trinityboringsolutions.com

Lake Medina Shores Texas Directional Boring: Kerrville Soil, Medina River And Medina Lake

Quick Answer: The Medina River is the main natural crossing to plan around, and we take directional boring, also called horizontal directional drilling (HDD), work in Lake Medina Shores, Texas. Lakeshore Drive runs through the community, about 525 road miles from our Yukon, Oklahoma main office. Kerrville gravelly clay loam is widely mapped here, and rock close to the surface can slow drilling and affect steering. We adjust the bore plan to the ground and the exact crossing.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Lake Medina Shores bores at a glance

  • Unincorporated community in Bandera County and Medina County, Texas. Population 1,110 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 525 miles, about 10.3 hours of driving.
  • Ground: Kerrville soil is mapped on 52 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 84 percent of the area.
  • No state or US highway is mapped inside the boundary or within a mile and a half of it.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Medina River and Rocky Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring on Lakeshore Drive in Lake Medina Shores?

We take directional boring work in Lake Medina Shores, an unincorporated community in Bandera County and Medina County. The Census Bureau counted 1,110 people here in 2020. Along Lakeshore Drive or Whartons Dock Road, our crews can bore routes for water, sewer, gas, electric conduit or fiber, with the path and line size set for the address.

Our main office is in Yukon, Oklahoma, and Lake Medina Shores work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have made bores since 1982 as a family business started in 1965. Our longest bore ran roughly 4,100 feet under the Arkansas River in Tulsa; a service bore near Lakeshore Drive is a much smaller job planned around local soil and crossings.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What is Kerrville soil like to bore in Lake Medina Shores?

The USDA soil survey maps Kerrville soil across 52% of Lake Medina Shores, with gravelly clay loam surface texture mapped across 52%. Kerrville gravelly clay loam, 1 to 8 percent slopes, covers 42% of the mapped area. About 40 inches down, the survey maps bedrock across 57% and cemented material across 26%. Average clay content at that depth is 48%. These are mapped soil patterns, not test borings. Clay can cling to a reamer, so the drill plan may call for thinner fluid and staged reaming.

USDA soil survey, inside the Lake Medina Shores mapped community boundaryWhat is mapped
Soil series mappedKerrville 52 percent, Pratley 26 percent and Eckrant 3 percent
Texture at the surfacegravelly clay loam 52 percent, silty clay 27 percent and very cobbly clay 5 percent
Texture about 40 inches downbedrock 57 percent and cemented material 26 percent
Average clay content about 40 inches down48 percent
Bedrock mapped within 60 inches84 percent of the area (57 percent hard rock, 27 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel33 percent of the area

Bedrock is mapped within 60 inches across 84% of the community, including hard bedrock across 57% and weathered bedrock across 27%; typical depth is 29 inches. The Glen Rose Formation, of Albian age, includes limestone, dolostone and marl, so a rock tool may be needed where the bore meets hard material. Seasonal water table and flood prone soils are not mapped within 60 inches. High steel corrosion risk is mapped across 33%, so the line owner should consider casing and tracer wire material.

How do we bore through bedrock in Lake Medina Shores?

Kerrville gravelly clay loam and shallow mapped bedrock call for a bore plan that accounts for changing ground. Near Lakeshore Drive, we locate utilities, set the path, then drill and track the head.

  1. We pothole every marked utility on the planned route before drilling near it; on Lakeshore Drive, locate paint gives position but not burial depth.
  2. Kerrville gravelly clay loam can cling to the reamer, so we can use thinner drilling fluid and open the hole in stages.
  3. Where shallow mapped bedrock meets the Glen Rose Formation, we may change to a rock tool and slow down through the hard section.
  4. We track the drill head from the surface and log depth and pitch; near the Medina River, the planned path also accounts for the water crossing.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

Where might a line go under the Medina River in Lake Medina Shores?

No highways are mapped inside the Lake Medina Shores community boundary or within 1.5 miles outside it. The longer routes here follow local streets: Lakeshore Drive runs 4.21 miles inside the community, Whartons Dock Road 3.26 miles and Northeast Drive 1.39 miles. Oak Lawn Drive adds another local route. A bore can keep pavement and driveways intact, but the entry and exit pits still need workable space beside the chosen street.

CrossingTypeMapped extentWho has a say
Medina RiverStream4.14 channel miles insideChecked for Corps of Engineers jurisdiction
Rocky CreekStream1.05 channel miles insideChecked for Corps of Engineers jurisdiction
Spires CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Bruins CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Spanish Oak CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Medina LakeLake or pond2,701 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside the community or within 1 mile outside it, so no local track crossing is identified. The Medina River runs 4.14 channel miles inside Lake Medina Shores, and Rocky Creek runs 1.05 miles. One street crossing of a named stream is mapped, but the records do not identify the street. Medina Lake is also inside the community; a planned water crossing is checked for federal jurisdiction.

Who approves a bore in Bandera County near Lake Medina Shores?

Lake Medina Shores has no city government, so local streets such as Lakeshore Drive and Northeast Drive are not under a city street department. Confirm the applicable road authority for the address before planning work. If a route reaches a state highway right of way, TxDOT’s San Antonio District reviews the utility permit. The utility owner, not the drilling contractor, files in RULIS; we prepare the bore plan and profile for the owner’s application. A Medina River crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. No railroad crossing is mapped here.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns buried lines in Bandera County at Lake Medina Shores?

The water provider for the specific address has to be confirmed with the city, the county or the local water district before a bore is planned. EPA drinking water records do not tie systems to towns, so a provider could not be matched to Lake Medina Shores. City of San Antonio and Bandera Electric Cooperative report electric service in Bandera County. For a conduit route near Oak Lawn Drive, confirm the line owner and conduit specifications before setting the bore path.

Line ownerWhat it isSourceSize
City of San Antonio and Bandera Electric CooperativeElectric utilities reporting service in Bandera County and Medina CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put the median housing year in Lake Medina Shores at 1994. The survey estimates 2% of homes were built before 1960, and 46% were built in 2000 or later. A replacement route near Whartons Dock Road may meet older buried lines, while a new service needs a path from the existing connection. We hydrovac pothole every marked utility on the bore path before drilling near it; paint shows position, not depth. For example, a marked line under Northeast Drive must be exposed before the drill approaches.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Lakehills and Lake Medina Shores?

Lake Medina Shores is an unincorporated community mainly in Bandera County, with 5% of its mapped area in Medina County. It covers 3.09 square miles at an elevation of 1,117 feet, and its ZIP code is 78003. Lakehills is 3.0 miles east; Bandera, the county seat, is 7.8 miles northwest. From our Yukon, Oklahoma main office, the drive is 525 road miles and 10.3 hours. We take work around Lakehills and other rural sites as well as Lakeshore Drive.

Places near Lake Medina Shores

Which jobs call for a bore along Lakeshore Drive in Lake Medina Shores?

  • Water service: A new service bore beside Lakeshore Drive can avoid cutting the street while connecting the address to its confirmed water provider.
  • Sewer replacement: A route near Whartons Dock Road can pass below pavement, with pits placed in available dirt on each side.
  • Fiber drop: A conduit bore near Northeast Drive can keep the route below the street surface and avoid open cutting.
  • Electric conduit: Near Oak Lawn Drive, confirm the line owner and expose marked utilities before drilling the proposed conduit path.
  • River crossing: A line planned beneath the Medina River needs a checked route and a review of federal jurisdiction during planning.
  • Lake crossing: A proposed route near Medina Lake needs its entry, exit and water crossing considered before drilling begins.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for Oak Lawn Drive in Lake Medina Shores?

A map pin matters on Oak Lawn Drive because the exact spot determines whether the bore meets pavement, a driveway or a marked utility. Send the address or pin, what goes in the ground, the pipe or conduit size and the footage. A sketch or plans help us lay out a route near the Medina River or a local street.

A short route through open ground near Oak Lawn Drive is simpler to plan than a long bore with several exposed utilities or pavement to avoid. Price depends on length, pipe size, the Kerrville soil and any hard bedrock, plus crossings, pits, excavator time and backfill. A Medina River crossing adds planning needs. The 525 road miles from Yukon also affect mobilization, as can emergency timing or a high profile location.

Questions people ask about boring in Lake Medina Shores

Does Trinity Boring Solutions take jobs in Lake Medina Shores, Bandera County, and who does the work?

Yes. We take directional boring jobs in Lake Medina Shores, including routes near Lakeshore Drive. Trinity stays responsible from the first call through the bore log. Work is staffed by our own crews or by drilling contractors operating satellite yards that Trinity has personally vetted.

Who owns electric lines in Lake Medina Shores, Bandera County, and who confirms conduit specs?

City of San Antonio and Bandera Electric Cooperative report electric service in Bandera County, but that does not establish which one serves a particular Oak Lawn Drive address. Confirm the line owner and conduit specifications with the utility before planning a bore. We do not assume one provider serves every property.

Who is in charge of Northeast Drive in Lake Medina Shores, and does it need to be cut?

Lake Medina Shores is unincorporated and has no city government, so Northeast Drive is not a city street. Confirm the road authority for the specific location. A directional bore can pass beneath pavement without an open cut, with entry and exit pits set in dirt beside the route.

How old are homes and buried lines near Whartons Dock Road in Lake Medina Shores?

The American Community Survey 2019 to 2023 five year estimates give a median housing year of 1994. That does not establish the age of a buried line near Whartons Dock Road. A replacement bore should expose marked utilities with hydrovac before drilling nearby, since surface marks do not show line depth.

Does Kerrville soil in Lake Medina Shores corrode steel, and what pipe is used?

The USDA soil survey maps high steel corrosion risk across 33% of Lake Medina Shores. The line owner chooses any coating for steel casing or tracer wire. HDPE is not affected by soil corrosion. The actual material choice depends on the line design and the conditions along the specific Kerrville soil route.

What ground will a bore through Kerrville soil in Lake Medina Shores encounter?

The USDA soil survey maps Kerrville soil across 52% of the community, with gravelly clay loam at the surface across 52%. About 40 inches down, bedrock is mapped across 57% of the area and cemented material across 26%. Those mapped patterns guide planning, but they are not test borings at a Lakeshore Drive address.

Does Trinity cover Lakehills and rural places outside Lake Medina Shores?

Yes. We take work in Lakehills, 3.0 miles east of Lake Medina Shores, and at rural sites beyond the mapped community boundary. The route and scope still need to be checked at the address, including access and any stream crossing such as the Medina River.

How much notice does Texas811 need for a bore on Lakeshore Drive in Lake Medina Shores?

Request a Texas811 locate at least 48 hours before excavation, not counting Saturdays, Sundays or legal holidays, and no earlier than 14 days before work. If a Lakeshore Drive start slips more than 14 days past the original notice, submit a new one. Refresh worn or moved marks before work continues.

What affects the cost of a Medina River bore in Lake Medina Shores?

The Medina River crossing, bore length, pipe size and ground conditions all affect the scope. Hard bedrock, pavement, the number of utilities to expose, pits and backfill can add work. Mobilization also matters because Lake Medina Shores is 525 road miles from our Yukon, Oklahoma main office. We need the location and plans to assess the job.

Where the Lake Medina Shores facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Lake Medina Shores

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Lake Medina Shores, Texas

Type the address of your job in Lake Medina Shores. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Lake Medina Shores

County: Medina County directional boring. Same county: Hondo · Devine · Castroville · Natalia · LaCoste · Lytle · D'Hanis · Yancey. All counties: Texas county list.