consider casing and tracer wire materials, while HDPE avoids that steel concern.
How do crews bore Sylvester’s clay loam?
Wichita loam and clay loam dominate the mapped ground around Sylvester. We set the bore plan for the route and soil, then watch the cuttings and fluid returns as the hole advances near streets such as 5th Street.
- In Wichita and Tillman clay loam, we use a controlled fluid mix and staged reaming so sticky cuttings do not build up on the reamer or grip the pipe.
- Where the route passes under FM 1085 pavement, the bore plan accounts for TxDOT cover depth and extends beneath all travel lanes on rural highways.
- For a Plum Creek crossing, we plan the bore depth beneath the channel and check the crossing for possible U.S. Army Corps of Engineers jurisdiction during planning.
- Before a drill approaches marked utilities near 3rd Street, we hydrovac pothole each line on the path; surface marks alone do not show burial depth.

What could a new line cross near Plum Creek in Sylvester?
FM 1085 runs 1.5 mapped roadway miles inside the Sylvester community boundary, and FM 57 runs 1.0 mile. For streets, 3rd Street is the longest named route at 1.0 mile; 4th Street measures 0.67 mile, while 5th Street and Moore Avenue each measure 0.58 mile. A bore aligned with these roads can pass below pavement rather than cut across it. The route plan still needs to account for existing utilities and access at the entry and exit pits.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 1085 | State highway | 1.5 roadway miles inside | State highway office |
| FM 57 | State highway | 1 roadway miles inside | State highway office |
| Plum Creek | Stream | 1.74 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Clear Fork Brazos River | Stream | 1.52 channel miles inside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Sylvester or within 1 mile outside its boundary, and none is mapped at a street crossing. Plum Creek runs 1.74 channel miles inside the community, while the Clear Fork Brazos River runs 1.52 miles. Four mapped street crossings intersect named streams. A proposed bore under Plum Creek needs a channel depth plan, and creek crossing plans are checked for U.S. Army Corps of Engineers jurisdiction. Our Sylvester route review distinguishes Plum Creek from lakes and ponds; none are mapped within 1 mile.
Who approves a bore in Fisher County near Sylvester?
Sylvester is an unincorporated community with no city government, so public streets are under county or state authority rather than a city permit office. FM 1085 and FM 57 are state highways. At a highway crossing, the bore cover is set by line type: electric and communication lines need 60 inches below the lowest crossed grade, water needs 60 inches, and pressurized sewer needs 60 inches. For FM 57 crossings, we follow TxDOT requirements by boring or tunneling beneath existing highway pavement and use the TxDOT Abilene District permit office. The line owner files the utility permit in TxDOT’s online RULIS system, and the Abilene District reviews it. We prepare the bore plan and profile for that filing.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines may already be buried in Fisher County near Sylvester?
Before we plan a bore for a Sylvester address, we confirm its water provider with Fisher County or the local water district. County electric service is reported by AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative and Taylor Electric Cooperative; that does not establish which company serves a particular property. Before an electric conduit bore near 3rd Street, we confirm the line owner for that address and expose marked utilities on the route with hydrovac potholing before drilling close to them.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative and Taylor Electric Cooperative | Electric utilities reporting service in Fisher County | EIA Form 861 | Confirm the line owner by address |
Housing figures are not published for a place as small as Sylvester, so there is no reliable local housing age breakdown to use for estimating old line replacements versus new services. In a small community, a route along FM 57 may involve a long service run, and June averages 3.1 inches of rain in Fisher County. That can affect access and ground conditions. We pothole marked utilities on a planned 5th Street route before drilling near them because surface marks show position, not depth.

Do you cover Sylvester and nearby Roby?
Sylvester is in Fisher County, at an elevation of 1,847 feet, and the mapped community covers 0.88 square miles. Its ZIP code is 79560. McCaulley is 4.6 miles northeast, while Roby, the county seat, is 7.7 miles west. Hamlin is 13.4 miles northeast, and Sweetwater is the nearest larger city, 19.8 miles southwest. From our Yukon, Oklahoma main office, Sylvester is 293 road miles away and a 5.9 hour drive. That distance is part of planning mobilization for work near FM 1085 or Plum Creek.
Places near Sylvester
- Directional boring in McCaulley: 4.6 miles northeast
- Directional boring in Roby: 7.7 miles west
- Directional boring in Hamlin: 13.4 miles northeast
- Directional boring in Rotan: 15.5 miles northwest
- Directional boring in Trent: 17.8 miles southeast
- Directional boring in Sweetwater: 19.8 miles southwest
What boring work comes up near 5th Street in Sylvester?
- Highway crossing: A bore beneath FM 1085 needs a route and cover plan for the utility type and the highway pavement.
- Street service: A line beneath 5th Street can avoid cutting the road, with entry and exit pits placed clear of the bore path.
- Creek crossing: A Plum Creek bore needs channel depth planning and a jurisdiction check during the crossing review.
- Fiber conduit: A fiber route along 3rd Street needs existing marked utilities exposed before the drill approaches them.
- Water service: A new service near Moore Avenue needs the address specific water provider confirmed before the bore is laid out.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for work near Moore Avenue in Sylvester?
For a Moore Avenue quote, send the address or map pin, what will go underground, the pipe or conduit size and the footage in one message; a sketch or plans help. The route matters here because Moore Avenue is a named street in a small community, and a nearby service connection may need to cross an existing line or pavement. That changes the bore layout before equipment is mobilized.
A clear route with no creek, highway or pavement crossing is simpler to plan than a bore that needs extra exposures and careful depth control. The price reflects length, pipe size, soil, existing utility crossings, pavement, pits and excavator time. Clay loam near Moore Avenue can affect reaming, while Plum Creek adds crossing planning and FM 1085 brings TxDOT permit and cover details. The 293 road miles from Yukon also shape mobilization. Emergency timing or sand backfill can change the work plan too.
Questions people ask about boring in Sylvester
Does Trinity take directional boring jobs in Sylvester, Fisher County, and who staffs them?
Yes. We take directional boring work in Sylvester, Fisher County. Our own crews and crews at satellite yards run by partner drilling contractors Trinity has vetted can staff the work, while you deal with Trinity through the bore log. A proposed line near 3rd Street is planned for its exact route and existing utilities.
Does Wichita soil in Sylvester create a corrosion concern, and what pipe can be used?
The soil survey maps high steel corrosion risk across 58 percent of Sylvester, so the line owner should consider casing and tracer wire materials for a route near FM 57. When comparing materials for a 4th Street bore, we remember HDPE does not share that steel corrosion concern. The soil map describes area patterns, not the result of a test at a specific property.
What ground does a bore pass through in Sylvester near Wichita soil?
The survey maps Wichita soil across 39 percent of Sylvester, with clay loam across 49 percent at about 40 inches below the surface. Clay is mapped across another 19 percent at that depth. Those conditions can make cuttings sticky and affect reaming near routes such as FM 1085, so the bore plan is adjusted to the actual alignment.
Can the mapped loam surface soil alone tell us whether a directional bore in Sylvester will hit rock?
Bedrock is not mapped within 60 inches in Sylvester, but that does not rule out deeper rock. The geologic map identifies the Permian Blaine Formation, which includes shale, sandstone, gypsum and dolostone. A bore near Plum Creek still needs a route specific plan because mapped geology does not replace checking conditions along the actual path.
Who approves a bore under FM 1085 in Sylvester, and which TxDOT office reviews it?
The utility owner applies for the TxDOT utility permit through RULIS for work in the FM 1085 right of way, and TxDOT’s Abilene District reviews it. We prepare the bore plan and profile for the owner’s filing. Pavement crossing design also accounts for the cover depth required for the line type and the highway grade.
Can a line be bored under Plum Creek in Sylvester?
A line can be planned to pass under Plum Creek, which has 1.74 channel miles inside Sylvester. The design must account for depth beneath the channel, and the creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Flood prone soils cover 34 percent of the mapped area, so the exact route matters.
What bore sizes and lengths can Trinity handle for a job near Moore Avenue in Sylvester?
We handle lines from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The right setup for Moore Avenue depends on the route, material and crossings. Send the location, what is going underground, the size and footage, plus a sketch or plans if available.
How much notice does Texas811 need before a bore on 3rd Street in Sylvester, and what if marks move?
For a 3rd Street bore, place the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. The ticket has a 20 day life. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks need refreshing through Texas811 before work continues.
How do mapped Wichita and Westola soils affect directional boring costs near FM 1085 in Sylvester?
The route and scope drive the price, not one local rate. Length, pipe size, clay loam, utility exposures, pavement, pits, creek crossings and excavator time all matter. A bore by FM 1085 also needs highway depth and permit planning, while Plum Creek adds crossing review. Mobilization reflects the 293 road miles from Yukon.
Where the Sylvester facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Sylvester
- U.S. Census Bureau, TIGER/Line 2024: Sylvester boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Sylvester population count
- Macrostrat geologic map compilation: map units under Sylvester
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Fisher County
- U.S. Geological Survey, Elevation Point Query Service: Sylvester elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Sylvester
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Sylvester
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Sylvester, Texas
Type the address of your job in Sylvester. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Sylvester
All counties: Texas county list.
