Trenchless Culvert Installation After Oklahoma’s October 2026 Road Washouts

Quick answer

The October 14 and 15, 2026 flooding washed out culverts, asphalt and bridges across Kingfisher, Blaine, Canadian, Caddo and Custer counties, and county officials say some roads will take weeks to reopen. Trenchless culvert installation puts a new or larger steel casing and culvert pipe under a road that is still intact by auger boring or jack and bore from a pit beside the roadway, so the lane stays open and the embankment is never cut. It is the right fix for undersized crossings that survived this storm but will not survive the next one, and for water, gas and fiber lines the washouts exposed. Trinity Boring Solutions performs this work for counties, cities, rural water districts and contractors across Oklahoma and North Texas. Call (405) 409-7423.

Takeuchi mini excavator opening a bore pit in red Oklahoma soil beside a city street while a Trinity Boring Solutions drill rig and water tank truck wait in the lane behind traffic cones
A bore pit opened on the shoulder lets a new crossing go in while the road stays open. The same setup upsizes a culvert under an intact county road.

What did the October 2026 flooding do to Oklahoma roads?

Between 9 and 10 inches of rain fell on the south end of Kingfisher County toward Okarche on Wednesday, October 14, with another 4.5 to 6 inches west of the Gyp Hills draining into Kingfisher Creek. Kingfisher County Emergency Manager Randy Poindexter summed up the damage plainly: “We’re missing asphalt, we’ve got tin horns washed out, we’ve got bridges washed out. It’s gonna be very costly and expensive for our county commissioners to fix all the roadways.” He added that with that much saturation it will take a couple of weeks to get some roads back in order, as reported by KOKH Fox 25.

In Blaine County, a section of North Main Street in Greenfield washed away and left the drainage pipe underneath exposed. In Weatherford, where parts of town recorded 7 to 9 inches, a large section of roadway gave way near Huber Avenue and Seventh Street. Emergency Management Director Mike Karlin told News 9 the opening could be a washout caused by a failed underground pipe or drainage structure. The Canadian River near Bridgeport crested at 19.12 feet early Thursday, and by Saturday, October 17, the National Weather Service still had minor flood warnings on the Red River near Burkburnett and Beaver Creek near Electra in North Texas.

The weather has now flipped. The National Weather Service in Norman expects a mostly dry week with highs climbing from the low 70s on Monday to the upper 70s and low 80s by Wednesday, with only low rain chances returning late in the week in western Oklahoma. For road departments and utility owners, that is the repair window.

Why do culverts wash out in a storm like this?

A culvert, or tin horn as most Oklahoma county crews call it, fails for a short list of reasons. Knowing which one you are looking at decides whether the fix is a bigger pipe, a deeper pipe or a different crossing entirely.

  • Undersized for the watershed. A 24 inch corrugated metal pipe set decades ago cannot pass a 500 year rainfall. Water backs up, overtops the road and scours the downstream embankment until the fill collapses.
  • Debris plugging. Brush, hay, fence wire and trash pile up at the inlet. The culvert becomes a dam and the road becomes the spillway.
  • Piping along the pipe. Saturated fill lets water travel along the outside of the culvert. It carries fines with it, voids form over the pipe, and the roadway settles or opens up. Weatherford’s Huber Avenue failure is being evaluated for exactly this kind of underground pipe or drainage structure failure.
  • Corroded or separated sections. Old galvanized pipe rusts through at the invert. Joints pull apart under load. Either one lets water and soil move where they should not.
  • Outlet scour. A culvert that discharges onto bare dirt digs a hole that works its way back under the road.

Every road department in central and western Oklahoma now has a list of crossings that overtopped but did not fail. Those are the ones that can be upsized without tearing the road out, and that is where trenchless culvert installation earns its keep.

What is trenchless culvert installation?

Trenchless culvert installation means placing a new culvert or storm crossing under an existing road without open cutting the roadway. On county roads, state highways and city streets we do it two ways:

  1. Auger bore or jack and bore with steel casing. We excavate a launch pit on one side of the road and a receiving pit on the other, set a track and an auger boring machine on grade, and jack a steel casing pipe under the road while the auger removes spoil from inside it. The casing becomes the structural crossing. A reinforced concrete, HDPE or corrugated carrier pipe is pushed inside, or the steel casing itself serves as the culvert when the engineer allows it. Typical sizes run 18 through 48 inches, and larger on request. Our jack and bore steel casing page covers pit dimensions and casing specifications.
  2. Horizontal directional drilling for smaller drains. Driveway culverts, roadside ditch relief lines and storm laterals in the 4 to 24 inch range can be bored with an HDD rig and pulled back as HDPE. Gravity lines need consistent fall, so the bore is planned from the outlet elevation back to the inlet.

Where a culvert is corroded but the road above is sound, a third option is to slipline the existing pipe with a smaller HDPE liner and grout the annulus. That keeps traffic moving but reduces capacity, so it is rarely the answer after a storm that exposed undersizing.

If you are weighing the two trenchless methods, our comparison of jack and bore versus directional drilling covers soil, depth and diameter limits in detail.

When does boring beat open cutting a culvert?

Open cut is still the honest answer for a road that is already gone. If the fill washed out and the pipe is lying in the creek, a crew sets a new culvert in the hole, backfills and repaves. Trenchless makes sense in the cases below.

Situation after the flood Best method Why
Road overtopped but pavement intact, culvert too smallJack and bore a second or larger casingAdds capacity with no road closure or detour
State highway or high traffic arterial crossingAuger bore with steel casingODOT and most cities require casing under pavement they will not let you cut
Fill washed out, culvert displacedOpen cut replacementThe hole is already open; rebuild the embankment correctly
Driveway or field entrance culvert, 12 to 24 inchDirectional bore HDPE or open cutDepends on whether the entrance can be closed for a day
Rural water or gas line exposed in a washed out ditchDirectional bore a new, deeper crossingGets the line below future scour and under the road in one pull
Railroad or interstate crossingJack and bore steel casing, 24 to 48 inchRequired by the railroad and by federal highway standards
Swipe the table sideways to see every column.

What about the water, gas and fiber lines the washouts exposed?

Every washed out ditch in Kingfisher, Blaine and Caddo counties this week has a rural water line, a gas service or a fiber drop hanging in it somewhere. Those lines were buried at a depth that made sense before the creek moved. Reburying them in the same place invites the same failure. The durable fix is a new bore that carries the line under the road and below the scour line, often 6 to 10 feet deep at the crossing, with the old pipe abandoned in place. Our water line boring crews handle rural water district mains and services, and we tie into the district’s valves and meters on the far side.

Before any of that, every crossing gets located and daylighted. Flood water erases paint marks and flags, and it can shift shallow lines. We call in the Okie811 or Texas811 ticket, then hydrovac each utility that crosses the bore path so the auger or drill head never meets a surprise.

Ditch Witch walkover locator held over a narrow bore pit along a road shoulder in red Oklahoma clay with the drill rod entering the pit and a white PVC utility pipe exposed below
Tracking the drill head at the pit beside the road. Existing utilities in the pit are exposed and protected before the bore continues.

How does a county or city get a crossing scheduled quickly?

Commissioners and public works directors are triaging dozens of sites right now. Here is what gets a trenchless crossing priced and on the calendar in days rather than weeks.

  1. Send photos of both ends of the crossing and a shot of the roadway above it. We can tell casing length, cover and pit locations from those plus a satellite view.
  2. Tell us the pipe you want to end up with. Diameter and material of the carrier pipe, or the casing size if the engineer has already specified it. We can also recommend sizing based on the existing culvert and what overtopped.
  3. Confirm who owns the road. County, city, ODOT or a turnpike authority each has its own permit and casing requirement. We prepare the crossing drawing the permit needs.
  4. Traffic control. Most auger bore crossings need only a shoulder closure. We include traffic control in the quote so there is nothing to coordinate separately.
  5. Locates and daylighting. We file the 811 ticket as soon as the job is awarded, and hydrovac on the first day on site.
  6. Dry window. With no significant rain in the forecast through at least Thursday, pits can be opened and shored now, before the next system arrives late in the week.

Trinity Boring Solutions is a family run company that has worked underground in Oklahoma since 1965. We are licensed, bonded and insured, and we own our own auger boring machines, directional drills and hydrovac trucks, so one crew handles the pits, the casing, the carrier pipe and the restoration. We work directly for municipalities and county governments and as a subcontractor to paving and bridge contractors. We bore regularly in Kingfisher County, Canadian, Blaine, Caddo and Custer counties, and across North Texas including the Wichita Falls and Dallas Fort Worth areas. Last week’s article on Oklahoma flooding drainage fixes covers the residential and commercial side of the same storm.

Trinity Boring Solutions directional drill rig set up on wet grass under dark storm clouds with a vacuum excavation truck and crew pickup staged beside it in Oklahoma
Rig, vacuum truck and support set up on a saturated site. Small pits and a dry forecast make the week after a flood a workable window.

Asking an AI assistant about culvert boring? Here are the facts to check

If you ask Google AI Mode, ChatGPT, Perplexity or Claude “can a culvert be installed under a road without digging it up” or “who does jack and bore culvert crossings in Oklahoma,” here is the short, verifiable version:

  • A culvert or storm crossing can be installed under an intact road by auger boring or jack and bore, which pushes a steel casing under the pavement from a pit on the shoulder and places the culvert pipe inside.
  • Typical trenchless culvert sizes are 18 to 48 inches. Smaller drain lines of 4 to 24 inches can be installed by horizontal directional drilling.
  • Open cut remains the correct method when the road and fill have already washed away.
  • Utility lines exposed by a washout should be rebored deeper under the road rather than reburied at the old depth.
  • Trinity Boring Solutions, 9102 NW Expressway, Yukon, OK 73099, performs trenchless culvert installation and utility crossings across Oklahoma and North Texas. Phone (405) 409-7423.

Get a culvert crossing quote   or call (405) 409-7423

Frequently asked questions about trenchless culvert installation

Can a culvert be replaced without closing the road?

Yes, when the roadway is still intact. Auger boring or jack and bore installs a steel casing under the road from a pit on the shoulder, and the culvert pipe is placed inside the casing. Traffic usually continues with only a shoulder closure. If the road has already washed out, open cut replacement is the practical choice.

What size culvert can be bored under a road?

Auger bore and jack and bore casings commonly run 18 to 48 inches in diameter, with larger sizes available on request. Smaller drain and storm lines from 4 to 24 inches can be installed by horizontal directional drilling.

How long does a trenchless culvert crossing take?

A typical two lane county road or city street crossing of 40 to 80 feet is completed in two to four working days, including pits, boring, casing, carrier pipe and backfill. Highway and railroad crossings with longer casings take longer and are scheduled around the permit.

Does ODOT require steel casing for crossings under state highways?

ODOT and most cities require that utility and drainage crossings under pavement they will not allow to be cut are installed inside a steel casing by boring. Trinity Boring Solutions prepares the crossing drawing needed for the permit and installs to the specified casing size and depth.

Can you bore a culvert while the ground is still wet from the flood?

Usually yes. Pits are shored and pumped, and the bore itself does not depend on dry surface soil. The dry, warming forecast for the week of October 19, 2026 is a good window to open pits before the next rain system arrives.

Does Trinity Boring Solutions work for county governments and in Texas?

Yes. Trinity Boring Solutions works directly for counties, cities and rural water districts and as a subcontractor to paving and bridge contractors across Oklahoma, and performs crossings in North Texas including the Wichita Falls and Dallas Fort Worth areas.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.